The construction organization design is usually prepared by the company's technical management department, which can be the chief (chief) engineer or the technical personnel of related specialties. The construction organization design is usually submitted to the tendering unit in the bidding stage, so it is usually not prepared by the relevant personnel of the project department, because it is still unknown whether the project can win the bid at the time of preparation.
What the data clerk has to do is: collect, archive and sort out various materials such as licenses and contracts in the early stage of each development project. Collect, archive and sort out all kinds of information such as drawings, supporting facilities, budget and final accounts of various development projects. Arrange the sending and receiving of drawings and materials for construction projects.
Collect all kinds of technical books and magazines.
Refine workflow documents.
The data clerk is responsible for the collation and storage of data documents such as: management documents, notices, relevant technical documents, construction technical standards, process standards, construction specifications, atlases, construction drawings, construction organization design, project quality plans, etc. The materials formed during the construction process are as follows:
Construction technology disclosure, project contact form, change visa form, project negotiation records, meeting minutes, process checklist, equipment installation checklist, commissioning records, engineering hidden (pre)inspection records, design changes collation, preservation and archiving. Preparation of data, processing of texts such as project pre-settlements.
-
Generally speaking, the process of decoration and decoration is different from civil engineering, there are many processes, it is not good to detail them one by one, I will tell you a few categories.
Floor: stone floor, paint floor, tile floor, antistatic floor, plastic floor.
Walls: dry-hung stone, latex paint, wallpaper, paste, etc.
Ceiling: mineral wool board, gypsum board, aluminum veneer, aluminum grille, Ette board.
Curtain wall: stone curtain wall, aluminum curtain wall, glass curtain wall.
Wait, there are many specific categories, it is recommended to buy a book of decoration construction technology.
And as you mentioned, the data clerk generally does some material inspection, inspection and approval, sending and receiving documents, etc., and the construction organization design is generally prepared by the chief engineer of the project. Here's how it happened.
-
There are many structural methods of building decoration and decoration projects, mainly as follows:
1) The construction method of fitting installation is to attach the finishing material to the main structure or enclosure structure by connecting mechanical accessories.
2) The construction method of pasting is to use the adhesive material to tightly attach the finishing material to the surface of the main structure or envelope structure.
3) The structure of mixed building decoration can also be a mixed way of integrating fitting installation, pasting, painting, soft packaging, inlay, and other construction methods.
4) Brushing is a construction method that directly brushes, sprays or scrapes the finishing material on the surface of the main structure, envelope structure or other substrates, and many times the painting is a multi-layer operation.
-
Answer]: The construction organization design of the decoration project of the construction project is the construction organization design of the unit project.
-
Advantages of the principles of construction organization design of architectural decoration projects. Hello, pro-construction organization design preparation principle 1 Conscientiously implement the laws, regulations, procedures, guidelines and policies of national engineering construction. 2. Strictly implement the engineering construction procedures, and adhere to reasonable construction procedures, construction sequences and construction techniques.
3. Adopt modern construction management principles, flow construction methods and network planning techniques to organize rhythmic, balanced and continuous construction. 4. Give priority to advanced construction technology and scientifically determine the construction plan; Conscientiously prepare various implementation plans, and strictly control the project quality, project progress, project cost and safe construction. 5. Make full use of construction machinery and equipment, improve the degree of mechanization and automation of construction, improve labor conditions, and increase productivity.
6. Expand the scope of prefabricated assembly and improve the degree of industrialization of buildings; Scientifically arrange the construction in the winter and rainy periods to ensure the balance and continuity of the construction throughout the year. 7. Adhere to the principle of "safety first, prevention first" to ensure safe production and civilized construction; Conscientiously do a good job in the protection of the ecological environment and historical relics, and strictly prevent building vibration, noise, dust and garbage pollution. 8. Make use of permanent and prefabricated construction facilities as much as possible, and strive to reduce the amount of construction facilities; Scientists refer to the planning of the construction plane and the reduction of construction land.
9. Optimize the amount of on-site material storage, reasonably determine the material storage method, and minimize the amount of inventory and material loss.
-
All the decoration teams will have a fixed plan for interior decoration, so what is the content of the interior decoration bucket pin decoration construction organization design plan? The following No. 1 home network I will introduce to you an interior decoration construction organization design plan.
The interior decoration construction organization design scheme is introduced as follows:
1. Organizational preparation.
Set up a lean, efficient and complete project department to implement comprehensive management of the project. The project department is composed of a first-level project manager as the project manager, and our company is composed of excellent construction management talents who have a number of decoration engineering construction experience, strong professionalism and sense of responsibility, excellent technology, proficient business and good health; In terms of staffing, the team will not only fight but also set up posts according to things and assign responsibilities to people, and at the same time, the members of the project department have the ability to specialize in multiple jobs and be competent for multiple positions.
Interior decoration construction organization design plan, decoration engineering construction plan.
2. Preparation of empty belt labor.
The employees of our decoration company with intermediate and senior technical standards and many years of experience in decoration construction are selected to form four mixed construction teams with complete main types of work, which are responsible for the construction of the basement, the first floor, the second floor and the third floor of the project. According to the requirements of the implementation of the construction plan and the requirements of the construction schedule plan and the labor allocation needs plan, the labor force shall be arranged and organized in advance, and the corresponding organizational leadership system and management guarantee system shall be established. According to the requirements of the construction project undertaken by each team and team and its labor technology, quality, construction management and cooperation ability, etc., based on the company's internal construction task contract, sign the specific construction task contract, construction safety agreement and other relevant commitment and guarantee documents of the project, and clarify the work project and scope, work objectives, construction requirements, reward and punishment measures and other matters to meet the requirements of the construction of the project.
Give full play to the advantages of our company in construction organization and management, and make detailed arrangements for the relevant construction teams and teams in advance by the project manager department and its management personnel according to the process, sub-region and cross construction, and then incorporate other professional subcontracting units into the management system of the project manager department to ensure the realization of the construction period and quality objectives. The above is the recommended interior decoration construction organization design plan for everyone, I hope you can learn more about it, so that you can help yourself when you decorate in the future.
Construction organization design is an important means to implement scientific management of construction activities, which has the dual role of strategic deployment and tactical arrangement. It embodies the requirements for the realization of the capital construction plan and design, provides the content of the construction preparation work at each stage, and coordinates the interrelationship between the construction units, construction types and resources in the construction process. >>>More
The basic way of flow construction.
First, wait for the rhythm of the flow of construction. >>>More
Chapter I: Notes on the preparation.
Section 1: Basis for compilation. >>>More
There is a forum for the University of Architecture Hall, so go find it.
The preparation procedure for the general design of the construction organization is as follows:1. Collect and be familiar with the relevant materials and drawings required for the general design of the construction organization, and investigate and study the characteristics and construction conditions of the project; >>>More