After an accident occurs in the system, what is the content that the personnel of the relevant unit

Updated on society 2024-07-01
8 answers
  1. Anonymous users2024-02-12

    1. The content of the report includes the time and phenomenon of the accident, the displacement of the circuit breaker, the action and frequency of the relay protection and safety automatic device, the change of voltage, power flow, equipment condition and weather conditions, etc.;

    2. After the situation is ascertained, quickly report in detail the fault ranging and changes in voltage and power flow, and if necessary, transmit the recording map and on-site ** and other materials to the superior dispatching agency.

    According to the relevant regulations, after the production and business operation unit has a production safety accident, it shall take timely measures to treat the relevant personnel. Employees who have suffered damage due to production safety accidents have the right to claim compensation in accordance with the relevant civil laws if they still have the right to compensation in addition to work-related injury insurance in accordance with the law.

    Article 56 of the Work Safety Law of the People's Republic of China After a production safety accident occurs in a production and business operation entity, it shall take timely measures to treat and treat the relevant personnel.

    Employees who have suffered damage due to production safety accidents have the right to claim compensation in accordance with the relevant civil laws if they still have the right to compensation in addition to work-related injury insurance in accordance with the law.

    Article 55: When employees discover an emergency that directly threatens their personal safety, they have the right to stop operations or evacuate the workplace after taking possible emergency measures.

    Production and business operation entities shall not reduce their wages, benefits and other benefits or terminate the labor contract concluded with employees because they stop working or take emergency evacuation measures in the emergency situation in the preceding paragraph.

    Article 57: In the course of work, employees shall strictly implement their post safety responsibilities, abide by their unit's production safety rules and regulations and operating procedures, obey management, and correctly wear and use labor protection equipment.

    Article 58: Employees shall receive education and training on work safety, master the knowledge of work safety required for their own work, improve their work safety skills, and enhance their ability to prevent accidents and deal with emergencies.

    Article 59: Employees who discover potential accidents or other unsafe factors shall immediately report to the on-site safety production management personnel or the person in charge of the unit; Personnel who receive the report shall promptly handle it.

  2. Anonymous users2024-02-11

    the time, place, and background of the incident; switch tripping, protection and safety automatic device operation; System conditions, such as power flow, frequency, bus voltage changes, whether it oscillates, whether the equipment has overload and ultra-stability limits;

    damage to important equipment and the impact on important users; The main symbols and causes of the accident, and the course of the accident; system recovery, etc. For major accidents in the power system, the qualification review includes the business license and qualification certificate issued by the relevant departments, the qualification certificate of the legal representative, the construction resume and the safety construction record in the past 3 years; Whether the technical quality of the person in charge of construction, engineering and technical personnel and workers meets the requirements of the project.

  3. Anonymous users2024-02-10

    Summary. The detailed time, place, scope of impact, accident phenomenon (combustion, **, or flooding, etc.), whether there are people, or whether there are people trapped, possible causes of accidents, how to spontaneously combust flammable materials or short circuit of power supply, etc., potential risk prediction, such as flooding may lead to short circuit of power supply, secondary **, etc., recommended measures, such as cutting off the power supply, whether dry powder fire extinguishing or water fire extinguishing should be taken, closing the main valve of the liquid transportation pipeline, etc.

    When an accident occurs in the system, what is the main content of the requirement that the accident and the operation personnel of the relevant units must immediately report to the dispatch?

    Hello! Welcome to use the Baida Kai Book Know app, I am the answer to the main Qinghong zg0003 will be answered by me next, I am honored to serve you, I will take your questions seriously and carefully, typing and rectification of the information may take a few minutes, please be patient. 

    The detailed time of the accident, the slippage of the socks, the impact of the reputation, the accident phenomenon (combustion, **, or flooding, etc.), whether there are no personnel **, or whether there are people trapped, the possible cause of the accident, how to spontaneously combust flammable materials or short circuit of the power supply, etc., potential risk prediction, such as flooding may lead to a short circuit of the power supply, secondary **, etc., the recommended measures, such as cutting off the power supply, whether dry powder fire extinguishing or water fire extinguishing should be taken, closing the main valve of the liquid transportation pipeline, etc.

    Hopefully it will help you.

  4. Anonymous users2024-02-09

    In the event of an accident with the dispatching equipment, what should the on-duty personnel of the accident unit report to the deployment immediately?

