When decorating a new house, the water and electricity are not slotted, how should they be fixed?

Updated on home 2024-07-14
20 answers
  1. Anonymous users2024-02-12

    Although it is a small thing to make a groove, it is a lot of thought in construction. Ignoring certain problems can easily affect the future hydropower transformation, so is there a way to avoid the problem of slotting? The old electrician said that there is no need to groove in hydraulic transformation.

    In this way, the wiring is simple and safe, and it is no problem to use it for 20 years, and now the pedestrian decoration is doing this. Many people mistakenly think that hydraulic renovation must be slotted when decorating, but in fact, whether the decoration needs to be slotted is not fixed. Moreover, if you make a slot, it is easy to go wrong.

    Destroying the wall foundation, most of the wall foundations in our homes have load-bearing structures. So if the slotting is not suitable, the internal structure will be destroyed, bringing some safety risks to the building. There is no notch for hydraulic transformation, the wiring is simple and safe, and there is no problem with pipeline damage after 20 years of use, and the length and width of the slotting construction are required, so sharp points will be formed at the corners.

    These areas are prone to scratches when laying pipes, and there is a risk of water leakage. That is, if the notch has many drawbacks, the construction is troublesome.

    In the absence of notches, how should we arrange the pipeline, the master said that there are two ways to solve this problem. in the ceiling.

    On the wiring, do not put the water pipe on the ceiling, stick a slot in the ground. And, in the event of a leak, the problem can be identified immediately. At the same time, this construction method is relatively simple to maintain in the later stage, even if the floor tiles are not cut.

    or ground maintenance costs, which can also be greatly reduced. The pipes are laid directly on the floor, and in general, the floor slotted packaging looks beautiful, but it destroys the cement layer.

    In fact, it is not necessary to slotting during construction. If you lay the pipes on top of it, you will increase the height if you put tiles and floors later, but this kind of construction is relatively easy. Moreover, it can also play a certain role in protecting the ground.

    Please note, however, that this placement needs to be secured with an official card. This avoids a situation where a move or error occurs later. The building is protected by not sticking to the groove when it is hydraulic, but if you have a lower floor, it is not suitable.

  2. Anonymous users2024-02-11

    It can be wired for fixing, which is a very simple way, and it is also very easy to use, very practical, and very good.

  3. Anonymous users2024-02-10

    We can choose to replace it with some other substances, because if we don't deal with it properly, it will be very troublesome in the later stage, and it will also affect our normal check-in and water and electricity switching.

  4. Anonymous users2024-02-09

    In fact, we can use some nails to fix it, because it may be used in the later stage, and if it is not fixed well, it will be very troublesome in the later stage.

  5. Anonymous users2024-02-08

    When changing the water and electricity, do not groove, and fix the wires with nails into the wall in half of the pipe clamp.

    Usually the standard for fixing the ground conduit is to clamp a single conduit and multiple wires. The role of the pipe clamp is not only to fix the line pipe and prevent dislocation, but also to separate the line pipe and keep a certain distance, so that the cement can penetrate into it in the later stage of cement grouting, and there will be no hollowing of the tiles. That is, fixing the pipe with a pipe clamp prevents the tile from hollowing.

    The master directly used barbed wire to fix the water and electricity pipes together. Although it looks solid, it can actually have a big impact on the later bricklaying.

    Because the slotting construction requires horizontal and vertical alignment, some sharp corners will form at the corners. In these places, when laying pipes, it is easy to scratch the pipes, creating a danger of water leakage. However, there are many disadvantages of slotting, and it is also troublesome to construct, so there is no need to arrange water pipes in the ceiling to groove the ground.

    And if a leak occurs, the problem can be detected in the first place. There is no slotting when changing the water and electricity, and at the same time, the maintenance of this construction method is relatively simple, there is no need to cut off the floor tiles, and the cost of floor maintenance will be greatly reduced. Generally speaking, although the ground groove laying looks beautiful, it will destroy the cement layer, and it can be avoided in construction.

    If you find construction troublesome, let's take a look at the telescopic buckle now. It replaces the traditional "U-shaped pipe clamp" buckle design, which is more convenient for workers to operate, reduce the work flow, increase the mobility of the buckle, and facilitate later maintenance compared with the combination of screws and nuts. Many people mistakenly think that the hydropower renovation must be slotted when decorating.

