What are the acceptance criteria for the rough house? Is there a toilet in the delivery standard?

Updated on home 2024-07-22
8 answers
  1. Anonymous users2024-02-13

    1. The door is a place that is easy to be forgotten, and the homeowner happily takes the key to open the door and cares about it to see what the house looks like, and the appearance and appearance of the door are left behind, and such a process is absolutely undesirable. Now the residential installation is anti-theft doors, after opening the door to carefully observe and touch the surface of the door with your hands, to see if it is smooth, whether there are scratches or places that have been hit, and then visually see if the door frame is correct, because the door frame is not correct will directly affect your use in actual life in the future, you should try the lock back and forth to see if it can be opened and closed normally, if you encounter a problem, you should reflect it to the property in time to replace.

    2. In the acceptance of the rough house, the wall and the ground are the key places with a large area. Check whether the walls and floors of the room are flat, and whether the walls of the kitchen and bathroom are hollow. If the wall is uneven, it will bring a lot of trouble to the future decoration, and the ground is not flat enough will also affect the future tiling or flooring.

    If there is a hollow place on the wall of the bathroom and kitchen, it is easy to fall off after the tile is pasted in the future decoration.

    3. When inspecting the house, it is necessary to check whether each room has electricity, and each room has a simple light bulb to see if they are normal.

    4. In the rough room, the bathroom and kitchen are all good water pipelines, but most of them do not have faucets. You can take a bucket of water and pour it into the pipe to see if the water is happy and there is no blockage. The floor of the bathroom should be waterproof, but it is impossible to do a water shielding test due to conditions during the house inspection, so it is necessary to let the decoration workers do a water shielding test before decoration, and see if there is water leakage after 24 hours.

    5. The ventilation system is a big problem that is easy to be ignored during the house inspection. Flues and exhaust ducts are places that are easy to leave hidden dangers for daily life in the future.

  2. Anonymous users2024-02-12

    The rough house is whether the water and electricity in the house are in good condition.

    The finished things on the scene: whether the doors, windows, empty guns, etc. are alive and in good condition.

    There are also hollowing and cracking of the walls. whether the sewer pipe is unobstructed, etc.

    There is no toilet in the rough house.

  3. Anonymous users2024-02-11

    The acceptance criteria of the rough house, don't be fooled by the developer, you will know after reading it.

  4. Anonymous users2024-02-10

    Special attention should be paid to the following during home inspection:1Check the wall, see if the wall is cracked, use a ruler to close the wall to check the flatness, the gap is reasonable within centimeters, hit the wall with a hollow drum hammer, and the hollow drum in a room can not exceed two places.

  5. Anonymous users2024-02-09

    1. Structure: reinforced concrete frame shear wall structure.

    2. Exterior wall: The exterior wall is pasted with high-grade exterior wall bricks and high-grade granite.

    3. Elevator: high-speed elevator operation.

    4. Elevator halls on all floors: the ground is pasted with beautiful high-grade polished tiles, the walls are pasted with high-grade marble, and the ceiling is painted with glue paint.

    5. Stairwell: the ground is pasted with high-grade polished tiles, the walls are pasted with high-grade tiles, the walls are painted with glue paint, and the ceiling is painted with glue paint.

    6. Public corridor: the ground is pasted with high-grade polished bricks, the walls are pasted with high-grade polished tiles, and the ceiling is hung with gypsum board.

    7. Intelligent system: The building is equipped with advanced video intercom system.

    When closing the house, you need to pay attention to the following details:

    1. It is necessary to check whether all the doors and windows in the embryo room are damaged, whether the accessories are complete, the details (the strong and weak orange calendar box, the line in place), whether the drainage and drainage pipe is damaged, and whether the lock and handle are damaged;

    2. All kinds of pipelines should be carried out for water flow, pressure test, ball test and heating thermal commissioning and other acceptance work;

    3. The roof project shall carry out water storage and water spraying tests. It is important to check whether the drainage of drainage pipes, sewage pipes and floor drains is smooth and unobstructed;

    4. The floor of the room with waterproof requirements should be planned in strict accordance with the building requirements of the waterproof layer and the protective layer, and two water storage tests should be carried out during the acceptance to achieve no leakage. Observe whether there are water traces, watermarks, etc. on the top of your house to prevent future disputes caused by water leakage on the upper floor;

    5. Check the wall to see if there is a hollow drum in the plastering layer (you can take a small hammer and knock it slowly);

  6. Anonymous users2024-02-08

    Rough house, generally only the door frame in the house, the degree of decoration belongs to the initial decoration, therefore, it is also called "rough house", and in some places it is also called "clear water house". The purchase of a rough house also needs to be delivered, what is the delivery standard of the rough house? What is the national standard for the delivery of rough houses?

    This article will focus on this.

    Most rough houses only have door frames and no doors, and the walls and floors are only done with basic treatment, and the exterior finishes of balconies and rain covers should be completed in accordance with the design documents.

    The state has defined the delivery standard of the rough house accordingly, what is the delivery standard? As follows:

    1.All the exterior finishes of the rough house, which covers the exterior finishes of the balcony and rain cover, should be completed according to the design documents.

    2.Some parts of the blank house, for example, common parts, public facilities, various pipes (feeding, drainage, rainwater, heating, heat), electrical equipment (distribution boxes, cabinets, panels, sockets, switches, lamps, etc.), these parts should be standardized by the design documents, and complete the decoration, in addition, all kinds of testing work should be completed according to the regulations.

    3.All kinds of pipes in the blank room should have the acceptance of water flow, pressure test, ball test and heating thermal commissioning.

    4.The roofing works of the rough house shall be subject to water storage test and water spraying test.

