Don't groove the decoration cloth wires on the ground, smart people know how to install it like this, save money and be practical.
When the house is decorated, we need to consider a lot of problems, in addition to aesthetics, there is practicality, then when installing the circuit at home, we should be particularly careful, our life is inseparable from water and electricity, if the decoration is not installed, it will be troublesome after moving in, which is not conducive to daily life, many people used to install circuits at home, will choose to install wires on the ground, and use the traditional method, this method has been eliminated. Don't groove the cloth wires on the ground, smart people know how to install it like this, at least half of the money.
In the past, when the workers installed the circuit, they liked to groove more on the ground, so that the ground decorated horizontally and vertically, it would indeed be more beautiful, but in addition to that, there was no big effect, after the installation of the circuit, we would be paved with tiles or floors, so that even if the ground was beautiful, it would be blocked by the tile floor.
If there is a problem with any line, then you have to pry the tile or floor open, in order to find the place where the problem is, it is very troublesome, now many people install the circuit, are directly installed on the ground, will not choose to groove to lay the wire, if the wire is installed on the ground, the wire has a problem, we have to lift the tile or floor, and then check the existing problems, it is very laborious, it is a big project.
If we follow the traditional method of installing wires, it is very troublesome to install, the process of decoration should be slotted to the ground, and the wires should be installed in, workers can not directly do straight lines when installing wires, and the route will be done first when slotting, and there will be bent places when slotting, which is very time-consuming, energy-and-manpower, labor costs will increase, and it is quite troublesome to make.
If the wires are installed on the ground without slotting, there will be no such problem, and the wires can be installed directly, which saves costs and manpower.
-
No. It is not necessary to slotte the ground to go to the water, and the height is enough not to affect the paving of floor tiles. ”
-
Not necessarily. Buried pipe, as the name suggests, is a water and electricity buried pipe method that directly lays pipe fittings without opening any slots. (This does not include open pipes for suspended ceilings and open pipes with sufficient height difference).
Benefits: The transformation is cheap, the materials are also very cheap, there is no need to slot, and the damage to the ground is reduced.
Disadvantages: The place where the buried pipe is easy to cause the floor to bulge or the floor tile to crack, it is very troublesome to troubleshoot and repair, and the quality is generally easy to damage the pipe fittings in the follow-up decoration, which is not beautiful.
Buried pipe, as the name suggests, is to lay the pipe fittings in the groove on the basis of slotting, and finally seal it with cement river sand.
Benefits: **It is almost the same as the buried open pipe, the quality is reliable, it is very beautiful, the later maintenance is very convenient, and the safety is high.
Disadvantages: Slotting will take up a part of the time, if it is not a professional slotting will also cause damage to the wall and ground, some companies will take advantage of the trust of customers, cut corners, and customers do not know at all after sealing the slot.
In general, many hydropower renovations have been carried out in the form of buried pipes, of course, it is not excluded that some places still need to use buried pipes, which need to be considered by themselves.
-
It's best to separate, and try to ensure that it's horizontal and vertical If you walk diagonally, don't say more, just install a TV hanger and a water heater or something If you walk diagonally, the installer doesn't know that an electric hammer hits it It doesn't matter if the wire is broken What to do when the electricity arrives on the dark line is very flat and vertical It is also convenient to maintain It is possible to find the right position at once If you walk diagonally If you want to make a hole in the wall and install anything, you are afraid of hitting the wire If you want to make a hole on the ground, you don't have to groove It mainly depends on your needs.
-
The floor laying wire pipe does not have to be slotted, the pipe can be placed directly on the ground, but your floor will definitely use a very thick cement sand. The pipe does not have to be horizontal and vertical, you can walk it however, and you can mainly wear the wire. It is recommended that the wire pipe be laid, the wire should be worn, and the floor should be laid, which can reduce a lot of trouble, but it depends on your environment, whether it is allowed or not.
The socket line lighting line can be a root pipe, and your pipe is large enough, so it is recommended to separate it. If you want several rooms to be independent, this is also possible, each room into a pipe, each room is equipped with a leakage switch, lighting socket air conditioning and then in this leakage switch out, into the room line at least 4 square as well. In this way, the construction can be much simpler, but there will be a wire box in each room, and the appearance is not very good-looking.
-
It can be slotted on the ground, but if it is not recommended to slotted in order to save money, because after slotting, it is necessary to lay floor tiles, if there is any problem with the line in the future, it is necessary to chisel the floor tiles to deal with it, it is very troublesome, and there will be a bent place in the slotting, the time and energy spent and the money are greater, and now many of the wires are installed on the ground, which is simple and practical, and it is more convenient to deal with it in the later stage.