    But in reality, it is not certain whether the renovation needs to be slotted. And slotting is easy to cause some problems. Since many walls and floors in our homes have load-bearing structures, improper slotting will damage the internal structure, resulting in some potential safety hazards in the building.

    The above is the answer to the question of how to fix the wires without slotting when changing water and electricity.

  6. Anonymous users2024-02-07

    You can directly fix the wire with tools, such as line cards, cable heads, and some devices to fix the wire.

  7. Anonymous users2024-02-06

    "Hydropower is not slotted, not only does it need the pipe clamp to prevent displacement, but also needs to set fixed points at the top base layer to prevent the dislocation of the wire pipe in the later stage, resulting in the reduction of the spacing between strong and weak wire pipes and signal interference. This requires the use of a professional clamp, which should be fixed between 500-100 mm, and a 20 cm long tin foil should be wrapped between the strong and weak wires to reduce interference. Water pipes should also be isolated with gaskets between pipe clamps and lines. ”

  8. Anonymous users2024-02-05

    We can fix the wires with snaps, or we can set fixing points on the roof of the house, so that we can prevent signal interference, or we can use professional pipe clamps.

  9. Anonymous users2024-02-04

    There are many different forms of decoration and construction of different owners' homes, and the controversy between the owners of whether to groove the home hydropower construction is still very large, and there are many suggestions on the Internet to both sides, which makes it more difficult for the owners, and they don't know whether it is better to groove or not. So should the decoration of water and electricity be slotted? What should we pay attention to in hydropower slotting?

    Let's take a look at the introduction.

    Should the decoration water and electricity be slotted?

    1. Hydropower slotting can protect the water pipe from being damaged during the construction process after installation; The slotting is convenient for future construction, reducing the probability of hollowing when tiling and ensuring the smoothness of the ground; Slotting can be constructed in a standardized manner, and there is no need to worry about signal interference in places where strong and weak currents intersect; It can also save the floor height, reduce the waste of the building height, and ensure the beauty of the interior; The groove facilitates the fixing of the pipes, and even if the floor tiles are damaged in the future, it will not affect the pipes.

    2. Slotting has disadvantages. Slotting requires cutting the structure of the house, which is destructive, and slotting will incur a certain cost, which is also paid by the owner.

    3. The cement layer of the floor of some houses is relatively thin and is not suitable for slotting, because there will be slotting and hitting the steel bar. If you do not slot, you need to pay attention to the protection of the finished hydropower products on site, add wooden boards on both sides of the condition, and supervise the site before the bricklayer enters the site if there is no condition, so as to avoid the damage to the hydropower pipeline caused by heavy stacking, cutting and processing. Keep a distance of more than 2cm between two parallel pipes, and fix every 50cm length with pipe clamps to reduce the probability of tile hollowing.

    4. If you consider from the safety issue, you don't need to open it without slotting, because it will really destroy the overall structure of the house, of course, everyone's idea is different, and if there are too many pipes for wiring, it is likely to be pitted for a lot of slotting costs.

    5. If you really need to open the transverse groove in the water and electricity decoration, it is recommended to avoid the load-bearing wall, and the length of the transverse groove should be controlled within 500mm. In addition, because once the water and electricity decoration is completed, it will be very troublesome to change the maintenance, so it is recommended that the quality of the lines and pipes purchased during the decoration must be passed, and you must not save money in this regard.

    What should I pay attention to when slotting water and electricity?

    1. The depth of hydropower slotting shall not be less than 3cm of the embedded diameter of the line pipe wall, so that the wall surface will not be uneven after the groove is sealed, and the wall paint cracking will be prevented from being too shallow for a long time.

    2. The horizontal groove of the load-bearing wall shall not exceed 100cm. Lateral slotting will destroy the load-bearing of the whole building, so that the seismic capacity is reduced and the wall is easy to crack, and the wall slotting should generally be vertical vertical slotting.

    3. The distance between the trunking and the trunking should not be less than 100mm, and the number of wiring pipes in the same trunking is not recommended to exceed 6.

