Precautions for the installation of floor drain tiles in the bathroom:
1. After the floor drain is installed, it will be used for a long time, and it is more troublesome, so it is recommended to choose a big brand, there are more alloy materials on the market, and it is best to choose copper, which is more durable.
2. Choose a movable cover and a filter screen for the floor drain, so that you can clean up the debris at any time, especially the hair, and effectively prevent blockage.
3. When the floor drain is installed, the ground must have a slope of 3-5 degrees, and the position of the floor drain should be the lowest to ensure that the water can flow smoothly to the floor drain.
4. The tile at the position of the floor drain will be cut to the center of the four corners according to the square and then paved, and the floor drain is in the center position, so that the floor drain will be significantly lower than the ground, which can ensure the smooth flow.
Hope the above is helpful to you.
-
1. Raw room decoration, in addition to waterproofing must be done, when sticking to the ground tiles, we must pay attention to reserving a certain slope, the slope is too large to affect the installation of sanitary ware such as toilets, the slope is too small and can not play a role, this just right slope depends on the experienced bricklayer master to grasp; If the slope is reversed, the consequences will be serious, and the water will flow backwards.
2. In addition to the slope to ensure that the water flows to the floor drain, the paving treatment of the tile treatment at the floor drain is also very important (especially when the bathroom chooses a larger floor tile and the floor drain is not in line with the brick joint); For this point, the general master is like this: cut the tile into four parts, so that the four sides of the tile next to the floor drain are the lowest, so as to achieve the purpose of not storing water.
-
1. Before installation, the drain pipe should be bandaged and protected. When installing, first remove the bandaging protection, and then check whether there is grit and mud inside the pipe and whether it is blocked. If the nozzle is stained, you need to clean it with a dry cloth first.
If the drain pipe is too close to the ground, the drain pipe should be cut short appropriately so that the floor drain installation panel is slightly lower than the ground.
2. The installation of floor drain is generally carried out at the same time as the floor brick laying. After the ground is waterproofed, you can lay bricks and install floor drains. The general floor drain installation is relatively simple, before installation, select the corresponding size of the floor drain, smear the floor drain with cement, align the drain, and then cover the floor drain panel.
3. When installing the floor drain in the kitchen and bathroom, special attention needs to be paid to the slope of the flowing water. The general treatment method is to place the floor drain on the installation pipe and then take measurements to determine the tile cut size. Then cut the tiles, then fix the floor drain, and pave the cut tiles around the floor drain to form a sewer slope.
4. After the floor drain is installed and fixed, it is necessary to pay attention to the gaps on the four sides of the floor drain to be sealed with glass glue or other adhesives to ensure that the odor of the sewer pipe cannot be emitted through the gaps.
5. When the floor drain is installed and accepted, the floor drain sealing core needs to be easily taken out and installed, pay attention to the cement mortar not to wrap the floor drain sealing core or hold the sealing gasket against it, which will cause the sealing core to be unable to be taken out or the sealing gasket to be unable to open. The floor tiles laid in the kitchen and bathroom need to be inclined to the floor drain along the horizontal plane, and the floor drain installation acceptance is also related to the acceptance of the floor tile laying. In addition to the good drainage performance of the floor drain itself, the entire kitchen and bathroom floor tile area is required to be flat, and the flowing water must flow smoothly to the floor drain and drain away, and no water can accumulate.
-
The vast majority of people will choose "dry and wet separation" when decorating the bathroom, the drainage in the wet area is large and concentrated, so only one floor drain is often installed in the wet area, but if the dry area is not installed with a floor drain, it will make the dry area can not dry quickly after draining, the bathroom becomes damp, it is inconvenient to clean in the later stage, and there will be problems such as bacteria breeding on the ground for a long time, which is not conducive to physical and mental health, so the bathroom must be separated from the dry and wet separation to install the floor drain separately to reduce the situation of water accumulation.
There is a lot of water in the wet area of the bathroom, and there is relatively little water in the dry area. Therefore, there are three main problems to consider for floor drains in dry areas, one is to have good anti-odor performance, and the other is to have a good anti-blocking effect to avoid falling hair, dirt, etc. into the pipeline, resulting in blockage of the pipeline; Third, when the wet area pipe bursts, or even other reasons cause too much water can not be discharged in time, if there is no dry area floor drain, it will flood the home, soak the floor furniture, etc., the gains outweigh the losses.
In response to the above problems, the Jindel floor drain Zhenxin series has a unique patented siphon technology, with a displacement of 42L per minute; The unique water film sealing technology is designed, and its soft glue sink structure can store a small amount of water after drainage, seal all the small gaps, and completely isolate odors, viruses and germs. At the same time, it has a starry sky screen, hexagonal and circular, with a diameter of less than 6mm, and the baffle is combined with the same effect, double filtration, which can intercept hair, dirt, etc. Kindle's combination of advantages and perfect compatibility makes it a good choice.
Therefore, the correct installation method of bathroom floor drain, it is recommended to install two, one in the wet area, and do not ignore the floor drain in the dry area.
-
The correct installation steps for the bathroom floor drain are as follows:
First of all, determine the position of the floor drain on the ground, and use the ink fountain line or horizontal pipe to determine the position and height of the floor drain.
Take out the floor drain grate and clean up the debris on it. If the grate is plastic, then use a rag dipped in detergent and wipe it clean.
Insert the floor drain plug into the floor, taking care to keep it perpendicular to the floor.
Cover the finger trouser bridge of the floor drain and be sure to tighten it to avoid water leakage.
