    How to write the interior decoration construction organization design plan.

    1. Organizational preparation.

    Set up a capable, efficient and complete project department to implement comprehensive management of the project. The project department is composed of a first-level project manager as the project manager, and the company has a number of decoration engineering construction experience, strong professionalism and sense of responsibility, excellent technology, proficient business, and excellent construction management talents; In terms of staffing, we will not only set up posts according to things and assign responsibilities to people, but also have the ability to specialize in multiple positions and be competent for multiple positions.

    2. Workforce preparation.

    The employees of the decoration company with intermediate and senior technical levels and many years of experience in decoration construction are selected to form four mixed construction teams with complete main types of work, which are responsible for the construction of the basement, the first floor, the second floor and the third floor of the project. According to the requirements of the implementation of the construction plan and the requirements of the construction schedule and the labor allocation needs plan, the labor force shall be arranged and organized in advance, and the corresponding organizational leadership system and management guarantee system shall be established.

    According to the requirements of the construction project undertaken by each team and team and its labor technology, quality, construction management and cooperation ability, etc., based on the company's internal construction task contract, sign the specific construction task contract, construction safety agreement and other relevant commitment and guarantee documents of the project, and clarify its work project and scope, work objectives, construction requirements, reward and punishment measures and other matters to meet the requirements of the construction of the project.

    Give full play to the company's advantages in construction organization and management, and make detailed arrangements for the relevant construction teams and teams by the project manager department and its management personnel according to the process, sub-region and cross construction, and then incorporate other professional subcontracting units into the management system of the project management department to ensure the realization of the construction period and quality objectives.

  2. Anonymous users2024-02-12

    Construction organization design.

    1 Preparation instructions.

    1 1 Preparation Notes.

    6. Civil construction drawings.

    1 2 Basis for preparation.

    2. Project overview and construction characteristics.

    2 1 Project Overview.

    2 2 Construction features.

    3. Main construction methods and technical measures.

    3 1 Circuit pipeline laying.

    3 2 formwork construction.

    3 3 Reinforcement construction.

    3 4 Concrete construction.

    3 5 brick masonry construction.

    3 6 Aluminum alloy door and window construction.

    3 7 Stone and facing brick construction.

    4. The main materials and construction machinery and equipment to be invested, and the main construction machinery entry plan.

    4 1 Preparation of construction machinery.

    4 2 Preparation of construction materials.

    4 3 Construction Labor Preparation.

    4 4 Construction Technical Preparation.

    4 5 Preparation of construction test and testing equipment.

    4 6 Construction measures in the winter rainy season.

    5. Construction organization and deployment.

    5 1 construction organization and main management personnel.

    5 2 Construction organization.

    5 3 Construction coordination.

    5 4 Construction flow direction, division of construction sections.

    5 5 construction site layout.

    6 Construction schedule.

    6 1 Construction General Schedule.

    6 2 Construction schedule Gantt chart.

    7 Workforce Placement Plan.

    7 1 Labor Usage Plans.

    7 2 Labor Dynamic Balance Sheet.

    8. Technical and organizational measures to ensure the quality of the project.

    8 1 Quality Management Objectives.

    8 2 Quality Management System.

    8 3 Quality Assurance Measures.

    9. Technical and organizational measures to ensure safe production and civilized construction.

    9 1 safety production objectives.

    9 2 Safety technology management system.

    9 3 Safety management system.

    9 4 Safety technical measures.

    9 5 on-site civilized construction measures.

    9 6 on-site anti-non-measures.

    10. Technical and organizational measures to ensure the construction period.

    11. Application of new technologies and processes.

  3. Anonymous users2024-02-11

    Hello, there are three main parts in the decoration contract, one part is the contract, the other part is the budget, and one part is the basic material list.

    The main attention to the following points in the contract: whether the contract is a regular version, whether there is a company seal, the construction period, whether the total amount is correct, how to pay for breach of contract such as construction delay, and the responsibilities of both parties.

    If the contract is a formal contract, then we have to carefully study the budget, all the best embodiment is presented in the budget, the basic budget must be optimistic about whether there is a unit price, (there are many decoration companies just present the form of the item, there is no detail, the later part of the project is not enough), in addition to check in detail whether the budget and the construction plan project are consistent. The main material budget will have detailed documents, if the product is selected when signing the contract, be sure to carefully check the product name, model, and specifications.

    There is another point that is often overlooked by the owner's friends, that is, the basic material list. We often pay attention to the budget and the contract, in fact, after the contract is signed, we don't know what the basic materials are, the best production, what brand and what model. Therefore, when signing the contract, it is necessary to ask the decoration company to attach a basic material list to facilitate the later acceptance.

    Renderings of Jane Mei style decoration.

