-
It's not necessary if you're in the north.
The swimming pool is a symbolic venue, first of all, the equipment is more complex, in addition to the swimming pool, there are various water purification equipment, the daily cost is large, the input is large, but the output is not much (relative to the input).
But having a swimming pool can increase the impact to a certain extent, and having a gymnasium with a swimming pool and other facilities must not be bad.
And the basketball court is a must, and if you don't use it, you can convert it into a badminton and table tennis court, which is more economical.
-
No, generally building a three-star hotel requires a swimming pool, and the gymnasium does not seem to have a hard and fast rule.
-
Of course, there must be, because swimming is also one of the sports.
-
It is not necessary, the clubhouse is mandatory.
-
It is a basic amenity.
-
No, as long as there is a basketball hall.
-
Not necessarily, it can be with or without it.
-
Not necessarily, of course, there is the best.
-
Not necessarily, depending on the customer's preferences and individuals.
-
Not necessarily, with actual needs.
-
It can be there or not.
-
There should be, because the general good ones should be there.
-
Generally good ones should be available.
-
Not necessarily, what you want?
-
Not necessarily, you can build a basketball stadium or something.
-
Hello, I'm glad to answer for you: The rationality of building a swimming pool is 1. Try to choose a ground location where the main structure can meet the construction requirements or there is no underground space. According to the international swimming pool standard, the swimming pool of the swimming pool is generally built with a standard size of 50*25 meters, and the first consideration is the load-bearing problem, and the load-bearing capacity of most building structures is 400 kg per square meter.
The swimming pool is required to reach at least 2000 kilograms per square meter, so the general swimming pool construction project should choose the swimming pool made of land steel structure of the bridge, so it is recommended to choose the first floor or underground location that does not need to be reinforced to select the site for the construction of the swimming pool will greatly reduce the construction cost. 2. Swimming pool pool, due to the large amount, the most important thing to pay attention to is whether the technical parameters of the designed water treatment equipment can meet the needs of the swimming pool water quality, the general 50-meter steel structure swimming pool needs to be equipped with equipment and the number of: 4 swimming pool water circulation systems, 4 cleaning and filtration systems, 1 disinfection system, 2 automatic dosing systems, 1 water quality testing system and 2 swimming pool constant temperature systems, Only according to the design of the swimming pool water storage plan, the equipment equipped with the swimming pool can ensure that the water quality of the swimming pool meets the national (steel structure swimming pool water quality standard).
3. Formal swimming pool places need to be planned: children's swimming pool area (for children's beginner learning and swimming) and training pool area (for training and learning, the water depth is shallow, and other facilities are basically the same as the competition swimming pool), and reasonable design and planning can meet the needs of different users. 1. The construction of the steel structure swimming pool of the swimming pool requires that the ground must be flat and smooth, the flatness of the swimming pool installation area should be 2 cm, and the installation space of meters -1 meter around the wall around the swimming pool needs to be reserved, only in this way can the most basic installation conditions of the steel structure swimming pool of the swimming pool be obtained, and the swimming pool assembly needs to be installed by a professional swimming pool manufacturer with more swimming pool design drawings, and the installation can be fastened with an automatic socket wrench with adjustable torque, and the overall swimming pool construction process is simple and fast.
2. The installation of swimming pool waterproof film is the most decisive level of rent of a swimming pool manufacturer, and the installation of swimming pool film has high requirements for the technology of construction personnel. First of all, after the waterproof pool membrane is hung up, the pool wall and the pool floor around the inside of the swimming pool need to be smooth and smooth without wrinkles, and then there is the weld splicing, the welding texture thickness is uniform, the texture is clear, and there is no bulge or depression.
-
At present, the material living standard is constantly improving, and people pay more attention to personal health management. Because swimming can not only help people get in shape, but also improve lung capacity and enhance cardiopulmonary capacity. This sport is supported and favored by a large part of the population.
The swimming pool market is also booming, and more and more swimming pool construction projects are emerging.
In order to stand out from the many swimming pool construction projects in the market, we need to base ourselves on the following three aspects: pool design, pool construction and pool equipment, and we need to do all these three aspects well.
The swimming pool construction project should first do a good job in the design of the swimming pool. If the blueprint is not well drawn, all efforts on this basis will be in vain. For example, the small flow of inlet and outlet water per unit time of the designed swimming pool will affect the circulation cycle of the swimming pool, and the water quality of the swimming pool cannot meet the national standard; If the upper space of the designed swimming pool is too short, it is not conducive to exhaust air and dehumidification, resulting in an increase in the humidity of the entire swimming pool and endangering the health of swimmers; The pipe selected during the design is wrong, the pipe is easy to corrode, and the actual service life is far lower than the design service life.
After the construction of the swimming pool is completed, it must not only meet the pressure requirements, but also meet the waterproof standards. In order to meet these conditions, swimming pool construction is a kind of engineering project with high professional requirements and cumbersome construction procedures. Just if you want to pass the construction of the bottom of the swimming pool, you need to pour concrete, leveling, waterproof layer, leveling again, and decoration of the bottom of the pool in four steps according to the process to complete the construction work.
If the pool construction team is not professional and the qualifications are not complete, the quality of swimming pool construction cannot be guaranteed, and serious safety hazards are buried.
After the tailor-made design drawings and professional construction team are all in place, if there is no swimming pool equipment on site or the type of equipment is wrong. Nor can the swimming pool construction project be successfully completed. Swimming pool equipment includes circulating filtration equipment, disinfection equipment, dehumidification and heating equipment and other ancillary equipment.
