  1. Anonymous users2024-02-12

    Is it better to go to the top or go to the ground for hydropower transformation? The analysis of the people who came over knew that there was no loss. When we decorate the house, the renovation of the hydropower project is a hidden project, so it can be regarded as a very important place for decoration, but when laying water and electricity, people are confused about the laying of the top or the ground, which method is better?

    Today, with questions, take a look at the analysis of a person who has come over, for those who plan to decorate their houses, the sooner they know, the better.

    Hydropower renovation is mainly to meet the needs of water and electricity in various areas of our indoor space, so the water pipes and wires should be distributed indoors. Or do you choose to lay on the ground? This is a matter of great concern to us.

    First of all, let's talk about the roof laying of water pipelines: first of all, the laying method is to route the lines along the corners of the top surface along the periphery, and then use the ceiling aluminum gusset after the laying is completed.

    Hidden, it is not only very beautiful, but also convenient for later maintenance, and will not cause too much damage. Because it is laid on the roof, the problem of water leakage in the later stage will not harm the neighbors downstairs, so the harm is less.

    Of course, there are certain disadvantages of roof laying, that is, when laying, more materials may be wasted, and the construction is more complicated and unsafe. Therefore, in terms of material costs and labor costs, the cost is higher.

    The second is the laying of hydropower on the ground, which is a more common and more traditional laying method. First of all, the biggest advantage of this laying method is that it can save a lot of material and labor costs, so we need to spend a lot less decoration costs.

    In addition to this advantage, its disadvantages are more difficult to ignore, because after the ground is laid, the surface is tightly sealed with concrete, so if there are problems and failures in the later stage, it will be more troublesome to repair, and once the water leakage occurs. Then not only will they suffer, but the downstairs will also suffer, which will affect the harmony between the neighbors, and the loss caused by the maintenance is relatively large, and the maintenance cost will be very high in the long run, so the money saved before will be all spent on the maintenance fee, and in general, there is no benefit.

  2. Anonymous users2024-02-11

    There are pros and cons to whether hydropower goes to the top or to the ground, and both can be taken according to their own needs and budget.

    1. Hydropower goes to the top.

    The biggest advantage of hydropower roofing is that it is easy to maintain. In case a water leak is found later, the leak can be found in time. In the event of a failure, the problem can be checked from the maintenance port, which is faster and less troublesome than the maintenance of water and electricity.

    Moreover, the water and electricity roof does not have to worry about affecting the indoor floor height, which is more conducive to waterproof operation.

    However, the cost of hydropower to the top is high. Because the water and electricity roof needs to be slotted in the ceiling, and the ceiling needs to be made in the later stage, it needs to spend more water and electricity material costs, labor costs, etc. Moreover, hydropower roofing may expose hydropower pipelines to surface installation, and depreciation may occur over time, so the service life is shorter than that of hydropower lines covered on the ground.

    2. Hydropower goes to the ground.

    Hydropower ground-walking construction is faster and more convenient, because there is no need to go through the slotting procedure and winding distance like the roof. Burying it directly under the tiles can save a large part of the cost. The layout of the whole space is more beautiful.

    When laying floor tiles in the later stage, it can basically cover the water and electricity pipelines, and there is no need to worry about the water and electricity going to the ground and protruding affect the safety and effect.

    However, the cost of damage to hydropower is high in the future. If there are problems such as aging and cracking, it is necessary to destroy the floor, tiles and other covering materials above the water and electricity, so as to repair and find problems, which will affect our lives, and the maintenance cost and labor cost are also high.

    In fact, it is advisable to go to the top and go to the ground, and it is recommended to negotiate with the responsible home improvement company to decide, and it can be better solved when you encounter problems in the future.

  3. Anonymous users2024-02-10

    When the new house is renovated, the water and electricity go to the ground; It is better to walk on the ground, because the ground is particularly easy to maintain, and it will not damage the wall, and it can also do a good job of dry and wet separation, and it can also be highly unified when laying pipelines, and the benefits outweigh the disadvantages.

  4. Anonymous users2024-02-09

    It is better to walk on the roof, and it will be safer to walk on the roof, and it is easy to leak if you go on the ground.

  5. Anonymous users2024-02-08

    When decorating a new house, water and electricity should go to the top, so that it will be more assured, and more convenient, if you go to the ground, when there is a leakage, it will be particularly troublesome; It is better to walk the roof of the house, so that when there is a problem, it is easier to repair, and the problem can also be found in time, but relatively speaking, it will become higher.

  6. Anonymous users2024-02-07

    Hydropower renovation is one of the most important aspects of the renovation process, and it is a part that has the potential to maximize losses. Whether it is water or electricity, as long as there is a little problem, the original engineering building will be demolished and revised, and the loss will become greater, forcing us to pay close attention to it. Hydropower engineering to the top or line to the top of these problems is a problem that most people will face, in fact, these two methods will occur in the current decoration, hydropower engineering to go to the top of the groove is more convenient, the layout route is also convenient. After grooved pavement, the PPR pipe can be firmly established. The short route of the water pipes saves raw materials and saves assets.