Fill the bathroom with water and observe if there is standing water on the floor. If there is standing water, then there is a problem with the floor drain installation and it needs to be reinstalled.
Conduct a water test to ensure that the ground is pure and leaky and can be used normally.
-
I believe that everyone is familiar with the floor drain, although it looks inconspicuous, but it brings great convenience to our daily life, but no matter how good the quality of the floor drain is used, there will be problems after a long time, and it needs to be replaced, so how to install the bathroom floor drain? What are the precautions for floor drain installation? If you want to know, read on!
1. How to install the floor drain in the bathroom.
First of all, clean the perimeter of the floor drain and plug the drain nozzle to avoid the residue falling into the drain pipe and causing blockage; Then apply the cement putty around the floor drain to make the floor drain and the ground more firm, and then clean up the excess cement putty; Take out the deodorant core, align the floor drain panel with the tile and install it, coat it with cement or glass glue around it, and then install the anti-odor core after drying.
Second, the floor drain installation precautions.
1. Before installing the floor drain, the deodorant core of the floor drain must be taken out only in the same way, so as to avoid debris falling into the deodorant core and damaging the deodorant core. The main function of the floor drain is drainage, so the installation position of the floor drain should not be higher than the ground, if the distance between the drain pipe and the ground is too close, the drain pipe should be cut short.
2. When installing the floor drain, the maintenance work after the floor drain day should be taken into account, so the cement mortar can not be directly filled, and the kraft paper should be rolled into a cylinder with the same size as the drainage nozzle before filling, and the drainage pipe should be docked, which needs to be higher than the ground, and then the filling of cement slurry and sand should be carried out.
3.It is best to install a special floor drain for washing machines in washing machines, so that the drainage effect will be better, of course, it is okay to use ordinary stoves without floor drains, and directly insert the drainage pipe into the floor drain during installation, and fix it.
Summary: The relevant content on how to install the floor drain in the bathroom is introduced to you here, see here, I believe you have a better understanding of the installation method of the floor drain. However, we are not professionals after all, in order to avoid unnecessary trouble in the future, it is recommended that you ask professionals to install floor drains, so that it is less likely to have problems when used!
-
1. Clear the original floor drain and clean up the surroundings.
2. Soak the inner wall of the ground sewer pipe with clean water.
3. Completely soak the floor drain seal with clean water.
4. Align the center of the floor drain with the center of the sewer pipe, and put the floor drain into the sewer pipe and press it tightly.
5. Ensure that the level of floor drain is slightly lower than the ground.
6. Put on the floor drain cover and clean the ground.
7. Use sealant to seal the part of the floor drain that is in contact with the upper part of the sewer pipe.
8. The installation is complete.
-
The installation of floor drain in the bathroom is very critical, the installation of floor drain must be paid attention to, it is very particular, if the floor drain is not installed, there will be a lot of problems after that, then, the following is to introduce what are the installation steps of the bathroom floor drain.
1. What are the installation steps of the bathroom floor drain?
Bathroom floor drain installation: 1. Determine its accurate location before installation; 2. According to the position of the floor drain, start to draw lines, judge the specific size to be cut, and cut the surrounding floor tiles; 4. Continue to cut the four floor tiles next to the floor drain, and it is very important to measure the marking; 5. Take out the floor drain again, fix the surrounding with cement, and then tightly combine it with the sewer pipe; 6. Fix the position of the floor drain and pave the cut floor tiles; 7. Screw the deodorant inner core of the floor drain into it and it is completed.
Second, what should be paid attention to in the installation of floor drain in the bathroom.
1. Before the floor drain is installed, the floor drain core must be taken out, so as to prevent debris from falling into the floor drain core and causing damage.
2. Since the purpose of installing the floor drain is to drain water, the position of the floor drain device should be slightly lower than the ground to facilitate drainage. Before the floor drain device, if the drain pipe is too close to the ground, the drain pipe needs to be appropriately shortened, so as to ensure that the installed floor drain panel is slightly lower than the ground.
3. In order to ensure that the whole decoration effect is not affected, the position of the floor drain device should not be lower than the ground too much, so if the drainage pipe is too far from the ground, it should be filled with cement mortar, so that the purpose of raising the drainage pipe can be achieved, and the most perfect decorative effect can be ensured after the floor drain device is good.
4. When installing the floor drain, in order to avoid the blockage caused by tools and other debris falling into the drainage pipe, the drainage pipe should be blocked with a cloth or some soft items in advance, and only take it out when the floor drain core is installed.
The floor tiles and wall tiles of the bathroom have been tangled for a month, and the merchants who sold bricks have been tossed several times in the middle, either the size is not right or out of stock, and the deposit is returned, and they are tired, which god gives some advice, small apartment, no design company and no designer to draw, all rely on their own imagination, refer to a lot of Sumitomo's drawings, or can't settle down, to blow up wow, the first self-installed house, I'm afraid that the effect I want can't come out.
The key is to have a U-bend that can store water, so that it will not run out of flavor.
If the bathroom is not dismantled, the old floor should be polluted, and the main thing is to clean and remove stains. >>>More
You can replace the floor drain of your home, the sinks you said are relatively shallow, which refers to the more common shallow water seal floor drains, and the current floor drains have other anti-odor floor drain products, the principle is different, there is an anti-odor core. >>>More
It's also hard to clean the bathroom in my house, and as a housewife, solving this kind of thing is my strength. That's why I recommend you clean them up like this. >>>More