Many people think that their old house has been lived in for too long and renovated too old, so they want to renovate it to make it look like a new house. But in fact, the renovation of the old house is no less than the renovation of the new house, and special attention should be paid to the transformation of hydroelectric power. So here's the problem.
Do I need to change the water power to renovate an old house? What should I do about the water and electricity renovation of old houses? Next, the commander decorates and will bring knowledge about the water and electricity renovation of old houses, let's take a look.
If the house looks relatively new and the former landlord is well maintained, it is possible to do without water and electricity renovations. If the renovation of the house looks old, the electrical conduits may be aging or not suitable for the use of high-power appliances. It is recommended to renovate them all.
The existing wires and water pipes of the old house are all made of high-quality products, and the construction meets the specifications and can meet the requirements of the residents' subsequent use, so there is no need for transformation. However, if the previous hydroelectric materials are general or the installation does not meet the specifications, it must be dismantled and reinstalled. If only some parts of the area cannot meet the needs of use, it can be changed on the basis of the original.
Before the hydraulic renovation of the old house, it is necessary to understand the original hydraulic installation direction, know what can be saved and what needs to be remodeled. It should be noted that the renovation of hydroelectric power generation must be carried out by professional workers.
Professional water conservancy workers are requested to carry out the renovation according to the determined decoration renderings. Owners are advised to supervise on site. Negotiate at any time during the construction process to ensure that the renovation meets your own requirements.
In addition, supervising the site can solve any problems during the construction process at any time, thus saving construction time. Hydropower renovation is a concealed project, which is hidden on the wall or floor after decoration, so the material must be of high quality, so it is easy to have problems, and you will not worry about it when you use it in the future. When transforming hydroelectric power, it is necessary to pay attention to the distribution of strong and weak electricity demand, and to properly separate them, so as to put safety first.
After the completion of the water and electricity renovation project of the old residence, it is necessary to find a special decoration company for acceptance. Once a problem is found, it should be modified immediately to avoid delaying the progress of the later project. This is the relevant content in the process of hydropower generation and hydropower renovation of old houses for the renovation of old houses, please refer to the necessary owners and friends.
Whether it is the renovation of the old house or the decoration of the new house, the renovation of water and electricity is an important project in home decoration, but due to the obsolescence of the old house, the previous design of water and electricity should be reviewed, and special attention should be paid to the direction, layout, safety and practicability of water and electricity in the process of transformation.
-
Of course, there is no need to renovate, because it is a big project, especially troublesome, and it takes a long time to implement.
-
Yes, because hydropower has been used for a certain period of time, there will be aging problems, and it is easy to have potential safety hazards.
-
Yes, because some pipes have been damaged for too long, in order to protect people's safety and normal use, they need to be reconstructed.
-
It still needs to be transformed, because this kind of line will have certain safety hazards after a long time, and it is best to carry out transformation, which can also have a certain safety.
-
Generally, it takes 24 hours, in fact, it is still more complicated, and there are a lot of wires in it, so it is more difficult to renovate, and it is necessary to understand each line before it can be transformed.
-
This kind of ** is amazing, really good-looking, and we also love it, if every family can change to this, it will definitely make more money. But this change doesn't work locally in our area, as our local developers have moved water and electricity to the appropriate locations in each space. Circuit modification only needs to extend or change the height in the original space.
Some city developers just follow the distribution box, there are no sockets and switches behind the distribution box, and all the wires need to be redone during the renovation.
<> that's the essential difference. We would be very happy if the owner insisted on changing it to 200 meters instead of 20 meters. Therefore, when the new house is renovated, the circuit only needs to be changed, rest assured, the developed product line will not be broken, and it is enough.
The advice that can be given is that it can be changed partially or not as a whole, of course, if you are willing to spend money for convenience, it is naturally not in this list. The overall renovation seems to make the layout more reasonable, but the construction period is long, consuming manpower, material resources and financial resources; Local transformation can use the original overall line and pipeline for local adjustment, in the case of saving transformation costs, more targeted to solve local hydropower problems.
As long as the developer is not too pitiful, there is no need to do an overall transformation. Of course, in order to reduce costs, some development companies may not meet the needs of actual use in the household in terms of wiring, which brings potential safety hazards to electricity. This is to check the wiring reserved by the developer to determine whether the wiring needs to be rerouted, you can remove the electrical box to check the wiring, or turn over the socket switch panel to check the wiring inside.
Those who didn't see it, said that they must change the decoration company, and they definitely didn't negotiate it.
Do a detailed interpretation of the problem, I hope it will help you, if you have any questions, you can leave me a message in the comment area, you can comment with me more, if there is something wrong, you can also interact with me more, if you like the author, you can also follow me, your like is the biggest help to me, thank you.
