How to accept the house after renovation? What are the precautions for house acceptance?

Updated on home 2024-07-28
8 answers
  1. Anonymous users2024-02-13

    The waterway project is accepted to carry out the water addition test, open the water inlet valve, and observe whether the tap is the normal water output. At the same time, it is necessary to check whether the stainless steel sink and handwashing station drain smoothly and whether there is a blockage. In the future, it is necessary to use iron bottled water to introduce the anti-odor floor drain in the bathroom, restaurant kitchen, and living balcony, and check whether the odor-proof floor drain is smooth

    Check the top of the wall, balcony, toilet and restaurant kitchen to see if there is a leak, and if there is a ** watermark, check the situation as soon as possible.

    Before opening the door door, check whether there are dents, paint peeling and deformation at the door of the door, and at the same time keep opening the hardware locks to check whether it is convenient. At this time, it is necessary to take out the list of materials and check the brand of the anti-theft door, the level of the anti-theft system, etc. Pay attention to the part of the threshold, which is very prone to dents.

    The sliding door and casement window manufacturers in the room also need to be careful and careful, check whether they are intact, observe whether the sealing ring, door handle and other hardware are damaged or missing, and at the same time pay attention to whether the window edging is a structural adhesive, which is related to the cold and warmth and sound insulation and noise reduction, and also check whether the laminated glass used is marked with 3C.

    The acceptance of the wall project should check whether the sunny angle line is straight, check the flatness of the wall, and whether there are gaps in the wall, which are very important. The yang angle line is not straight, and the wardrobe assembled in the middle and late stages has a gap with the wall. The flatness of the wall is not very good, and the wall looks uncomfortable when the lights are turned on at night.

    There are gaps in the walls, which may be a problem with the construction. In addition, it is necessary to pay attention to whether the wall is seriously polluted, and it is found that real estate developers generally do not help to repair it in the middle and later stages. Floor tiles are used in many locations of the kitchen, toilet and large living room of the floor tile project, at this time, we must remember to check whether the floor tile has a wall hollow drum, and the surface of the floor tile can be easily identified by hitting the surface of the floor tile with a hollow drum hammer.

    If the hanger is installed on the wall hollow floor tiles, the actual effect of the load will be particularly poor.

    In addition, it is also necessary to check whether the corners of the floor tiles are cracked, and whether the floor tiles are damaged by missing corners, even if they are replaced. The decoration ceiling project acceptance fine decoration aluminum buckle plate is very simple, the bedroom is usually a circle of gypsum line, and the large living room is a simple paper top. When we test, carefully check whether the decoration ceiling and the wall are close, check whether it is cracked, and see whether there are steel nails exposed, and the plaster line socket should be leveled and clean.

    Kitchen cabinets and cabinets are the heavy pieces of the family kitchen, in the case of project acceptancePay attention to check whether the countertop of the cabinet is discolored, and whether the structural adhesive is complete. Open and close the door many times to see if it can be flexible, and you also need to pay attention to whether the door is on a surface to a certain extent.

  2. Anonymous users2024-02-12

    You can accept it yourself, or you can ask a professional acceptance engineer to help with the acceptance, and pay attention to the following points during the acceptance process: 1. Check the upper and lower water pipes in the kitchen and bathroom to see if the drainage pipes are smooth; 2. Check whether the distribution line and plug are energized; 3. Splash water to check the waterproof problem; 4. Check whether there is a hollow drum problem on the floor.

  3. Anonymous users2024-02-11

    Be sure to check the electrical circuits, check the waterways, check the sewer pipes, check the bathroom, check the kitchen, check if there are any hollows, these are all things to pay attention to.

  4. Anonymous users2024-02-10

    It is necessary to pay attention to the acceptance of water and electricity, but also to the acceptance of the ground, to pay attention to the laying of the ground, to pay attention to whether there is a hollow drum on the wall, and also to pay attention to the shower and toilet of the bathroom.

  5. Anonymous users2024-02-09

    I think it is possible to have a dedicated team to do the acceptance, they can check the condition of the house very well, and they can also give feedback; To check the water, electricity, gas and other equipment of the house, pay attention to whether the house has professional documents, whether the quality of the house is qualified, and check whether the wall is flat.

  6. Anonymous users2024-02-08

    It is necessary to check whether there is a hollow drum, and it is necessary to check the details of the processing, these waterways and circuits need to be checked, and they should be reasonably arranged and inspected according to the decoration situation.

  7. Anonymous users2024-02-07

    As we all know, if you want to live in a new house, you must first decorate, and decoration is a complex process, involving many aspects. For the owner, the decoration and acceptance of each link is particularly important. So,How to accept after renovation

    What should I pay attention to when inspecting a house?

    How to accept after renovation- Floor installation.

    How to accept after renovation?First of all, we must verify that the installed bond is strong, whether it will make a sharp sound, whether it will loosen. The surface of the wooden floor must be planned and leveled, without traces of saws, slag and burrs, and the texture of the wooden floor must be natural and clear; In the case of floor tiles, the joints must be firm and even; If making sockets, the components must be straight, the height difference must not exceed 3mm, and there must be no visible seams.

    How to accept after renovation- Cement.

    We must verify the quality of the cement, verify whether there is a product certificate, determine the type of cement, and clarify the use of cement.

    How to accept after renovation- Waterproof coatings.

    The thickness of the inner waterproofing layer is an acceptable focal point because only the waterproofing layer reaches a certain thickness before it has the ability to waterproof, so the amount of coating is actually quite large. We must also be mindful of the use of pollutants in waterproofing construction, otherwise there will be long-term effects on the indoor environment and must be monitored at the time of acceptance.

