Before the wall tiles are waterproof, can the wall tiles be more stable?

Updated on home 2024-05-17
20 answers
  1. Anonymous users2024-02-10

    There is no inevitable relationship between waterproofing and tiling, so there is no need to say that waterproofing tiles will be more stable. If you want the tile to be more stable, you still need to start with the material of the tile.

    Now it is not recommended to use the traditional cement river sand for tiling, because now the quality of the tile is getting better and better, the water absorption rate of the natural tile is reduced, the traditional cement river sand tile is the use of mortar leakage into the pores behind the tile to form a bonding force, now the water absorption rate is reduced, the pores are reduced, and the mortar leaks into the natural less, so the adhesion force can not meet the demand.

    Therefore, it is recommended to use professional knotting materials, such as porcelain stickers to paste tiles, which not only has strong adhesion force, is not easy to fall off the hollow drum, but also has a thin thickness of knots, environmentally friendly and non-toxic, and the aesthetics and firmness of tiles have a good guarantee.

  2. Anonymous users2024-02-09

    Definitely won't affect. You're right to insist on waterproofing and being high (to the top). After waterproofing, as long as the construction is carried out in accordance with the specifications of the ceramic tile manufacturer:

    Use non-pure cement paste to paste tiles (tile glue is better), paste tiles as much as possible before pasting, leave a certain gap between the tiles, etc.

  3. Anonymous users2024-02-08

    It doesn't matter, after the waterproofing is done, the wall surface has been brushed.

  4. Anonymous users2024-02-07

    Not necessarily, it depends on what waterproofing layer and what process you use.

  5. Anonymous users2024-02-06

    The wall is waterproof, and it must be touched with cement mortar before it is stable.

  6. Anonymous users2024-02-05

    It's all about your choice of materials.

  7. Anonymous users2024-02-04

    Summary. Under normal circumstances, you can put bricks in about a week after the waterproofing is done.

    Under normal circumstances, you can put bricks in about a week after the waterproofing is done.

    After the waterproofing process is completed, it takes about a week for the waterproofing material to cure. The specific time needs to be decided according to factors such as the size of the waterproof banquet, the quality of the waterproof material, and so on.

    It is necessary to wait until the waterproofing is fully cured before tiling. Because if the tiles are not fully cured and the tiles are started, then the strength of the cement is not so strong. In this way, the waterproofing layer will be destroyed, and cracks will appear in the slag infiltration of the floor tiles.

    In this way, it is equivalent to the two processes of waterproof layer and tiling are done in vain. Therefore, do not rush to paste the bricks after the waterproofing is done, and be sure to wait for the waterproof layer to completely solidify.

    After the waterproofing layer is fully cured, it is necessary to do another waterproofing test. The specific operation is to fill the waterproof layer of the bathroom with water, and after a day, the water level will be cleverly seen if the water level has dropped. You can also ask the residents downstairs if there is any leakage on the roof of his house.

    Don't be cautious because the developer has said that the bathroom has been waterproofed, so it will save trouble, and the bridge will not be waterproof again. Because the waterproofing made by the developer is not so in place, in addition, even if the waterproof is done reliably, it is possible to damage the waterproof layer when the tung work is applied. Therefore, when decorating, you must do a good job of waterproofing.

    If mine is helpful to you, please give it a thumbs up<>

    I wish you a happy life and good health<>

    Waterproof is done for a month and then stick the bricks.

    Yes.

  8. Anonymous users2024-02-03

    After the waterproofing is done, you can not directly paste the bricks, you should wait for 24 hours to test the water, the water test time is at least 24 hours, and the water test height is best to put the water flush with the door side.

    On the surface of the waterproof layer of the wall, a layer of net cement is smeared, and the ground can be filled with light bricks or cinders, vermiculite and other things, and then the cement can be wiped and leveled, and the cement can be dried before it can be tiled.

    The general waterproof construction should be done 2 to 3 times, and the order of waterproofing is also particular, for example, the wall should be waterproofed first and then the wall tiles should be pasted, and then the ground waterproofing should be done and then the floor tiles should be pasted. Because the ground is often stepped on, the ground waterproof will be easy to step on if you do it first.

