1. Demolition and reconstruction of the main body: including wall demolition, wall building, heating removal, and replacement of doors and windows.
2. Renovation of waterway circuits.
3. Paste wallpaper.
4. Install the socket panel.
5. Install cabinets: Before installing cabinets, you should buy range hoods, stoves and sinks in advance. It is best to send it the same day, and install it on the same day as the cabinet.
6. Install finished doors: including hinges, door locks and door frames.
7. Install hardware: You need to install the bits and pieces such as drying racks, curtain rods, and sanitary ware one by one.
8. Install the floor.
Precautions for renovation.
First of all, when selecting and formulating the decoration plan, it should be considered as comprehensive and detailed as possible, and the plan should not be changed too much in the decoration construction process as much as possible, so as not to cause waste of materials and labor.
Secondly, the decoration progress should be coordinated with the relocation plan. For example, the application for installation of gas meters should be completed before kitchen decoration; The model and power of the air conditioner should be determined before the construction of the air conditioning hole on the wall. The installation of gas water heaters in the toilet room and range hood in the kitchen room should be connected in a timely manner.
**Relocation and CCTV relocation should be completed prior to the move.
Third, before the decoration and decoration, we should pay attention to the provisions of the competent department: before the construction of home decoration, the property management department shall not collect the decoration deposit, and at the same time, before the decoration construction, it is necessary to undertake the safety disclosure of the units and personnel who undertake the decoration of the family room, and the necessary safety protection and fire protection measures should be taken to ensure the safety of the decoration workers and adjacent residents.
Finally, after the decoration of the family room is completed, do not rush to move to a new house. Because many decoration materials have volatile toxic odors, all windows should be opened frequently (every day when conditions permit) to ventilate toxic gases. Ventilation and ventilation should be at least one month before relocation.
It is advisable to move in after three months of completion.
-
The order of decoration is room measurement, floor plan, masonry entry, water and electricity admission, and carpentry.
1. Measuring the room
Measuring the room is the first step, and only when you know the size of each part can you follow up on the relevant matters. In the process of measuring the room, it is necessary to control every detail of Fengshi, whether it is the column, groove, protrusion, or inclination, it is necessary to measure accurately to prevent large errors during construction.
2. Plane planning
According to the size of the room, the plane layout of the whole house is carried out. When layout, ensure that each functional section is reasonable and effective, and make corresponding layout plans according to the needs of the owner, whether it is a room, a hall, a kitchen, or a bathroom, you need to think carefully.
3. Masons enter
The wall that does not conform to the plan is demolished and transformed, and the construction needs to be carried out in accordance with the details of the planning drawing during the renovation process to ensure that the effect of the wall transformation is consistent with the design.
4. Hydropower admission
The plumber began to lay the hydropower pipeline according to the design drawing, and when laying the hydropower pipeline, it was necessary to lay the groove reserved by the back ridge according to the mason, and the silver line pipe needed to be protected by a protective pipe sleeve.
5. Carpentry
After the laying of the water and electricity pipelines is completed, the carpenter needs to make and install the ceiling, wardrobe, hanging cabinet, display cabinet and other places that need furniture according to the design drawings.
-
The order of decoration is: rock barrier plane planning, masonry entry, water and electricity entry, carpentry entry, and painter entry.
1. Plane planning.
According to the size of the measurement room for the entire house layout, the layout to ensure that the various functional plates are reasonable and effective, according to the needs of the owner to make the corresponding layout plan, whether it is the room, hall, kitchen, bathroom, need to think carefully, make a plan and then decorate will get twice the result with half the effort.
2. Masons enter.
The wall that does not conform to the plan is demolished and renovated, and the construction needs to be carried out in accordance with the details of the planning drawing during the renovation process to ensure that the effect of the wall celery transformation is consistent with the design.
3. Hydropower admission.
The plumber starts to lay the hydropower pipeline according to the design drawing, and when laying the hydropower pipeline, it needs to be laid according to the groove reserved by the mason, and the line pipe needs to be protected by a protective pipe sleeve.
4. Carpentry entry.
After the completion of the water and electricity pipelines, the carpenter needs to make and install the ceiling, wardrobe, wall cabinet, display cabinet and other places that need furniture according to the design drawings.
5. Painters enter.
The cabinet that needs to be painted is painted as a whole or partially painted according to the requirements marked in the design drawing, and protective measures are also needed when painting, and the paint should not be stained on the wall.
-
When buying a house, we go through the house type, choose the house, and finally after getting the key, you can start the decoration, but before the decoration, we must first understand the order of house decoration, so as to improve the decoration speed and move into the new house early. So let's first understandThe order in which the renovation should be madeand kitchen decoration precautions, let's take a look at it with Xiaoxiaoxian.
First, the order of decoration talkers.
1. Before we decorate, we should first understand the structure and indoor area of the house, and do a good job in the early planning and design, so as to avoid unnecessary troubles in the subsequent decoration.
2. Before decoration, you must fully measure the size of the house, whether it is the size of the tiles, the size of the wall painting, or the size of the furniture, so that there will be no mismatch between the furniture and the room.
3. After understanding the house, it is necessary to demolish and modify the house, and demolition and modification is a very professional thing, some important places can not be easily demolished, otherwise it will lead to unstable houses and easy to be dangerous, so before starting to demolish and modify, it is necessary to plan and measure first to ensure the beauty and safety of the house.