-
If the floor of your home has a protective layer, it can be slotted; If there is no protective layer, the grooving will destroy the load-bearing part of the house, in this case do not slot, otherwise it will leave a safety hazard. The ground is slotted, and the pipeline can be hidden in the trench, so that the construction behind it is very convenient and will not step on the pipeline. Hydropower is personally recommended not to be saved.
-
OK. Buying unknown materials saves money and is practical. Nowadays, many renovation companies are wiring on the ground. There are some materials that are not well-known, but they are also easy to use, and such materials do not cost much.
-
Some lines of home improvement wiring need to be slotted on the wall, but the decoration company says that the wall wiring can not be slotted, only vertical slots, is there such a statement? Let me tell you how to open the home decoration line and wall slotting.
The decoration company this statement exists, there are industry norms and standards for home improvement wiring in the wall slotting, and generally we need to understand the following points when slotting the pipeline on the wall
Wall slotting must first follow the principle of "horizontal and vertical". The slotting layout of hydropower pipeline construction must be reasonably planned, this is because we often need to nail the wall and ground in the later stage of construction, and if the pipeline slotting is unreasonable, it is possible to penetrate the water pipe or wire, resulting in water pipe bursting, wire leakage, etc.; And it may cause inconvenience in future pipeline inspection.
If the socket is in the upper half of the wall, the wall groove needs to be opened vertically up to the top of the wall to install the decorative corner line in the installation line, if the socket is in the lower half of the wall, the wall groove needs to go down vertically to the bottom of the installation baseboard. It is strictly forbidden to slotted the wall on the load-bearing wall and weighing column, if the decoration company really wants to lay the pipeline slotted planning to the world such as the load-bearing wall and column, then I can only say that they must not help you design, you must know that there are many construction teams to carry out hydropower renovation construction, directly on the load-bearing wall slotted to lay line pipes, which may affect the load-bearing structure of the house, there are greater safety hazards. And this part of the construction is a hidden project, and the owners are often invisible, but everyone must know about it.
Wall slotting should not be a large area of simple horizontal slotting, can not be opened, transverse slotting on the wall is an extremely dangerous practice, which is actually not much different from the demolition of the wall. If a 5 cm deep and 3 meter long transverse groove is dug in the load-bearing wall, the harm is equivalent to the overall demolition of a 1-meter-wide load-bearing wall. It is important to know that any form of damage to the load-bearing structure will reduce the seismic performance of the building itself.
Summary: Wall slotting should not be slotted horizontally, everyone must remember this. The principle of wall slotting should be followed, everyone should also remember, four words - horizontal and vertical. I hope this article helps.
-
The slotting of the home integrated wiring must be opened on the wall, but some places that need to be routed are opened on the ground, and most of them are opened on the wall, which is more reasonable.
-
I think it is more appropriate to open it on the ground, because it is more convenient for the ground to be repaired, and if it is opened on the wall, it may cause fracture damage to the surrounding walls, which is not conducive to maintenance.
-
The wiring is to be grooved in the wall, because the wall groove will be more convenient for later adjustments, and the cost of groove in the wall is also very low.
-
Open on the wall, and doing so will give us something to block these places from people from seeing the flaws in these places.
-
1. It depends on whether you use solid wood flooring or laminate flooring.
2. If the solid wood floor is used, the wooden keel is to be installed, then there is no need to groove in the ground, just walk in the wooden keel under the floor.
3. If the composite floor is used, then the slotting depth of the ground should be 30mm, (note: it must be a cast-in-place concrete floor, and it must be a leveled ground with cement sand, if it is a flat ground that has not been found with cement mortar, it must not be slotted, because that will destroy the safety of the ground structure). The use of 20mm PVC pipe is better, the flame retardant is a little worse, but not rusty, if the galvanized pipe is used, it will rust and corrode for a long time, and the iron oxide produced will react with the plastic of the wire and heat up and age, which will affect the long-term electricity safety.
4. After slotting, the dust in the tank must be cleaned before burying the pipe. Then, the embedded pipe is sealed with a grade of cement mortar that is one grade higher than the original ground.
-
If you use composite flooring, the slotting is about 2cm---3cm, and the cement and sand are repaired on it, and the slotting will not affect the ground structure. If you use floor tiles or solid wood, you don't need to.
