As long as the house is not deformed after hydroelectric slotting, there will generally be no cracks with cement, caulk, gypsum powder, etc., but when filling after slotting, the debris in the groove needs to be cleaned up, and then filled, leveled, and so after the filling is thoroughly dried, you need to brush the waterproof putty, and on the grid, in the last putty, and repair the surface of the wall after drying.
-
It is best to use cement mortar for water and electricity line pipe grooves first.
Fill the leveling first, and then level the wall after drying, the user is sure that there will be cracks in this method, it is only a matter of time.
Reason: The water absorption and elasticity of the fast-adhesive powder and the wall are different, after many times of water absorption and drying, thermal expansion and cold contraction.
The cracks came out. If it is cement mortar, it is basically the same as the original wall material (water absorption and elasticity), and no matter how long it takes, no cracks will appear.
-
It's very simple, first bury the pipe into the wall as deep as possible, preferably more than one centimeter, and then fix it. When filling the groove, you should first water, rinse off the ash on both sides of the groove and inside, especially the aerated bricks to water more, and then use mortar to make up a random one, don't fill it up, just cover the pipe. Then go and make up the next groove, and when the first one is almost dry, then come back and make up the second one, so that it will not crack.
-
Introduce to the owners and friends how to fill the trunking in the hydropower transformation.
-
Water, the cement mortar should not be too large.
-
After the hydropower is grooved, fill it with caulk so that there will be no cracks.
The caulk has strong adhesion, small shrinkage, strong color fixation, anti-crack flexibility, good decorative texture, pressure resistance, wear resistance, and mildew resistance, so the caulk can perfectly repair the cracking or damage of hydropower slotting, and the surface can also be painted, with good waterproofness.
-
As long as the house is not deformed after hydroelectric slotting, there will generally be no cracks with cement, caulk, gypsum powder, etc., but when filling after slotting, the debris in the groove needs to be cleaned up, and then filled, leveled, and so after the filling is thoroughly dried, you need to brush the waterproof putty, and on the grid, in the last putty, and repair the surface of the wall after drying.
-
Decoration Engineer Da Cui explained how to deal with the backfill of the trunking after changing the water and electricity, hoping to help you in decoration.
-
As long as the house is not deformed, there will be no cracks with cement, caulk, gypsum powder, etc., and if it is a bathroom, it is best to do waterproofing in the tank before filling.
-
After the secondary wiring of the wall due to slotting, it should be repaired in accordance with the specification so that there will be no cracks 1. After the slotting construction is completed, the slotted wall part will be removed from the scum, sundries and evacuation mortar blocks;
2. Use cement to fill and level the grooved place;
3. After the cement is completely dry, use gypsum for base treatment;
4. After the base treatment is completed, brush the waterproof putty for the first time and lay the mesh cloth;
5. After the first putty is completely dry, the second putty is painted;
6. After you dry thoroughly the second time, use sandpaper to smooth the putty on the surface of the repaired wall;
7. Finally, you can paint the wall paint.
Note that the area of the second repair is generally expanded to about 10 cm on both sides of the groove, which is convenient for repair and beautification.
Let me tell you in detail in the vernacular, first of all, the premise of your question is (1) do not hang the shed (2) do not want to go to the ground, because the geothermal heat is afraid of leaking the pipe (3) the way of the wire (4) the way of the waterway Because I am the construction supervisor in the north, our operation method is as follows: (1) First of all, the way of walking the wires without hanging sheds: because the light positions in the living room, bedroom and dining room are all taken in and basically will not move, so there is no need to planing ditches under normal circumstances, and the bathroom, kitchen and balcony must hang PVC or aluminum gussetIf the switch itself is two controls want to add another control can add another live wire in the original line pipe, and there is no need to planing the ditch, (if the landlord does not understand too much, the electrician you invite he understands) so that the wire on the shed surface is solved, of course, I am not absolute, sometimes according to the actual situation also need to plane the ditch (2) The following is the way to go for the geothermal wire: >>>More
Because from the perspective of this construction engineering procedure, it is divided into three partsIf it's yoursRenovation companyTo undertake your renovation, then your decoration company is directly responsible, but if it is said that you hire your own workers, then it depends on your own prior agreementAfter all, such a thing as filling the pipe groove does not require high technical content. <> >>>More
Although it is a small thing to make a groove, it is a lot of thought in construction. Ignoring certain problems can easily affect the future hydropower transformation, so is there a way to avoid the problem of slotting? The old electrician said that there is no need to groove in hydraulic transformation. >>>More
It is no longer the era of "the words of the matchmaker of the parents", so each of us has to be responsible for our own feelings. I don't know how many marriages without love exist in this world, but they choose to settle in their lives, so marriages without love and direct transition to family affection are soulless, and they have never lived for themselves, but for the sake of parents and children, this kind of relationship may be compromised for a lifetime, and some people can only become halfway couples, which is not worth it in my opinion. <> >>>More
Many renovation companies have their own design ideas, including changing the water and electricity lines. Personally, it is recommended that the indoor space arrangement should be considered before decoration, as long as the water and electricity interfaces are reasonably convenient and sufficient. It is not advisable to change. >>>More