  9. Anonymous users2024-02-02

    After the waterproof copy is done, it can not be directly hit and tiled.

    1.To wait for 24 hours to test the water bai, the water test time is at least 24 hours, and the water test height is best to put the water zhi flush with the door as well

    2.On the surface of the waterproof layer of the wall, another layer of net cement is smeared, and the ground can be filled with light bricks or cinders, vermiculite and other things to wipe the cement leveling.

    Wait until the cement is dry before you can start tiling.

  10. Anonymous users2024-02-01

    Not necessarily.

    If the waterproof layer is not exposed to the outdoors, no human trampling, etc., it can be completely free to do a protective layer on the waterproof layer for a long time (pasting tiles is a way to make a protective layer).

  11. Anonymous users2024-01-31

    Membrane, permeable waterproofing can be done after one day, but you should still test the water for two days, observe whether there is water leakage, and should not be blindly constructed!

  12. Anonymous users2024-01-30

    It depends on what waterproofing material you make.

  13. Anonymous users2024-01-29

    Can not be directly tiled, normally you need to wait for the waterproof to dry and then turn off the water to detect whether the water will leak, this period takes about a week or two, and the direct paste is likely to destroy the waterproof coated, it can not play a fundamental role.

  14. Anonymous users2024-01-28

    No, after the waterproof brush is done, you have to wait for it to dry, and then test the water, and then paste the tiles if there is no leakage.

  15. Anonymous users2024-01-27

    I personally recommend that you don't do this, my home is also newly renovated, I feel that if you directly paste tiles, it will reduce the life of the tiles, so I would rather do it at one time.

  16. Anonymous users2024-01-26

    The walls are made waterproof, and the tiles are not easy to stick. You can replace the cement with tile adhesive, and it will be easier to stick to it.

    Tile adhesive is mainly used for pasting ceramic tiles, face tiles, floor tiles and other decorative materials, and is widely used in interior and exterior walls, floors, bathrooms, kitchens and other building decoration places. Its main characteristics are high bonding strength, water resistance, freeze-thaw resistance, good aging resistance and convenient construction, which is a very ideal bonding material.

    The use of tile adhesive can save more space than the use of cement, and only a thin layer of tile adhesive is sufficient. If the construction process is up to standard, the tile sticks very firmly, and can also reduce waste, no toxic additives, and meet environmental requirements.

  17. Anonymous users2024-01-25

    It won't be sticky enough, but it will be troublesome during construction! Because the back of the tile is smeared with cement mortar, the water will seep into the wall and become dry and solidified, but with the waterproof layer, the wall is smooth and the water cannot seep in, and it is not easy to fix the wall tiles when they are pasted.

    1. Brush the waterproof in strict accordance with the recommended ratio of the product, and make a little hair on the surface when brushing. Or wait until the waterproof is dry, and then use cement to draw the wall and then put tiles.

    2. When pasting bricks, the cement mortar layer should not be too thick, and the joints between the bricks should be paved to prevent thermal expansion and cold contraction between the tiles.

    3. Or use special tile adhesive instead of cement mortar to pave, which is several times more viscous than ordinary cement mortar.

    4. It is recommended not to put floor tiles on the wall, and do not choose oversized bricks, which are more difficult to pave because of heavy bricks.

    5. The wall tiles should be soaked in water before pasting.

  18. Anonymous users2024-01-24

    Will the wall be waterproofed and tiled will fall?

    1. If the wall is waterproof and then tiled, it is likely that the bricklaying will not be firmly pasted, and it will fall down after a long time.

    3. The wall is waterproof, and it needs to be covered with a layer of cement protective layer, so that the surface will be smooth and the tiles will not fall.

  19. Anonymous users2024-01-23

    Summary. Hello, happy with your question.

    About, after making a waterproof layer on the wall, can you paste tiles?

    Yes, in general, there should be a curing period of five to seven days after the waterproof layer is done, so the tiles should be done after five to seven days, during which the waterproof layer should be protected, especially when the tiles are pasted, it is necessary to pay attention to the protection of the waterproof layer.