-
Just lay it on the ground, because the floor has to be caged, so there is no need to worry.
-
Now it's all ground slotted and dark lines.
-
No slotting is required. It is not necessary to go above and below (sometimes there are special circumstances such as conflicts with geothermal heat, or other equipment has special requirements) to go to the top, if the ceiling shape can be covered, there is no need to walk your so-called dark line, the ground is there floor tiles and floors, and there is no problem with the following screed layer and keel wire pipe.
If there is no ceiling on the top, and you must walk the dark line, you can wear a yellow wax pipe (softer than the wire pipe as thick as a little finger), and then open a small groove the thickness of a finger on the ceiling, and walk the wire, which is in line with the standard.
-
Generally, there is no need to slot, the top and the ground are not necessary (sometimes there are special circumstances, such as conflicts with geothermal heat, or other equipment has special requirements) Go to the top If the ceiling shape can be covered, you don't need to take your so-called dark line The ground generally does not have floor tiles and floors, and there is no problem with the following screed layer and keel wire pipe.
If there is no ceiling on the top, and you must walk the dark line, you can wear a yellow wax pipe (softer than the wire pipe as thick as a little finger), and then open a small groove the thickness of a finger on the ceiling, and walk the wire, which is in line with the standard.
-
The roof is the lamp, generally at the beginning of the lamp line set out, if you think it is not suitable, directly on the top of the slot, in the same room, the movement should not be too big, so it is easier to get not slotted is to go to the ceiling, otherwise you have to slot, or take the gypsum line.
-
The ground must be slotted and must wear a threaded pipe to take a regular route must not be randomly routed If there is a line problem in the future, it cannot be accurately found The line causes unnecessary trouble and loss The roof does not need to be grooved with a card line card to fix it After hanging the ceiling, nothing can be seen.
-
Whether the wire is slotted on the ground needs to be selected according to the ground decoration material and method
Laminate flooring is directly laid on the ground: the ground has been leveled in this laying method, and after laying a moisture-proof cloth, the laminate floor is directly laid. Therefore, in this case, the ground line pipe laying must be grooved and smoothed with cement, and the height error within the range of 2m shall not exceed 3mm.
Build skeleton laminate flooring and solid wood flooring: because the skeleton has a height of 3cm, if the wooden skeleton is mostly made of 3 3cm square wooden strips, in this case, there is no need to open the groove, and it is very convenient to walk 20 PVC line pipe. It just adds a little bit of difficulty to the skeleton work.
Floor tile laying: Because the floor tile is laid, a layer of 3cm 5cm sediment layer must be laid first, and the line pipe can be directly buried in it. So in this case, there is no need to open the cable duct.
After opening the trunking, it is necessary to prevent water leakage, so it is best to apply a layer of waterproof paint on the surface to cover the cement joints after smoothing.
-
In this case, you don't need to slot, because the floor tile has a cushion of about three centimeters that can completely bury the conduit, and the indoor leveling or erection of the floor can also bury the conduit.
-
It is not slotted, but the PVC pipe should be laid to facilitate repair and replacement.
-
There is no need for slotting, which will have an impact on the structure.
It can be charged outdoors, nothing too much attention, it is best to charge it once when it is not used for a period of time, maintenance-free as the name suggests is that it does not need to be maintained Normal use is good If it is not used for a long time, it is best to replenish the battery once in two months Maintenance-free battery is the most taboo high-current charging It will cause the battery to be scrapped directly due to lack of water, and there are currently two main types of batteries used in the car, one is the lead-acid battery with electrolyte, and the other is the maintenance-free battery. The service life of an automobile battery not only depends on the structure and quality of the battery, but also is closely related to its operation and maintenance. Generally, the service life of automobile batteries is about 2 years, if properly maintained, it can reach 3 to 4 years, and if it is installed with a desulfurization device lead-acid battery capacity restorer, it can even reach more than 6 years. >>>More
Yes, but you have to take the household registration book and ID cards of both parties to the civil affairs department of your place to handle it, and in some places, you will also bring a certificate of unmarried pregnancy.
The wires used at home can be buried directly in the wall, but it will be troublesome to repair in the future, and the casing will be more convenient and faster for future maintenance and replacement.
Feng Shui compass can be dried in the sun, its material is very good, as long as the sun is not long-term exposure, it has no effect on him, this real estate is a matter of measuring Feng Shui, but it is commonly used.
The registration of the technical secondary school can only be registered at the learning center of the cooperation of the technical secondary school. >>>More