    4. When encountering 90° bend of the line pipe, the position of the slotting should be expanded, so that the line pipe can present two 45° bends, so as to facilitate the threading and future maintenance during the construction process.

    5. Displacement of ceiling chandelier. The slotting of the top surface of the floor slab must pay attention to the position of the steel bar, and the depth of the groove is about 10mm, which is convenient for wearing the yellow wax pipe and tying the tape wiring, and it is strictly forbidden to lay the bare wire.

  10. Anonymous users2024-02-03

    If there is a demand, you can go to the slotting in the ground, wall, and roof, and pay attention to the depth and width of the slotting according to the water pipe and line pipe.

  11. Anonymous users2024-02-02

    Of course it does. When slotting, it must be horizontal and vertical, and when slotting, it must be ensured that it is not damaged in the middle and late stages of the construction process, and the construction must be standardized.

  12. Anonymous users2024-02-01

    To groove, measure the size in advance, and also determine the depth and position of the groove. Most can choose to bury it in a slot, which will be safer.

  13. Anonymous users2024-01-31

    The wire can be secured with a professional nail with a fixed wire, or the wire can be tied with tape so that the wire does not fall apart easily.

  14. Anonymous users2024-01-30

    You can use some external glue to fix it, so that you can fix the wire well, which is very good.

  15. Anonymous users2024-01-29

    While grooving is a trifle, there is a lot of attention paid to the construction aspect. If some of these issues are overlooked, it is easy to affect future hydropower retrofits. So, what can be done to avoid grooving problems?

    The designer said that the hydropower renovation could not be slotted either. Such cables have been used for 20 years, saving labor and safety without problems, and now the decoration industry is doing the same. Place the water pipes on the ceiling so you don't have to dig trenches in the floor.

    If there is a leak, you can find the problem first. At the same time, this construction method is relatively simple after maintenance, and the maintenance cost of floor tiles or floor tiles is greatly reduced. The clamp is divided into two parts, and the lower half of the clamp is driven into the wall (or ground) with a nail.

    After laying the pipe, in the process of laying the pipe, the pipe is directly snapped into the half. Finally, cover the pipe with the top half of the pipe clamp, secure both sides with screws, and place the two pipe clamps together.

    There are different kinds of cards, and the one I mentioned above is one of them. Others only have the lower part, so the last step can be omitted and the pipe can be inserted directly into the card. Floor grooving works don't make much sense – the room is the same height as two centimeters, and it's less and less likely to damage the pipes by stepping on them (people will be careful not to step on the pipes, the pipes won't be so fragile).

    Protect pipelines, especially when hydropower retrofits have just been completed. If it is not slotted, people standing on the ground will inevitably step on the pipe, causing damage to the pipe. When slotting, even if you step on the position of the pipe, it will not bear the weight of the human body because the pipe is level with the ground, and it will be damaged by stepping on.

  16. Anonymous users2024-01-28

    In general, there is little point in the construction of floor grooves - the height of the room is not the same as the two centimeters, and the possibility of stepping on the pipes is very small (people will be careful not to step on the pipes, and the pipes are not so fragile).

    Then we can go to the hardware store and buy some small nails that are specialized in fixing wires or the kind of rubber strips that go to a trench to fix.

  17. Anonymous users2024-01-27

    Professional pipe clamp fixing, pipe clamp fixing should be between 500-100 mm, and 20 cm long tin foil should be wrapped between strong and weak wires to reduce interference. Water pipes should also be separated by liners between pipe clamps and line pipes.

  18. Anonymous users2024-01-26

    I think the best thing to do is to drive a row of nails into the wall and fix the wires to the nails.

  19. Anonymous users2024-01-25

    1.The slotting is beautiful, the layer height is not lost, and the service life of the pipeline is increased.

    2.However, there is a risk that the groove may damage the structure of the floor slab, or the tile will be hollowed out after being paved.

    1. Will the slotting of water and electricity installation affect the load-bearing structure of the house?

    Many people are entangled in the installation of hydropower whether to groove or not, let's take a look at the problems of ground slotting.

    1) Worry about affecting the load-bearing structure of the house.

    2) Slotting will increase the construction cost.

    Generally speaking, there will be a screed layer on the top of the floor slab or reinforced concrete structure, and the slots are opened in this layer, so it generally has no effect on the load-bearing structure of the house.