    The accident situation of the equipment should be described in detail, including the time, place, type of accident, on-site personnel, etc. 2.Degree of Impact:

    The impact of equipment failure on production, work, traffic, etc., should be assessed, and the possible consequences should be explained. 3.Rescue Measures:

    Rescue measures should be initiated immediately, and the emergency measures that have been taken and the effects of treatment should be explained. 4.Governance Measures:

    Containment and preventive measures for the accident should be proposed, and the timing and manner of the plan should be stated. 5.Coordination Needs:

    If you need the support of other departments or units to coordinate with Fengshixiang, you should indicate the requirements and needs in a timely manner. The above content should be reported to the nuclear and starvation distribution in as much detail and accuracy as possible, so that timely measures can be taken to protect the safety of personnel and reduce losses.

  5. Anonymous users2024-02-08

    the time, place, and background of the incident; switch tripping, protection and safety automatic device operation; System conditions, such as power flow, frequency, bus voltage changes, whether it oscillates, whether the equipment has overload and ultra-stability limits;

    damage to important equipment and the impact on important users; The accident is mainly like the sign and cause of the accident, and the accident process; system recovery, etc. For major accidents in the power system, the qualification review includes the business license and qualification certificate issued by the relevant departments, and the legal representative.

    Qualification certificate, construction resume and safety construction record in the past 3 years; The technical quality of the person in charge of construction, engineering and technical personnel and workers is to be confused about whether it meets the requirements of the project.

  6. Anonymous users2024-02-07

    When an accident occurs in the system, the accident and the relevant units should immediately and accurately report the situation to the relevant superior duty dispatcher. The content of the report includes the time and phenomenon of the accident, the displacement of the switch basetrack, the operation of relay protection and safety automatic devices, the changes in frequency, voltage, power flow and equipment status. After the situation is clarified, a detailed report will be made quickly.

  7. Anonymous users2024-02-06

    In the following cases, the accident unit can deal with it first and report it without waiting for the dispatch instruction:

    1. When there is a threat to people and equipment, take measures according to the on-site regulations;

    When the self-consumption of the power plant and substation of the Doukuanqiao 2, power plant and substation is completely or partially cut off, the self-consumption shall be restored with other power sources;

    3. When the frequency is reduced due to system accidents, each power plant increases the output of the unit and drives out the standby generator set to merge into the system;

    4. When the system frequency is low to the value of the decommissioning device according to the frequency and the low frequency decoupling device, and the device does not operate, the switch that should be cut by the device should be manually cut immediately after confirming that it is correct;

    5. The dispatching procedures and on-site procedures clearly stipulate that accidents can be handled by themselves without waiting for the instructions of the dispatcher on duty.

  8. Anonymous users2024-02-05

    1) If there is a threat to people or equipment, take measures according to the on-site regulations.

    2) When the self-consumption of power plants and substations is completely or partially cut off, the self-consumption shall be restored with other power sources.

    3. When the frequency is reduced due to system accidents, each power plant increases the output of the unit and drives out the standby generator set to merge into the system;

    4) When the system frequency is as low as the load reduction according to the frequency, the low-frequency decoupling device should be dismantled and dismantled, and the device is not operated in the air, the switch that the device should be cut off immediately after confirming that it is correct.

    5) Accidents that can be handled by themselves without waiting for the instructions of the dispatcher on duty are clearly stipulated in the dispatching procedures and on-site procedures.

Related questions
4 answers2024-07-01

Reversing is your responsibility, wearing slippers should be handled by the traffic police, and it should have nothing to do with this accident. If you reverse the car and go straight, it is his responsibility and he will be sentenced to driving illegally.

5 answers2024-07-01

Legal Analysis:1. First, report the case to the insurance company of the party fully responsible. 2.The staff of the insurance company shall conduct an investigation in a timely manner, and the fully responsible party shall fill in the claim form. 3.The insurance company reviews the claim form. 4.After the approval is passed, the claim will be settled. >>>More

15 answers2024-07-01

The regulations are like this, a head-on collision: 13 km h airbag must not detonate, 13-18 km h is a blurred area, can detonate or not, 18 km h or more must detonate. >>>More

5 answers2024-07-01

1. The scene of the accident.

1) When a traffic accident occurs, the owner must turn on the vehicle's hazard warning lights as soon as possible, and set up a hazard warning sign behind the car. The advantage of this is to prevent a rear-end collision with a vehicle behind you, so as to ensure the safety of the people in the car and the vehicle itself. >>>More

6 answers2024-07-01

Generally, if the car is involved in an accident and collision, if it is not handled, it should be towed to the parking lot, you can refer to it.