-
Yes, because some old things are likely to have big problems, and if you redo it, you will have a very good experience of using it.
-
I think the words need to be redone completely, and if they don't be redone, it's likely that they will be very unaccustomed to it, and they will have to make a big detour.
-
It is not necessary to redo it all, because in the process of redoing it all, it may waste a lot of time, and it is also very stressful for your own economy, and it is enough to make appropriate corrections by professional designers to ensure that your daily life is not affected.
-
It takes 5 days per square bar.
How long does it take to retrofit waterways and circuits.
1. Material entry and inspection: 1 day.
Check the brand specifications of the materials in the hydropower stage, because inferior hydropower materials will directly affect daily use, and may even endanger the safety of people and property.
2. Hydropower slotting: 1 day.
Hydropower slotting should first determine the slotting route to ensure that the line slotting does not destroy the original strong electricity, does not destroy the waterproof and other principles, and then carry out the slotting work. It usually takes 1 day to carry out the grooving work.
3. Hydropower wiring: 1 day.
Hydropower wiring is also known as "pipe wiring", including water pipe layout, electrical pipe wiring and threading. Hydropower wiring should pay attention to the layout of waterway water pipes and circuit wires, and cannot be crossed.
4. Hydropower acceptance: 1 day.
Hydropower acceptance is to inspect the results of hydropower construction, if problems are found, they can be repaired in time, and it is not easy to wait until the construction of other projects is completed, and then modify the problems.
5. Sealing: 1 day.
The height of the sealing groove should not be higher than the plane where it is located, and the sealing groove must be tight, otherwise it will cause hollowing in the future.
Extended Materials. Almost the following three aspects cost a lot of modification.
1. Waterway transformation.
20pp-r water pipe (concealed): 60 yuan, 20pp-r water pipe (surfaced): 45 yuan, sewer installation (50pvc pipe): 60 yuan.
Each meter of water pipe contains one equal diameter, one reducer sleeve and one 90-degree elbow. Valve hardware is not included. Punching is charged separately, 40 yuan for load-bearing walls and 20 yuan for non-load-bearing walls.
2. Weak current installation.
Weak current includes two kinds of wires and conduits, and wires are ** lines, TV lines, ** lines, etc. The line pipe is **, the line pipe of the TV network cable, the open line pipe is 18 yuan meters, and the dark pipe is 28 yuan meters.
3. Strong current installation.
Flame retardant electrical pipes can not be threaded more than 3, more than 3 additional 5 yuan per meter. Switch socket bottom box 86 type 10 yuan, 118 type 15 yuan, 4 square wire plus 10 yuan per meter. The open pipe is 25 yuan.
Multi-pipe and same slot are billed as multiple dark lines. After the groove is buried, it is filled with gypsum or cement mortar. The dark tube is 35 yuan.
-
1. Generally, it takes about five days to transform a square, and it takes a few days, depending on the size of the house, the preparation of materials, the actual transformation plan of hydropower, etc., because the number of days required for hydropower transformation will be affected by these factors, so we need to reasonably arrange the construction period of hydropower according to the actual situation.
2. The important factor affecting the time of hydropower renovation is the size of the house area, under normal circumstances, the larger the house area, the larger the construction amount of hydropower transformation, and the more days required for the transformation, so if the housing area is different, the number of days required for hydropower transformation will be different.
3. Before carrying out the construction of home decoration and hydropower transformation, the construction personnel must communicate in detail in advance, and then work out a suitable construction plan, so that the actual construction in the later stage can be carried out in accordance with the construction plan, and it is not easy to have problems.
4. In addition, the preparation of materials will also seriously affect the construction speed of hydropower transformation, under normal circumstances, before construction, all the materials and accessories required for hydropower transformation must be prepared, so as to ensure that the hydropower transformation construction can be carried out smoothly, if the hydropower transformation can not be constructed normally because of the lack of a material or accessories, the entire construction period will be delayed.
-
Hydropower renovation has always been a concern of people, if the water and electricity at home have been used for a long time, it is necessary to transform the water and electricity. Hydropower is also a relatively hidden engineering project, and it is very important. If you don't pay attention to water and electricity during construction, you may have to rework or increase your costs later.
During the construction, the master must first determine the hot and cold water, and during the construction of the bathroom, the bathroom should be waterproofed, and the dry and wet should be separated. <>
The water and electricity at home has been in the house for a long time, because it is a relatively hidden project, and there are often owners stepping on the pit. If you don't find a good decorator or decorator, you will be pitted very badly, which will often lead to budget overruns. Water and electricity are very important in the use of the house, and if the water and electricity are not done well, it will be particularly troublesome.
When many people's houses are installed with water and electricity, the water pipes are not installed properly, resulting in a frequent lack of water when used in the later stage, which will cause a headache for the owners. <>
Need a retrofit? If the electricity is not installed properly at the time of installation, it is also particularly troublesome. Nowadays, most of the items in the house are electrical appliances that use electricity, and if you are cooking, you will be very upset if you suddenly trip.