    2. Why should hydropower be slotted?

    1. Hydropower slotting can protect the water pipe from being damaged during the construction process after installation;

    2) Slotting is convenient for future construction, reducing the probability of hollowing when tiling and paving, and ensuring the smoothness of the ground;

    3) Construction specifications, where strong and weak electricity intersect, there is no need to worry about signal interference;

    4) Save the floor height, reduce the waste of the building height, and ensure the beauty of the interior;

    5) The slotting is convenient for the fixing of the pipeline, and even if the floor tiles are damaged in the future, it will not affect the pipeline.

  20. Anonymous users2024-01-24

    1. Pipe slotting.

    When installing hydropower, the first thing is to need pipe slotting, which includes two aspects, one is water pipe slotting, and the other is wire line slotting. When the pipeline is slotted, it is best for the owner to check the quality on site to ensure that the horizontal and vertical lines are played before slotting, and the construction is carried out according to the line.

    2. Water pipeline installation.

    The installation of water pipes in hydropower installation is very important, most of the water pipe materials are PPR pipes, aluminum-plastic pipes, and the installation of water pipes should also pay attention to the placement of faucets, and the owners had better supervise and observe in person, so as to ensure its practicability.

    3. Wire wiring.

    Wires are a key material in hydropower installation, and the common wires on the market have copper core wires of more than square meters. When installing wires, it is necessary to separate the strong and weak currents, switches, air conditioning sockets and electrical sockets, so that the panel installation at the back will be smoother.

    4. Water pipe inspection.

    After the construction is completed, it is necessary to carefully check whether there are quality problems in the water pipes, so that the potential safety hazards of the waterways can be eliminated. When inspecting, you can use the method of pressure test, first use the gambling head to bet all the mouths to death, test the water with a pressure gauge, check all pipes and all joints after the pressure, and if there is no water leakage, it means that the water pipe installation is qualified.

    What to pay attention to in the installation of water and electricity.

    1. When designing the waterway, you should first think about all the equipment related to water, such as water heaters, water purifiers, washing machines, toilets and wash basins, etc., and think about the installation location, method and whether you need hot water.

    2. In addition to the water outlets such as wash basins, cloth pools, and clothes machines, it is best to install a faucet in the bathroom to facilitate the connection of water and flushing the ground in the future.

    3. It is best to have the property present when conducting the suppression test, so as to play a supervisory role and avoid some decoration teams from deceiving the owners. The method of pressure is to open the "return valve" of the pressure pump to form a circuit to see if there is pressure in the tube, especially for the electric pressure pump, we should pay more attention.

    4. After the waterway is installed, it is necessary to pay attention to check whether the waterway in each place is kept unblocked, such as: whether each drain outlet of the faucet such as kitchen, bathroom, balcony is unobstructed. If you find that the drainage is slow or poor, you should get the property unblocked in time.

Related questions
7 answers2024-07-14

When the new house is renovated and accepted for water and electricity, the following places should be checked: >>>More

14 answers2024-07-14

When decorating a new house, the easiest way to locate the water and electricity in the home is to locate it according to the overall layoutFor example, when we coordinate the overall layout, the bathroom is in**bedroom**, the kitchen is in**, the living room is in**, and all the electrical appliances to be installed in these places, most of the locations we need to know in mind, in order to accurately locate the location of water and electricity, and then when we do water and electricity, we can be handy, and we can minimize the probability of rework. So before we do the water and electricity change, we should think of the following points: >>>More

19 answers2024-07-14

Because from the perspective of this construction engineering procedure, it is divided into three partsIf it's yoursRenovation companyTo undertake your renovation, then your decoration company is directly responsible, but if it is said that you hire your own workers, then it depends on your own prior agreementAfter all, such a thing as filling the pipe groove does not require high technical content. <> >>>More

12 answers2024-07-14

First of all, we must pay attention to whether he has a detailed line design, and pay attention to the lines that are pulled when accepting hydropower.

21 answers2024-07-14

Although it is small, if you are not careful, it will affect the convenience of life in the future. So how to design the waterway and circuit of the bathroom to meet the specifications? The following is a summary of 10 toilet water and electricity renovation experiences summarized in the past 10 years! >>>More