-
The procedure is a bit complicated, so it is recommended that you go to a professional for detailed consultation.
1.Why buy PV insurance.
In order to effectively control the risk of power station operation, ensure personal safety and equipment reliability, and reduce the risk cost of the enterprise, relevant personal injury and asset management insurance should be purchased from the time the power station is put into operation and handed over to the production management party until the power station is decommissioned.
There are three types of photovoltaic insurance, namely property insurance, liability insurance, and quality assurance insurance.
2.Formalities.
The policyholder consults the insurance company in detail to select the type of insurance and the mode of insurance.
Fill in the insurance information carefully. The insurance information form must be submitted to the relevant authorities 30 days before the expiration of the policy, and if there is any new insurance need, the insurance company should be notified 15 days before the policy is submitted.
Review and communication. After the policy is submitted, the insurance company should check the policy information with the insurance company and communicate the doubts.
Temporary Warranty. When the information is incomplete, it is a means for the insurance company to protect its interests. The validity period of the temporary insurance is usually 30 days, and it is necessary to complete the information before the temporary insurance time, and issue a formal policy or endorsement; Temporary insurance requires the payment of premiums, and the speed of settlement of claims during the temporary insurance period is low.
Temporary insurance is an emergency treatment and the company should try to avoid such behavior.
Keep track of your insurance filings. The company's policyholder should track the insurance declaration in a timely manner, keep abreast of the progress of the insurance, and confirm the effective time of the policy.
Get invoices and vouchers. When applying for insurance, be sure to indicate the premium invoice, and the insurance company should send the payment notice, premium invoice, insurance certificate, etc. to the company.
Premium payment. The premium is generally paid within 60 days from the date of issuance of the official policy, and if there are special requirements, you should communicate with the insurance company to confirm.
Out of danger. The insured power station shall protect the site, do a good job of safety isolation and protection, and count the losses when it finds danger
Notify the insurance company in a timely manner and fill in the "Notice of Loss" and send it to the insurance company by mail or fax, and the insurance company shall send personnel to conduct on-site investigation, put forward rescue suggestions, and assess losses as agreed.
Claims. The power station shall cooperate with the insurance company to provide a list of losses and relevant materials, and the insurance company shall pay compensation according to the damage assessment, and the company shall collect the compensation. If the accident causes a third party**, it must be handled properly and cannot be promised without the written consent of the insurance company.
Changes to your enrollment information. If there is any change in the application information, it must be completed in writing and submitted to the insurance company before the policy becomes effective. Above.
-
In the case of photovoltaic insurance, there are a lot of procedures, there are some certificates for some new energy, and then the place where you install it yourself, etc.
-
When applying for insurance, the main procedure is to fill in the corresponding information, and then it needs to be sent, and then carry out other things that need to be used first.
-
The required procedure is to apply for an insurance policy, then apply for an insurance policy, and there are some supporting materials.
-
Photovoltaic insurance, like other insurance, requires invoices and other procedures required by insurance companies.
-
A PV project contract and proof of identity of the owner are required.
-
If you are going to apply for insurance, generally speaking, you should need your own ID card, and then choose this insurance of Xiangying, basically, other words should not be needed.
-
What are the procedures for insurance? I think that the formal procedures for PV insurance should also be required, such as the application for Lushen insurance and the identity verification.
-
You only need to buy this insurance, and you can use it directly after paying a certain amount of money every month, this is insurance, and you don't need to go through any procedures.
-
What procedures do photovoltaic insurance need, which needs to negotiate with the insurance personnel, because each region is different, so his procedures are not the same, photovoltaic power generation is a more beneficial project to the people, and his brother Liu is conducive to environmental protection, I think it should be a very good project.
-
Now photovoltaic, we still need more than 2,000 yuan for its thermal insurance, and it should still be based on your choice. The price is also different.
-
What procedures do photovoltaic insurance require, no matter what kind of insurance he has, and the procedures required by the insurance company, his procedures should be the same.
-
He needs this insurance, he needs procedures, and sometimes this mobile phone is more.
-
1. The original and copy of the ID card of the person in charge;
2. Original and copy of real estate certificate;
3. For public rooftop photovoltaic projects, it is also necessary to provide the consent of the property, the owners' committee or all the owners in the same building, as well as the use or lease agreement of the building and facilities;
4. For contract energy management projects, it is also necessary to provide the contract energy management cooperation agreement signed by the project owner and the electric energy user;
5. If it is an agent, the project owner is also required to issue a "Power of Attorney for Distributed Power of Generation";
6. Copy of bank card;
7. Electricity household energy meter**, panoramic view of photovoltaic installation**.
Renewable Energy Law of the People's Republic of China
Article 13. The State encourages and supports the integration of renewable energy into the grid for power generation。
The construction of renewable energy grid-connected power generation projects shall obtain an administrative license or submit it for filing in accordance with the provisions of the law and the law。
In the construction of a renewable energy grid-connected power generation project for which an administrative license shall be obtained, and multiple persons apply for the same project permit, the licensee shall be determined through bidding in accordance with law。
-
Legal analysis: 1. You can call 95598 for consultation first, and then go to the nearest power supply business hall to apply. If you are using a public area, you need to provide proof of consent from other owners, property owners, and neighborhood committees.