These devices all have their own irreplaceable role in the whole system, and a qualified swimming pool, these equipment are indispensable.
The three aspects of swimming pool equipment, swimming pool construction and swimming pool equipment are an organic combination. Three aspects are equally important, in the process of swimming pool construction, no matter which aspect is not done well, it is related to the quality of the swimming pool project. Therefore, when we build a swimming pool, it is best to find a professional swimming pool contractor who provides one-stop service to take over the project as a whole.
This can ensure that the three aspects can be planned and coordinated with each other.
Shandong Shangshui Environmental Science and Technology Co., Ltd. has been engaged in hot spring & swimming pool construction projects for 12 years, and has exported thousands of successful cases. Provide customers with tailor-made design, one-stop equipment procurement, professional team installation and after-sales maintenance and hosting of the whole industry chain of swimming pool services. Shandong Shangshui, do a good job of swimming pools.
-
The swimming pool can be built alone, or combined with other sports facilities to form a sports complex, or attached to schools, hotels, parks, etc.
The main points of the design are:
The layout of the building should consider the functional partition of athletes, spectators and management, and the routes should not interfere with each other.
The stands of the competition hall are generally arranged on one or both sides of the competition pool and the diving pool, and care should be taken to prevent glare on the water surface.
The swimming pool has a competition pool, a practice pool, a diving pool, a water polo pool, a comprehensive pool, a children's pool, a wave pool, etc.; There is also a pool for diving, competitions, and water polo. The international standard size of the competition pool is 50 meters long, not less than 21 meters wide, and the water depth is more than one meter, and the pool is equipped with 8 swimming lanes, and is equipped with a starting platform, automatic timer, buoys, ropes and observation windows. The size of the plunge pool depends on the type of dungeon.
There are three types of jumps: 3 meters, 5 meters and 10 meters. The depth of the water depends on the height of the jumping platform and springboard. The structure of the swimming pool should be strong and durable, no leakage, the dimensions must meet the standard, and all kinds of equipment and construction treatment must ensure the safety of swimmers.
The pool body is generally made of reinforced concrete, the simple pool can also be made of masonry, and some small pools can also be made of aluminum alloy structure or paved with plastic lining on the inside of the concrete, steel and wooden pool wall. The indoor air in the swimming pool is hot and humid (pool water temperature 24 29, indoor temperature 25 34), and contains a large amount of chloride, and the competition hall also needs to meet the different needs of spectators and athletes at the same time, so the requirements for air conditioning are high. In cold areas, it is necessary to consider preventing condensation on the surface of the enclosure structure and corrosion of various component materials.
Reduce indoor noise and do a good job of sound processing, shorten the reverberation time, improve the sound quality, and create a good acoustic environment.
Use pool water that meets hygienic standards. Water treatment can be used to circulate the filtration water supply system, the polluted pool water is continuously pumped out, purified, disinfected, and heated before being put back into the pool; The small pool can also be sterilized, sedimented and suction of drugs that are harmless to people.
-
Baby swimming pool looking for seashell baby swimming equipment, help you build a swimming pool one-stop service!
-
This one is too difficult, you'd better go to a construction company**.
-
Legal analysis: The total population layout should be obvious, not less than two, and lead to urban roads in different directions. The effective width of the entrance and exit of the audience should not be less than the outdoor safety evacuation index of 100 people in Chi Sun Zhi;
The road should meet the requirements of passing fire trucks, the net width should not be less than the yard min, and the net height should not be less than 4m when there are obstacles in the sky or cross the building. The fire lanes around the sports building should be circulated;
There should be evacuation channels and distribution venues at the entrances and exits of the audience, and the venue should not be less than people, and roads, open spaces, roofs, platforms, etc. can be fully utilized;
Some dedicated parking lots (VIPs, athletes, staff, etc.) should be located in the base;
Functional zoning of the building should be determined. It can be divided into competition area, audience area, athlete area, competition management area, news area, VIP area, field management operation area, etc.;
The characteristics and requirements of the sports in which persons with disabilities participate should be taken into account, and the needs of audiences with disabilities should be met;
The perimeter of the sports field boundary must meet the requirements of buffer distance, traffic width and safety protection in accordance with the rules. The requirements for referees and reporters to work in the area and the size of the clear height above the sports field should meet the requirements of the game and practice.
The installation, fixation, replacement and handling needs of field sports equipment should be considered;
There should be no less than two entrances and exits of the site, and their size should meet the requirements of convenient access for personnel, evacuation safety and equipment transportation;
The number of seats for disabled spectators is 2/1,000, which is convenient for disabled people to sit and evacuate.
Legal basis: Article 7 of the Construction Law of the People's Republic of China.
Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the state, apply to the people's construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department.
Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit.
Name and address of the tenderee.
The name, quantity, technical specifications, and funds of the tendered goods**. >>>More
The first keyless entry.
The "keyless entry system" is not a traditional key, it has an intelligent electronic chip inside, and when you step into a specified range, the system can recognize you as an authorized driver and automatically unlock the door. In the past, this configuration was only available in luxury models, but now many independent brands have popularized it and is a very practical configuration. >>>More
On the coal mine, I would like to add a few points:
1. Emergency avoidance system drill. It involves safety monitoring and monitoring system, personnel positioning system, communication system, compressed air self-rescue system, water supply rescue system, and emergency avoidance system (which has not yet been established in China). >>>More
The main computer repair tools are:
1. Multi-functional screwdriver and various hexagonal screws are cautious; >>>More
Yes, people need the nourishment of love, otherwise it will be meaningless to live for decades.