Please help translate a small piece of English, thank you

Updated on collection 2024-04-02
3 answers
  1. Anonymous users2024-02-07

    texas a & m

    library and business administration building $32m

    college station, texas.

    position: construction managerfrom to may 1995. my responsibilities included the construction of two structures at texasa & muniversity.

    these included pouring in place structures, atriums and all finishes as well as contractor coordinations and supervisions, schedulings, the review of change orders and the control of shop drawings. (spaw – glass inc.)

    Texas A&M University.

    Library and commercial administrative buildings [stand] $32 million.

    Texas A&M University, Texas.

    Position: Construction Manager.

    From December 1992 to May 1995.

    My responsibilities included the construction of two buildings at Texas A&M University. These include the role of the irrigation structure, atrium, and completion, as well as the coordination, supervision, scheduling, review of engineering change orders, and management of construction drawings. ( spaw – glass i****)

  2. Anonymous users2024-02-06

    Texas A&M University.

    Library and Business Administration Building, $32 million.

    College Station, Texas.

    Position: Construction Management.

    From December 1992 to May 1995. My responsibilities included the construction of two structures at Texas A&M University. This includes cast-in-place structures, atriums, and full finishing works, as well as contractor coordination and supervision, scheduling, change order review, and shop drawing control.

    spaw - glass company).

  3. Anonymous users2024-02-05

    Texas A&M University.

    Library and commercial administration building $32 million.

    State of University: Texas.

    Position: Construction Manager.

    From November 1992 to May 1995.

    My assignment included the construction of these two buildings at Texas A&M University.

    This includes location structure, patios, all surface materials, as well as contractor coordination, supervision, scheduling, change order review and shop drawing control.

    I am not an architect, and the translation of professional terminology is inappropriate. Hey.

Related questions
5 answers2024-04-02

In the 19th and 30s, many people in the United States were laid off, and one of them, Alfred Butz, was very fond of games such as lyrics, and he designed a game called "Lexico". However, he wasn't happy with the game, so he made a number of changes and renamed it "Alph" and later "Criss Cross". He wanted to make some money with the new game, but it didn't bring him any real commercial success. >>>More

4 answers2024-04-02

The actual use of chitosan has been mainly limited to.

To the unmodified form is applied in the tissue project. >>>More

7 answers2024-04-02

Teach you how to like you, instead of having a teacher? According to the Department of Education and Skills, students in school will have their own way of teaching, and in the future there will be no more problems, such as finding enough teachers. Estelle Morris, Director for Education, Opening of the Educational Technology Conference in 2002 began at the London Conference, where she presented a video projection computer produced a model school for tomorrow. >>>More

6 answers2024-04-02

Hi, how are you? Looking forward to communicating with you, do you have MSN? Mine is . >>>More

6 answers2024-04-02

A lot of people love to surf the Internet, and now it's the most important thing of the day. The Internet brings the outside world closer to people's lives. A lot of people say that the world is getting smaller and smaller now because of the internet. >>>More