    Can tiles be applied after making a waterproof layer on the wall?

    Hello, happy with your question.

    About, after making a waterproof layer on the wall, can you paste tiles?

    Yes, in general, there should be a curing period of five to seven days after the waterproof layer is done, so the tiles should be done after five to seven days, during which the waterproof layer should be protected, especially when the tiles are pasted, it is necessary to pay attention to the protection of the waterproof layer.

  20. Anonymous users2024-01-22

    Summary. Hello, pro The waterproof layer can be tiled after a month, and the following points need to be noted: First of all, you need to confirm whether the waterproof layer has been completely dry.

    If the waterproofing layer does not dry thoroughly, you need to wait a little longer until it is completely dry. Before starting to apply tiles, you should check whether there are obvious cracks or damages on the surface of the waterproof layer, and if so, you need to repair it in time to ensure that the waterproof effect is not affected. Choose a tile that is suitable for the waterproofing layer.

    Sticking tiles on the waterproof layer requires choosing a professional waterproof brick adhesive with good adhesion, and choosing the right type of tile according to the actual situation, which will affect the final construction effect and waterproof effect. Attention should be paid to the use of the right tools and techniques during the construction process to ensure that the bond between the tile and the waterproof layer is firm and reliable, and to ensure the flatness and aesthetics of the tile.

    The home did waterproofing today, and will tiling tiles affect the waterproofing effect one month after raising water.

    Hello, pro The waterproof layer can be tiled after a month, and the following points need to be noted: First of all, you need to confirm whether the waterproof layer has been completely dry. If the waterproofing layer does not dry thoroughly, you need to wait a little longer until it is completely dry.

    Before starting to apply tiles, you should check whether there are obvious cracks or damages on the surface of the waterproof layer, and if so, you need to repair it in time to ensure that the waterproof effect is not affected. Choose a virtual sail and choose a tile that is suitable for the waterproofing layer. Sticking tiles on the waterproof layer requires choosing a professional waterproof brick adhesive with good adhesion, and choosing the right type of tile according to the actual situation, which will affect the final construction effect and waterproof effect.

    In the construction process, it is necessary to pay attention to the correct tools and techniques to ensure that the bond between the tile and the waterproof layer is firm and reliable, and to ensure the flatness and aesthetics of the tile.

    As long as the waterproof layer is not damaged, it will not affect the waterproofing for a long time, right?

    Yes, dear. Before starting to paste the brick vibrasive bridge, check whether there are obvious cracks or damages on the surface of the waterproof layer, and if there is, you need to repair the Ludong pants in time to ensure that the waterproof effect is not affected.

Related questions
12 answers2024-05-17

The building materials market sells a kind of glue that specializes in sticking bricks, about 30 yuan a bucket, which can be easily pasted, and is not afraid of water. Although 933 is a building glue that is dry and waterproof, it is relatively not as firm as the glue.

9 answers2024-05-17

Yes, you can. Brick paving seems to have low technical content, but in fact, there are a lot of exquisiteness, which can better reflect the craftsmanship of the workers. If you ignore the treatment work before paving or the operation is not standardized, it is very likely to cause the phenomenon of tile hollowing, large color difference, etc., which greatly affects the overall aesthetics. >>>More

14 answers2024-05-17

Personally, I think the horizontal stickers look better.

9 answers2024-05-17

1. The gap is too small, which is caused by thermal expansion and cold contraction; >>>More

23 answers2024-05-17

The general practice of the decoration company or the construction party is to lay the wall tiles first, then pave the floor tiles, and pave the floor tiles after the wall tiles are paved, which will not affect the wall tiles and do not delay the construction period, so the general construction party will adopt this approach. If the floor tiles are paved first, and then the wall tiles are paved, you must wait for the tiles to dry and solidify and then pave the wall tiles, if the floor tiles are not completely dry, you will directly pave the wall tiles, step on the floor tiles, which will artificially cause the hollowing, loosening and height inequality of the tiles!