    5.Then, such as the prefabricated floor slab or cast-in-place slab roof should be used in the interior of the rough house and each room, it should finally achieve no plastering, leveling with putty, and the plate joints are dense, no cracks, smooth and smooth rubbing, smooth surface, uniform color, straight line angles and other states. In addition, the concrete of the base floor of each room in the portal also needs to be smooth and compacted early, so as to finally achieve firm bonding and no cracks.

    6.The room that needs to be waterproof in the blank room should be carried out in strict accordance with the specifications of the waterproof layer and the protective layer, and don't forget to carry out the water storage test twice when accepting, and the final requirement is that there is no leakage.

    7.In the rough room, the floor drain and flooding slope must meet the requirements of the design specifications to ensure that there is no flooding, the joint is tight and smooth, and there is no leakage.

    8.The elevation of the cement floor base layer of the room in the rough room needs to consider the height and size specification when reserving and decorating.

  7. Anonymous users2024-02-07

    With housing prices getting higher and higher, many people may only get the chance to buy a home once in their lifetime. For this reason, the new house purchased is particularly cherished, so how to accept the rough house? What are the points worth paying attention to in the acceptance criteria for the delivery of rough houses?

    First of all, the acceptance of paper materials in the blank room. Secondly, the acceptance of the quality of the rough house. Finally, the acceptance of the infrastructure of the rough house.

    Some very important paper materials in the acceptance criteria for the delivery of rough houses must be carefully checked one by one when handing over the house. For example, the "Residential Fuxiang Instruction Manual", "Completion Acceptance Record Form", "Residential Quality Assurance Certificate", as well as the as-built drawings and area measurement tables of pipeline distribution, in which the as-built drawings of the distribution of pipe deficiency and sensitive pulsation lines include weak current, strong current, waterway structure, etc. In addition, whether the actual accounting area and internal structure of the house are consistent with the promotional composition of the sales office also need to be considered on the spot.

    The acceptance criteria for quality in the acceptance criteria for the delivery of the rough house mainly involve the following aspects. First of all, the ground and wall, whether the ground is cracked or whether there is a hollow drum are very important quality inspection indicators. Whether the wall is seeping, whether the wall is falling off, how the overall flatness of the wall, especially how waterproof the top of the kitchen and bathroom, all need to be carefully tested to avoid unnecessary trouble after moving in.

    The acceptance standard for the delivery of the rough house on the acceptance of the infrastructure mainly includes the basic pipelines, sewerage, gas, electricity meters and other key facilities. Whether the drain is smooth, whether the water pressure of the faucet is well controlled, whether there is any leakage in the gas pipeline, etc., need to be carefully checked one by one. In addition, the waterproof acceptance of the blank room is also very necessary, and it is usually possible to test the water for three days to ensure effective test results.

    Compared with the decoration of the rough house, how to accept the rough house is a more important and necessary premise. I hope that this article about the acceptance criteria for the delivery of the rough house can make you wish you a helping hand when you accept the rough house.

    You can get it for free

  8. Anonymous users2024-02-06

    Many people buy a rough house so that they can decorate it according to their preferences. So what are the acceptance criteria for the rough house? Under what circumstances can a home buyer refuse to take possession of the property?

    1. All exterior finishes, including balconies, rain covers and other exterior finishes, should be completed according to the design documents.

    2. All decorations of common parts, public facilities, pipelines, electrical equipment, etc. should be completed according to the design documents, and various test items should be completed according to the regulations.

    3. All kinds of pipelines should be subject to pressure test, ball passing, water test and heating thermal commissioning and other acceptance work.

    4. The roofing project needs to carry out water storage and water spraying tests.

    5. If each room within the entrance door adopts a prefabricated floor slab or cast-in-place slab roof, it should be leveled without plastering and putty, so as to achieve dense slab joints, no cracks, smooth rubbing without misalignment, smooth surface, basic uniform color, and straight line angles. The concrete of the base floor of each room within the entrance door should be smooth and compacted to achieve firm bonding and no cracks.

    6. The ground with waterproof requirements should be planned in strict accordance with the building requirements of the waterproof layer and the protective layer, and two water storage tests should be carried out during acceptance to ensure that there will be no leakage.

    7. The slope of floor drain and flooding meets the design requirements, so that there is no flooding, and the joint is tight and smooth, and there is no leakage.

    8. The elevation of the cement floor base of various rooms should be considered when reserving the height size requirements for redecoration.

    What are the circumstances in which a home buyer can refuse to take possession of the property.

    1. If the house is not equipped with water, electricity, gas and heating, it can refuse to accept the house.

    2. Those who have not obtained the "Completion Acceptance Record Form" can refuse to accept the house.

    3. If the developer delays the delivery of the house, and the house is delivered more than three months after being urged by the owner, it can refuse to accept the house and demand compensation.

    4. If the quality of the house is unqualified after inspection by relevant institutions, it can refuse to accept the house.

Related questions
7 answers2024-07-22

Rough house delivery standards: walls, ceilings, indoor doors and windows, various pipelines, water, electricity. Rough room inspection standards: ceiling, wall, floor, balcony, kitchen, bathroom.

6 answers2024-07-22

After the developer has fulfilled the normal delivery procedures to the owner, the owner does not move in time, and the property fee is also required. >>>More

7 answers2024-07-22

The steps and methods of water and electricity decoration of the blank room are as follows: >>>More

11 answers2024-07-22

Introduction: For owners who are not connoisseurs, it is a very troublesome thing to accept the rough house. But as long as you master some tips and bring the tools of the house inspection, it is not difficult to accept the rough house. >>>More

8 answers2024-07-22

Precautions for rough house inspection are:

1) Pay attention to see if the documents are complete: >>>More