First, first enter the venue to prepare:
1. Project commencement report, construction permit, construction organization design, materials and equipment for review.
2. Concrete mix ratio design and material inspection.
3. On-site acceptance. Temporary facilities (schemes), safe and civilized construction preparations.
4. Engineering survey and positioning records.
Should be all prepared:
Basic information table of construction projects.
Construction approval materials (project approval documents requested from the construction unit).
Construction project planning permit (planning permit requested from the construction unit), notice of winning the bid for the construction project (notice of winning the bid from the construction unit), construction contract (construction contract requested from the construction unit).
Supervision contract (supervision contract requested from the supervision unit).
A copy of the qualification and personnel certificate of the construction unit.
Copies of project supervision institutions and relevant certificates.
A copy of the qualification and personnel certificate of the design unit.
A copy of the qualification and personnel certificate of the survey unit.
Copies of project construction institutions and related certificates (including qualification certificates, personnel employment certificates (project manager, technical leader, constructor, budget officer, quality inspector, safety officer, material officer, surveyor, sampler, data clerk, drainage, heating, electrical engineer).
Drawing triage records and design change documents.
Design documents and design changes before the start of construction.
Construction site quality management inspection records and schedules.
1. A package of quality responsibility system.
2. The main professional types of work operation certificates (tower cranes, scaffolding workers, gantry frames, electric welders, butt welders, straight ribbing, electroslag welders) (ask for each team).
3. The qualification contract of the subcontractor.
4. Construction drawing review (construction drawing review certificate).
5. Geological survey documents.
6. Construction organization design, construction plan and approval.
There are others.,I'm not all out here.,If you need it, you can hit it in the (library) (construction materials first enter the site to prepare) to **a.,All of the above need to be done to enter the site Of course, that is also sent by me = =!
-
Enough has been sent to you, please check!
-
First, the process inspection.
1. First of all, understand the process of each sub-project in the construction project, such as the process of making a C20 concrete floor, the plain soil is tamped, and the backfill is relatively thick, and it is also layered and tamped. Spread 5-10cm thick gravel and water concrete. There are three processes here.
2. Master the technical specifications of each process.
Second, the material inspection batch. Self-inspection, inspection, and certification.
Third, if the construction site is more standardized, requiring each sub-project to do a sub-project, to produce this part of the information, some to the site visa, the site is not visa, it is not good to carry out the construction of the next process, or there will be a situation of passing the buck to each other.
Fourth, in general, Xinhua bookstores have books on the construction industry, and there will be professional architectural bookstores in larger cities.
Information clerk. Data clerk is responsible for the preparation, collection, sorting, file management and other internal management of the technical personnel of the project data, the data clerk needs to pass the post qualification examination organized by the relevant departments of the state, and obtain the corresponding certificate before being able to take up the relevant position.
-
The site data clerk should learn computer introductory knowledge, OFFIC tutorials (word documents and excel electronic **), AutoCAD computer construction engineering drawing, data software operation and application, building structure, building materials, building drawing, building surveying, building structure, construction organization and design and other related knowledge.
The business of the site data clerk covers the collection, collation and filing of all information related to the construction project of the site. It can be said that it is a primary file management content. As well as collecting, archiving and sorting out various materials such as drawings, supporting facilities, budget and final accounts of various development projects.
Arrange the sending and receiving of drawings and materials of construction projects, and collect all kinds of technical books and magazines. Refine workflow documents.
-
First of all, we should understand the composition of the data, what data should be formed in the process of engineering construction, and what data should be collected and sorted out at ordinary times. You can go to the architecture bookstore to buy a book of construction materials** to fill in the example, the content of the book is relatively complete. Secondly, we should learn more about norms and standards, and only by mastering the requirements of norms and standards can we do a better job of information.
In addition, it is necessary to learn construction techniques and understand the connection between each process, so that you can know when to do what information.
-
Hello! First of all, I don't know which province you are from, the requirements of each province are different!
Second: when the data clerk makes the data, he must compare the drawings from a simple project overview to the building, structure, fire protection, energy saving and many other things that need to be reflected in the data I don't understand the drawings How to fill in the data?
Third: the data clerk should be the most complete person on the construction site, but not necessarily as good as the degree of understanding, of course, the more you understand, the better, the most basic is to ensure that you can successfully complete the information, simply put, you have to see what materials are used in each part, how to do it, whether there are special requirements, etc.
Specifically, I hope to search for a data group and add it If you encounter a no, ask more Attention Which province you are from, you will add the group of which province Each province is different.
-
There is a special software for making data and a special data sorting template, and it is enough to report the same as the progress of the project.
First, first enter the venue to prepare:
1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More
Commencement data, foundation division, main body division, roofing division, decoration division, energy-saving division, completion information, (household acceptance). >>>More
One. Subgrade fill.
1.Construction pay-off measurement record. >>>More
The data clerk on the construction site is now generally 3,000-5,000 yuan a month. >>>More
Responsibilities of the data clerk.
1.Conscientiously implement the Archives Law, and strictly collect and sort out all kinds of original materials. >>>More