Many people still live in old houses, and the water and electricity at home have been used for a long time, and often break down. It is possible that when you are taking a bath, you will suddenly run out of water, which is particularly bad. Personally, I think that after living in the house for a long time, it is necessary to renovate the water and electricity.
What's your opinion? Because the house has been lived for too long, if the water and electricity are not renovated, it is easy to have potential safety hazards. In particular, after a long period of time, the wire will deteriorate, which poses a threat to people's safety.
The water and electricity in the old house has been running for too long, and there are often water outages, which will bring great inconvenience to life. Therefore, it is necessary for hydropower transformation, which can make people more worry-free when using water and electricity. Hydropower is also a very important link, it will be used every day, if there is a problem with hydropower, it will affect normal life.
-
That must need to be transformed, because these things will actually age after a long time, and if they are not transformed in time, there may be potential safety hazards later.
-
I think it still needs to be transformed. Because a lot of things have aged over time. It's easy to get fires and the like.
-
Of course, it needs to be transformed, because the phenomenon of aging will occur after a long time of hydropower, and it is particularly prone to water and electricity leakage, which has a great impact on their personal safety, so every 5 or 10 years, it must be transformed.
-
Personally, I feel that it needs to be renovated, because the water and electricity will be old for a long time, and there may be leakage, so it needs to be renovated regularly.
-
My opinion is that there is no need to renovate, and if you use it for a long time, you will get used to it, and if you renovate at this time, it is easy for dangerous things to happen.
-
Of course it is needed, because the water and electricity problem is very important, and it still needs to be renovated after a long time.
-
It needs to be renovated so that it can make it more convenient for me to use water and electricity, so I think it should be transformed.
-
Usually when decorating, if you choose a better material, there is generally no need to renovate.
-
Home hydropower renovation is not an easy task, in the home hydropower renovation should pay attention to the following three aspects: 1, design the transformation plan in advance 2, do a good job of supervision during construction 3, pay attention to the quality of hydropower materials.
When carrying out the renovation of water and electricity at home, the transformation plan must be designed in advance, and the construction must not be started blindly, otherwise the transformation work has begun, and I don't know what to do next, and the result is that until the final completion, there are still many things that I want to do, and if I don't design the plan in advance, I always need to add things in the middle of the construction, and the cost of hydropower transformation will often exceed the budget, and the construction period of the transformation will be extended. Before the transformation, the design of the renovation plan also includes the owner has a clear idea of the layout of water and electricity in his home, to determine where the electrical appliances at home are placed, the need to install a few more sockets and a series of problems, in the transformation do not have an idea today and a change of idea tomorrow, which will cause great inconvenience to the construction personnel.
In the home hydropower transformation, do not hand over everything to the construction personnel, in the whole transformation process, must do a good job of supervision, it is best to have someone to the construction site every day to check the construction situation, because the hydropower transformation involves safety issues, must be very careful, and the hydropower transformation is done best not to make changes, once there are any omissions and mistakes due to negligence in supervision, there is no chance of secondary modification.
When carrying out home hydropower transformation, we should pay attention to the purchase of first-class hydropower materials, and choose regular manufacturers when buying materials, there are many hydropower brands now, and it is best to shop around when buying materials.
The project of home hydropower Yinchang renovation is very complex, involving many problems, and we should pay attention to the above three aspects when carrying out hydropower transformation.
You can get it for free
The snail raised at home does not need to be disinfected, as long as you pay attention to cleanliness and hygiene, it is okay, and it must be kept dry.
People are like this, what you can't get is always the best, so people always deliberately pursue those things that can never be obtained, and often ignore the people around them who have been silently loving them. If you are in true love, then don't break up easily, and don't wait until you lose it to regret it. >>>More
The quilt at home needs to be exposed to the sun frequently, and the benefits of drying the quilt are very many. Therefore, many families now choose to take out their quilts to dry when the sun is better. <> >>>More
In life, some young people actually pay special attention to their quality of life, so in such a situation, these young people will choose some better quality furniture when decorating their houses. Or choose some furniture with a more beautiful appearance, such as solid wood furniture. Because solid wood furniture is placed at home, it will give people a very atmospheric feeling, and solid wood furniture is also very practical. >>>More
The bedroom at home needs to be equipped with a desk cabinet, precautions when decorating: the biggest worry in the decoration of the large bedroom is that the filling is not satisfactory - there is a corridor close to 2 meters at the head of the bed or on the side of the bed for no reason, and the rich are also very distressed. Compared with furniture that is used very low times such as bedside stools, TVs, and tea tables, it is not as good as placing a writing desk. >>>More