  4. Anonymous users2024-02-10

    The signing of the decoration contract is the same as the details that need to be paid attention to in the signing of the general contract, which is divided into the following four aspects:

    1. Try to sign as many supplementary terms as possible, write everything you think of, and list in detail the brands, specifications, models, etc. of the main building materials involved in the decoration; List the unit price, total price, construction technology, etc. of each construction project; Detailed construction drawings: interior dimensional drawings; furniture layout drawings; Hydropower Renovation Diagram; Suspended ceiling drawing; the specific style of the door; Drawings of home details (such as elevations, sections, and detailed node drawings of projects that need to be produced on site, such as TV background walls); Renderings of the overall home style, etc.

    2. The contract should be stamped with the official seal and notarized by the competent department, and the following aspects should be paid attention to when signing the contract: 1) The construction period is agreed, and the completion date must be agreed before the start of construction. 2) Payment method, according to the pre-agreed payment ratio.

  5. Anonymous users2024-02-09

    First, the warranty period should be clarified. According to national regulations, the minimum warranty period for residential interior decoration and decoration projects is two years, and for kitchens, bathrooms and exterior walls with waterproof requirements, it is five years.

    2. It is strictly forbidden to add additional terms. There are additions, missing items, etc., and there should be no such additional charges.

    Third, the construction period should be clear. The construction period must be clear, if the construction period drags on, it will cause losses to the customer.

    The problems in the general workshop are mainly these three main precautions.

  6. Anonymous users2024-02-08

    The contract must specify the specific requirements for the renovation and the date of completion. Some consumers did not pay attention to these two points when signing the contract, which "created" conditions for some decoration companies to make shoddy work and delay the construction period; The specific brand or model of the decoration materials used must be indicated in the contract to avoid shoddy decoration companies; If there is an increase or decrease in some decoration projects during the project, it is necessary to fill in the project negotiation form and become an annex to the contract; The provisions of the contract regarding the warranty are indispensable, and the responsibilities must be clearly distinguished: if it is a construction or material quality problem, the decoration company should bear full responsibility; If it is improper use by the user, the two parties can discuss and solve the problem.

  7. Anonymous users2024-02-07

    Be sure to review the items included in it, otherwise it will not be good to add items later. See if there's anything wrong with the budget.

  8. Anonymous users2024-02-06

    The decoration company is tired, what should we pay attention to?

  9. Anonymous users2024-02-05

    The process description is not clear.

    In the decoration industry, some decoration companies that lack credibility will use vaguely defined words to describe the process in order to maximize profits; In the first list, what brand and model materials should be used, what specifications and what processes should be accurately described; At this time, many decoration owners often fall into these traps because they know a lot about the decoration industry.

    Indiscriminately increase the area of a single item.

    There are also some decoration companies that will make a big fuss about the single area of the contract, deceiving the owner not to carefully calculate the small area of each part, and increase the area of each construction project a little, thereby increasing the owner's decoration cost; It is recommended to do a random inspection of the area in the ** order before signing the contract to see if there is an inflated area of the single item.

    The materials are inconsistent with the provisions of the contract.

    When the decoration materials are entered, the owner should carefully check whether the materials are consistent with the brand and model reported in the decoration contract; Many decoration companies will use different models of materials of the same brand in the material, so when signing the contract, you should pay attention to the brand, model and specification of the material in the first class to avoid falling into the material trap.

    Beware of materials entering the market first good and then bad.

    At the time of acceptance by the owner, it is entered according to the materials marked in the contract, but in the process of decoration, the owner is not secretly replacing inferior materials, and many owners do not know at all, it is recommended that the decoration should be free to carry out surprise testing at any time, beware of shoddy decoration companies.

    When signing the decoration contract, it should be signed when the design plan and budget are determined; You should also check the qualification of the decoration company to see if it is a legal and formal qualification, and the specific requirements and completion date in the contract should be clearly expressed, and the liability for breach of contract should be clear before it can be signed.

Related questions
12 answers2024-07-26

It's nothing to say about small things, it's over, and it's just a matter of reducing your trust in your friends. If it's a big deal, then that person will know that it's more serious, and if it's too serious, he may not even be able to make a friend. So it's best not to hide things from others, especially from friends. >>>More

11 answers2024-07-26

It should be the song "One Man Has a Dream".

Song: "One Man Has a Dream". >>>More

21 answers2024-07-26

Surely it is impossible! Luffy can fight one of the generals at most, and it's hard to say whether he can win or not, there is no chance of winning three points, and there is no chance of two

32 answers2024-07-26

Either get married quickly, or say goodbye, there are more and more problems, and the more difficult it is to solve.

12 answers2024-07-26

If a man can't give you a sense of security, a stable life in the future, and a dedicated love, he won't be happy.