First, the layout of hydropower.
1. Horizontal and vertical.
It is neat and beautiful, and it is convenient for future maintenance and inspection. But there are also those who say that this is a waste of not only a lot of materials, but also a lot of gas and water, and a lot of water. And there are a lot of corners in this one, and there will be some resistance when you cross it in the future.
2. Point-to-point.
Two points and one line, although not very beautiful, but can also save a lot of money, less corners, can reduce the dead corners, after all, this is a secret project, no matter how beautiful, as long as there is a groove, there will be no problems.
Later on, we also have to drive nails into the walls and floors, so it's easy to puncture wires and water pipes and cause them to leak, so we can't mess things up just because we started with it.
Second, the advantages of horizontal and vertical.
1. It is convenient for the installation of the keel.
Home decoration, water and electricity, decoration, construction are all related, if not sideways, but to cut the floor heating board into different small pieces, so that it is not conducive to thermal insulation, if you want to install solid wood or bamboo flooring, you need to lay the keel, so that it is convenient to install.
2. It is easier to install in the later stage.
"Horizontal and vertical" is the guarantee of the interior designer and decoration company to serve you, the master who installs the smoke machine, air conditioner, wall cabinet and other equipment will make holes in the wall according to the direction of the pipe to minimize the damage to the wires.
3. Later protection pipeline.
4. Pipe connectors.
At present, the water pipe and water pipe connection on the market are all right angle 90 degrees, if the horizontal and vertical degree of the water conservancy system are not done well, in this way, the canal can not be connected, and there will be some deformation, which has a great impact on the environment.
-
Enter the area and get the decoration for free**].
In home decoration, the hydropower project family shouts as a concealed project, which naturally becomes the construction link that the owner of the industry attaches more importance to. However, due to the fact that many owners are not engaged in the decoration industry, they do not know much about this knowledge, so there is a lot of confusion, and then we will take a look at the detailed explanation of the water and electricity installation knowledge in home decoration!
1.Waterway.
When installing the waterway, it is best to pre-play the line according to the hydropower transformation drawings issued by the designer, and then carry out the slotting construction. When arranging water pipes, the pipes should be 60 to 90 centimeters vertically from the ground, and the groove depth should not exceed 4 centimeters. In addition, during installation, the size and position of each slot should be recorded, so as to facilitate the later bathroom installation and inform the wiring location in time.
When wiring, the pipes should be horizontal and vertical, and reinforcement measures should be taken, such as using pipe clamps to fix them, so that the pipes are not exposed outside the groove. In addition, for pipes that need to be turned, the angle should be kept at 90 degrees, and casing should be used for bending.
2.Circuit.
Circuit slotting is actually similar to waterway, but it should be noted that before the elastic line slotting, the construction master must confirm the electricity demand of the space with the owner before construction. The installation position of the socket cassette is generally 40 cm from the ground, of which the position of the cassette of the air conditioning socket should be about 2 meters from the ground, and if the switch cassette is usually 12 to 140 cm from the ground.
At the same time, when the circuit is installed, the strong and weak current must be in charge of wiring, if the two are worn together, it is easy to have signal interference problems. Concurrent and strong and weak electrical pipes should be spaced at about 30 cm, and if there is an intersection, they can be wrapped in tin foil. In addition, for some special wires, such as closed lines, broadband lines, etc., these special wires need to be laid separately.
Finally, on the wiring, the sub-circuit arrangement should be carried out according to the different use needs of the space, so that it is more convenient to overhaul in the future.
Hope the above, helpful.
Do the math how much it will cost you to renovate your home
-
Decorating the home water and electricity installation design is a skill, people do not know much about the decoration design of the house, so it is best to understand it when decorating, and it is best to see what are the key points when decorating water and electricity, thenHome improvement water and electricity designWhat are the methods? What are the key points of home improvement water and electricity design? Let's give you a specific introduction.
1. Design methods for home improvement hydropower.
1. The detail that cannot be ignored in the design of home water and electricity decoration is comprehensiveness. The so-called thoughtfulness refers to the design of circuits and sockets for the location of electrical equipment necessary for modern home life. Avoid the lack of sockets caused by the lack of thorough considerations, which will affect the overall effectiveness of the home.
2. Practicability. The so-called practicality refers to the practicality in the design, not simply according to the principle of wiring or the way of habitual wiring. It must be designed with the needs of the owner, which means communicating with the owner to ensure that the needs of the owner can be met.
3. Necessity, although it is said that the more comprehensive the design of the water circuit, the better, but there is a certain premise, that is, the premise of necessity. For the design of water circuits that are not necessary, it is better to reduce them, not that the more complex the hydropower decoration is the better choice.
Second, the key points of home improvement hydropower design.
1. The base core weak current should be shielded cable, and the secondary decoration line layout needs to be re-slotted and wiring, most of the strong and weak current can only be piped from the ground, and the strong and weak current pipes are crossed, and the situation of close parallelism is very common. If the weak current uses unshielded cables, it may cause signal interference. The design principle of circuit routing grasps the principle of "the shortest distance between the two ends", does not deliberately wind, and maintains a relative degree of "live wire".
2. In principle, if the strong electric pipe provided by the developer is a PVC pipe, it is advisable to use PVC pipe during the secondary hydropower transformation, and it is not advisable to use JDG pipe (sleeve tight fixed galvanized steel conduit), otherwise it is difficult to realize the overall grounding connection, thus leaving trouble.
3. If the strong electric tube provided by the original developer is a JDG pipe itself, both kinds of pipes can be used. Hydropower design needs to grasp the water circuit transformation design scheme and the actual hydropower system to match the problem, such as the new residential building if the use of instantaneous electric water heaters, air conditioners and other particularly powerful electrical appliances, need to consider a new route from the distribution box for use.
4. The design principle of circuit wiring grasps the principle of "short-distance wiring between the two ends", does not deliberately wind, and maintains a relative degree of "live wire" In principle, if the strong electric pipe provided by the developer is a PVC pipe, the PVC pipe should be used during the secondary hydropower transformation, and the JDG pipe should not be used (socketed and tightly set galvanized steel conduit), otherwise it is difficult to achieve the overall grounding connection, thus leaving the trouble.
There are many ways to decorate the house, and different methods have different skills, so what are the methods and points of home decoration water and electricity design, we have also understood it after reading the above introduction.
Hydropower installation refers to the decoration process of replacing all or part of the waterways and circuits used by the original developer according to the decoration configuration, family population, living habits, and aesthetic concepts. Hydropower transformation is divided into waterway transformation and circuit transformation. Hydropower projects are hidden projects, so they must not be sloppy! >>>More
The position of the switch is generally easy to operate, the switch height has industry standards, and the wiring is also specified, you can check it.
1. Technical regulations and technical regulations for waterway construction: >>>More
1. The material process must meet the requirements of the company's specifications: all wires are made of famous brands such as pigeon brand BV wires, lighting circuit sockets air conditioners 4mm2, kitchens, bathrooms 4mm2, and grounding wires, especially emphasizing that DAEX general light (16) pipes or DAEX (16) B pipes, round tees, direct, locks, and yellow wax pipes should be used in the threading, and bellows, elbows, and equal diameter tees are never allowed. 1 16 pipes can only be used for one circuit, 20 can only be used for 6mm21 circuits and the circuit between the toilet bomb and the switch. >>>More
How to calculate hydropower installation** Hydropower installation knowledge.