4. In fact, there are certain dangers in the transformation of hydropower, so we must fully comply with the relevant laws and regulations and transformation standards when operating, so that accidents and dangers will not occur.
5. In home decoration, carpentry, masonry and painting are the dirtiest and messiest work, and they are also the most meticulous work.
6. If the above are done, then you can paste tiles and paint the wall, but you must be careful and patient when tiling and painting the wall, so as not to be in a hurry, so as not to affect the overall home decoration effect.
2. Precautions for kitchen decoration.
1. It is best to use waterproof lamps and lanterns such as anti-fog lamps for kitchen lamps, and the joints of the line should be strictly treated with waterproof insulating tape to avoid water vapor entering, causing short circuit and fire. Kitchen lighting needs to be divided into two levels: one for the whole kitchen, and the other for washing, preparation, and operation.
2. The top surface and wall surface of the kitchen are more suitable for fireproof, heat-resistant, and easy-to-clean materials, such as glazed tile walls, aluminum ceilings, etc. The ceiling of the kitchen should consider using waterproof products, namely waterproof gypsum board, water-resistant putty and high-performance waterproof latex paint, so as to be beautiful at the same time, but not to cause inconvenience in use.
-
1. The first thing you need to do before decoration is to clarify the tiling area of the house, the wallpaper area, the floor area and the tiling area, and at the same time measure the wall size of the furniture placed in the decoration design.
2. Demolition and transformation of the main body, the main body demolition mainly includes the demolition of the wall, the construction of the wall, the shovel of the wall skin, the removal of heating and the replacement of plastic steel windows and other projects, the garbage generated after the demolition, must be cleaned out of the room in time, to ensure the cleanliness of the room, for the future construction ready.
3. Before the transformation of the waterway and circuit, the cabinet designer is required to measure and negotiate the quantity to ensure the exact location of the lamps, basins, bathtubs, washing machines and switches, so as to formulate the hydropower transformation plan and design the location of the power supply and interface.
4. Paste wallpaper, after the putty and wall paint are brushed, the paint destroyer will brush the nitro paint in the place where the wallpaper needs to be pasted, and wait for the nitro paint on the wall to completely dry, you can choose your favorite wallpaper for paving.
5. Install the socket panel, but pay attention to it during the installation process, as far as possible, choose the socket with the switch function, the electrical appliances can be directly controlled by the switch, and the power supply is not repeatedly plugged and unplugged, which is more convenient.
6. Install cabinets, when installing cabinets, you can buy range hoods, sinks and stoves in advance, and install them together with cabinets.
7. Install the finished door, the finished door is installed earlier than the floor, because the installation of the finished door not only has a lot of cumbersome steps, but also requires a lot of tools, if the finished door is installed after the floor is installed, it is easy to cause the floor to bump.
8. Installation of hardware accessories, such as drying racks, curtain rods, lamps, sanitary ware and sanitary ware, and other fragmented items should be completed before installing the floor.
9. Install the floor, when installing the floor, try not to let workers cut the floor tiles indoors.
10. Later decoration is the last step, when the framework of the whole house is clear, add some later accessories according to the decoration style and space design, such as curtains and decorations.
-
The decoration process is in the early stage of design and main body demolition, water and electricity transformation, carpentry bricklayer and oilman entry, brick paving, kitchen and bathroom ceiling, wooden door installation, household appliance installation, and furniture entry.
1. The early design of hail town and the main body are demolished and reconstructed
Clearly measure the area involved in the renovation and the size of the wall. As the first step of decoration construction, the main body demolition and alteration includes shoveling wall skin, replacing windows, demolishing walls, building walls, etc.
2. Hydropower transformation
As a hidden project in the decoration process, hydropower renovation is very important to pay attention to, and every detail of hydropower renovation needs to be controlled.
3. Carpenter, bricklayer and oilman entered
Carpenters, bricklayers, and oilers are the three brothers in the construction, and the correct order is who gets dirty and who goes first.
4. Laying bricks
The technique of laying bricks is crucial and should be done by an experienced master to avoid subsequent troubles. Painting wall paint refers to the completion of wall base treatment, painting top paint and other work.
5. Kitchen and bathroom pin cong ceiling
Kitchen and bathroom ceilings and cabinet ceilings are closely related to the aesthetics of the house decoration, so the brand selection for it should be refined. The installation of the cabinet can be completed in a normal day.
6. Wooden door installation
When installing the wooden door, it is necessary to prepare the door lock, ground suction, hinge and other related hardware accessories. Under normal circumstances, the flooring can be installed within a day.
7. Household appliance installation
Lamps, hardware and sanitary ware, curtains and other items are installed.
8. Furniture enters
The size of the furniture should be determined according to the house, otherwise there will be a lot of trouble. After the household appliances enter the site, the source bucket is thick, and the decoration of the house is completed.
The original solution is a high-purity liquid directly extracted from pure natural plants, which is the mother of all concentrated essences, and has the reputation of "plant **". >>>More
Do you have to buy a house before you can buy a car? After listening to the analysis of the passers-by, I regretted that I didn't buy a car earlier. >>>More
Functions in a class can be defined in no particular order. This is a feature of functions, so he doesn't use any order to compose them.
I'll just say it, and I'll talk about all the runes, talents, and so on at once, and it feels too hard. >>>More
The order of use of the Proya Skincare Set is as follows:
1.Start by cleansing your face with the matching cleanser. >>>More