    The water pipe is not in direct contact with the gas at the top, the water pipe is fixed by the concrete mortar, and the working pressure of the flowing water is basically no harm to the water pipe, and the service life of the water pipe is relatively longer. If the floor heating structure, the hot water pipe of the restaurant kitchen does not need to go out by the drainage method, then the water and electricity project can be taken without the ceiling, because of the cable specifications (small cross-sectional area or 4 cubic millimeters) with yellow wax pipe, the waterway to the bathroom or restaurant kitchen is undoubtedly integrated with the board ceiling, not the ceiling can be, the top surface is sprayed black, and the industrial wind is OK. However, this is the unpopular crowd.

    Do not hang the ceiling to go hydropower projects must be slotted at the top, the roof is all cast-in-place concrete into English, the diameter of the line pipe is 16hmm, to completely cover the pipe, at least the groove can not be less than 30mm, time-consuming, suitable for part of the mobile renovation can not be suspended; Renovation of water and electricity, are the same problem, and the outer diameter of the water pipe is higher, and the trough is deeperIn addition, there is a temperature difference in the waterway, and the top is more likely to crack! Therefore, in the case of not suspended ceilings, it is better not to go to the top.

  7. Anonymous users2024-02-06

    It will be better to go to the top, it will be more beautiful on the roof, it will look more convenient, and it is not easy to have problems, it is not particularly convenient to install on the ground, and it is likely to be short-circuited.

  8. Anonymous users2024-02-05

    The characteristics of the two are not the same, and it should be judged according to your specific situation. Walking on the top can avoid water leakage, reduce losses, and can also be detected in time. The ground is very cost-effective, and you don't need to think too much.

  9. Anonymous users2024-02-04

    If you are installing all-hardwood flooring, laminate flooring, or solid wood glued flooring...Once the water and electricity pipeline leaks or leaks, and can not be found in time, it will also be flooded and soaked in water, resulting in its deformation, deterioration, and is not conducive to the shortcomings of the floor reset and resuming the water to go to the sky, mainly manifested in labor costs and consumables, after all, the wiring of the water pipe should go from the wall, which is farther than when walking to the ground, which means that the slotting, material costs, labor costs and other aspects will increase.

    <> water lines are piped to the ground, and then grooves are made from the wall to the sockets, switches and outlets. This method will also appear dense line pipes on the ground, and must not be stepped on when handling decoration materials, otherwise the water pipes and wires will be repaired to the top surface, and the wall will open vertical grooves to reach each switch, socket and water point, and the advantage of this method is to avoid the problem that the ground pipeline is easy to bump in the construction process. The disadvantage is that you need to add a lot of ceiling fees.

    The way of water circuit layout should be a new type of water circuit layout method launched by some decoration companies, which was not available before. Therefore, the water circuit should be a decoration company, and there is no corresponding specification for this, if the furniture is more expensive. Let's not talk about maintenance, compensation must be given, who let you not do a good job of water and electricity!

    To repair it, you must pry up the bricks or floors, which is likely to cause serious losses and even affect the building.

    Unless it is a very special situation, there will be no water pipes in the living room and dining room, so for the living room and dining room, the main consideration is the wiring of the circuit, which is mainly divided into two situations: suspended ceiling and no suspended ceiling. Once there is a water leak in the water pipe, it is not easy to be detected at first, and when it is found, the water leakage is more serious, which may affect the downstairs and the downstairs neighbors have friction disputes and compensation problems!

    The other is that the water pipe goes to the ground.

  10. Anonymous users2024-02-03

    Hydropower should go to the top, so that it can be repaired when there is a circuit problem in the later stage, and the direction of hydropower can be covered by the ceiling.

  11. Anonymous users2024-02-02

    It's better to go underground. However, the kitchen and bathroom, which are prone to breakage, are still on the top because they are easy to repair.

  12. Anonymous users2024-02-01

    To go to the top, because when you go to the top, it is very safe, and it has very few safety risks.

Related questions
5 answers2024-07-13

Housing decoration, water and electricity to go to the top or the ground? What are the advantages and disadvantages of walking to the top and going to the ground? Advantages and disadvantages of home renovation water and electricity topping: >>>More

10 answers2024-07-13

Advantages: The ground does not need to be slotted, and in case of water leakage, you can quickly find the location to avoid disasters downstairs. Relatively safe. The maintenance of the top surface of another water circuit is more convenient and less expensive than the maintenance of the ground; >>>More

8 answers2024-07-13

Its walls are harder than the new houses, and it is very troublesome in terms of grooving and grooving, and it is necessary to demolish the old ones, and change the water and drainage, and some old houses are not allowed to destroy the floor tiles, which is also troublesome, so it will definitely be high.

8 answers2024-07-13

Hydropower decoration to go to the ground or to the top? Don't dwell on it, it's the right way to do it.  >>>More

19 answers2024-07-13

Hydropower totals about 7000, including the cost of slotting and the cost of water pipes and wires. >>>More