2. After providing the application, the power supply company will send someone to the site to investigate, issue an acceptance plan, and the public will design according to the plan, purchase the solar panels, inverters, brackets, cables, etc. of qualified units, install them, and then the power supply company will review them. After the audit is passed, the power supply company will send someone to install the metering device, sign the grid-connected contract, and carry out grid-connected commissioning.
3. The power supply enterprise is exempt from the system capacity standby fee, and there is no charge for the whole process from the application for the hail grid to the grid-connected commissioning, and the power generation can be all connected to the Internet, or all for self-use, or the loss of acres is spontaneously self-used, and the surplus electricity is connected to the Internet.
4. The State Grid Corporation of China promises that the whole process will be completed within 45 working days. Judging from some of the household photovoltaic power stations that have been put into operation, power supply companies can generally complete the service process within 45 days.
Legal basis: Article 4 of the Interim Measures for the Management of Photovoltaic Power Station Projects shall be responsible for the supervision and management of the construction and operation of photovoltaic power station projects nationwide. The provincial-level energy department is responsible for the supervision and management of the construction and operation of photovoltaic power station projects in the region under the guidance of the first-class energy department.
Entrust the national centralized management unit of solar power generation technology to undertake the technical management of the construction and operation of the light-deficient and air-free sail volt power station.
-
Summary. Photovoltaic power station insurance is generally classified according to the type of power station, one is household photovoltaic power station insurance, which mainly protects power station property insurance, three liability insurance, power station power generation insurance, theft insurance, etc.
Industrial and commercial power station projects are generally larger, often millions of investment projects, so industrial and commercial photovoltaic power station insurance generally needs to be tailor-made, the premium is relatively high, and the insurance amount is relatively high.
How to buy insurance for photovoltaic power plants.
Photovoltaic power station insurance will generally be classified according to the type of power station, one refers to the travel is the transfer of household photovoltaic power station insurance, mainly to protect the power station property insurance, three liability insurance, power station power generation insurance, theft insurance, etc. Industrial and commercial power station projects are generally larger, often millions of investment projects, so industrial and commercial photovoltaic power station insurance generally needs to be tailor-made, the premium is relatively high, and the insurance amount is relatively high.
For example, if the owner of the power station buys power station insurance, it is generally possible to entrust its own dealers to buy, or there are insurance companies that can have this kind of service, and the other is to look for some flat round bend socks companies that provide power station insurance services to buy, such as wheat photovoltaic, Zhejiang carbon silver photovoltaic, all have insurance value-added services.
Hope it helps. <
-
Legal analysis: Individuals only need to go to the local ** for filing to install photovoltaic power generation.
Legal basis: "People's Republic of China Circular Economy Promotion Law" Article 3 The development of circular economy is a major strategy for the economic and social development of Wangzao country, and should follow the overall planning, reasonable layout, adapting measures to local conditions, focusing on the effectiveness of the difficulty, draft elimination promotion, market guidance, enterprise implementation, and public participation.
Presumably, many people have a lot of doubts in their minds before applying for the grid connection of household photovoltaic power stations, such as how to install the meter, where to apply, what information is needed, whether it meets the regulations, etc. Today, in order to eliminate everyone's doubts, Aohua New Energy takes the 8kw photovoltaic power station installed by Mr. Wang in Suqian City, Jiangsu Province as an example to introduce in detail the detailed materials and precautions that need to be prepared for the grid connection of household photovoltaic power stations, which can not only avoid a lot of unnecessary troubles, but also save a lot of time and costs. >>>More
Photovoltaic power generation is a technology that directly converts light energy into electrical energy by using the photogenerated volt effect at the semiconductor interface. It is mainly composed of three parts: solar panels (components), controllers and inverters, and the main components are composed of electronic components. Solar cells can be encapsulated and protected in series to form large-area solar cell modules, and then combined with power controllers and other components to form photovoltaic power generation devices. >>>More
The integration of the photovoltaic industry will become the focus of development in the future. Enterprises queue up for IPOs and continue to use capital markets to raise funds, and once successful, the funds raised will promote the continuous expansion of production capacity and industry consolidation. >>>More
Solar simulator is a device used to simulate sunlight, in the photovoltaic field, coupled with electronic load, data acquisition and calculation equipment, can be used to test the electrical performance of photovoltaic devices (including solar cells, solar cell modules, etc.), such as pmax, imax, vmax, isc, voc, ff, eff, rs, rsh and i-v curves. >>>More
Operation managementThe operation requirements of the power station are special types of workers。The operation personnel should monitor, operate and adjust the parameters of the power generation equipment throughout the day, and must work consistently and repeatedly to ensure the safe, economical, stable operation of the equipment of the whole plant and the correctness of the safety measures for equipment maintenance. >>>More