    How to accept after renovation- Roofing works.

    We have to look at the type of materials used in the roof, specifications, colors, infrastructure, etc. In the design, if the panel and keel are well connected, the joints are average, the roof surface is flat, whether there are cracks, whether there are missing, and it is also necessary to verify whether it meets the relevant specifications corners, etc.

    1. Inspect the quality of the house in detail, including cracks in doors, windows, balconies, etc.

    Since the new house has a long time, there will be some dust and construction debris on the doors and windows, so the doors and windows should not be pushed and sliding with brute force. If it feels clogged, observe it carefully and clean it with a broom.

    2. Check the flatness of the wall and whether there are cracks.

    Especially check some walls for watermarks, kitchen sanitary covers, exterior walls, etc. If so, it's important to find out the cause as soon as possible.

    3. Carefully inspect the ground for cracks.

    If there is a hollow drum, it must be solved, otherwise it will easily penetrate into the floor during the renovation process.

    4. The state of water, electricity and coal is unlocked and can be used normally.

    Turn on the faucet to control the leak and try to make the flow bigger and more urgent. Let's take a look at water pressure. Second, test the drainage rate. Use a multimeter to measure whether each power supply is unlocked.

    5. Check whether the facilities, equipment, etc. indicated in the sales contract are missing, if the brand and quantity are consistent, under normal circumstances, there should not be any major problems in this regard, but it is necessary to check carefully.

    You can get it for free

  8. Anonymous users2024-02-06

    Acceptance of a new house, the decoration process is a very important step. In the acceptance process, we can find the deficiencies and areas to be improved, and we can prescribe the right medicine to solve the potential safety hazards. So,What should be paid attention to when decorating and accepting the houseLet's do it!

    1. What should be paid attention to when decorating and accepting the house.

    1. Wall acceptance.

    Wall acceptance is the most basic acceptance, but it must also be taken seriously. Whether there are cracks in the wall and the appearance of the floor slab are the first items to check. For load-bearing walls and floor slabs, mark them at any time if they are found to be cracked; The inspection of the appearance of the wall also depends on whether the putty powder on the wall is evenly brushed and whether the wall is vertical and flat.

    Teach you a good way to check, use a 200W bulb to illuminate at night, anything on the wall can be seen under this light.

    2. Ground acceptance.

    After laying the floor, whether it is a wooden floor or a floor tile, the surface is particularly susceptible to scratches or damage due to other construction. Especially for tile floors, check for cracks, color differences, and chips. The tile floor will be reflective, so it is best to observe from a position 2 meters away when you accept it, so that you can observe it accurately and clearly.

    3. Waterway acceptance.

    The waterway acceptance is mainly aimed at hot water, cold water and reclaimed water. Reclaimed water is not used much in commercial housing units, mainly for hot and cold water. The first thing is to check the position of the water meter, and then the overall direction of the water pipe to see if there is any wrong pipe; whether there is a clear distinction between hot and cold water pipes; The most important point is the quality inspection of the pipe, whether it complies with the relevant national regulations; If the quality of the pipe is slightly inferior, it is easy to leak after long-term use.

    If possible, it is best to use copper pipes, and the laying of water pipes is mainly to go to the top.

    4. Circuit acceptance.

    Circuit inspection, first of all, see whether the wiring at the turn is wrong; Whether the wiring and tube meet the standards; whether the location and number of sockets are reasonable; Whether the distribution box has a good leakage protection is a very critical point. The lighting switch system should also be checked for the same as the design drawings. There is also the quality of the wire, which is also a point that should not be forgotten.

    It is best to use copper wire larger than 3mm.

    All of it. As an owner, I still need to know more about the knowledge of acceptance. In this way, if there is any problem in your life in the future, you can find the problem as soon as possible.

Related questions
7 answers2024-07-28

Nanning Baijiaju reminds that it is necessary to check the quality problems, mainly the details, and look carefully at the corners and corners to see whether the quality of the materials meets the requirements.

5 answers2024-07-28

It is not recommended to carry out renovation activities before the house is handed over. First of all, the ownership of the house has not been officially transferred before it is inspected, and if the renovation takes place during this period, it may raise a series of legal issues. Secondly, before the acceptance of the house, there may be some quality problems, such as wall cracking, unequal ground, if decorated in advance, it may lead to damage to the quality of decoration, increase the cost and trouble of later maintenance. >>>More

11 answers2024-07-28

The acceptance of the finely decorated house can be regarded as qualified only if the conditions are met: clarify whether the water pipe material is the standard raw material designated for the motherland, check the pressure to see if there is any problem with it, whether the faucet is smooth, whether there is a problem with filling the leakage, and whether there is a problem with the water body. It is also necessary to check the location of the odor-proof floor drain and water outlet, and observe whether the surface and interface of the sewage pipe are intact. >>>More

8 answers2024-07-28

For the decoration novice, when accepting the house, you can only look at the general details and are not clear at all, so it is recommended to find a professional house inspection company for acceptance when accepting the house.

14 answers2024-07-28

First of all, we should pay attention to the acceptance of hydropower, hydropower engineering is a relatively hidden project in the decoration, so we must carefully and carefully follow the standard acceptance when accepting hydropower, and then pay attention to the wall and floor tile project, the acceptance of this piece can not have obvious staggered joints, can not have broken bricks, etc., there is also the acceptance of paint, to ensure that the paint surface is saturated and clean without particles, and the matters to be paid attention to in the reception should be checked when the faucet is checked to see if there is a leakage, and when checking the toilet, it can be glued to the toilet to see if it is strong. How about the load-bearing, turn on the lights in the house when the switch and socket are checked.