The cost of the project is not to travel frequently and under the construction site 10

Updated on educate 2024-07-21
10 answers
  1. Anonymous users2024-02-13

    It is not necessary to travel to do the cost of the project, which should be decided according to the unit; But to do the cost, you must need to go to the construction site often.

    Engaged in the cost of the project are based on the nature and scale of the enterprise and the project in charge of the decision, if only in the local enterprise engaged in only the local cost industry, is not required to travel, on the contrary, if there is often business in the field or the enterprise flow project scope, then it is necessary to travel frequently; Those engaged in project cost need to often contact the construction site, understand the construction process of the site and verify the deviation of the budget and construction at any time, and collect relevant settlement information and image data, so it is necessary to be at the construction site frequently.

  2. Anonymous users2024-02-12

    You don't need to travel often, but if you are a boy, you may arrange to go down to the construction site, but if you want to go back to the cost of the project, it is impossible not to go to the construction site, I am a real estate company to make a budget, and I often have to look at the Harbin site, in order to do a good job of budgeting, do not do it out of thin air, if you can't bear the hardship, it is recommended that you do not study engineering!

  3. Anonymous users2024-02-11

    Look at what unit. There are not many opportunities for business trips, and it is necessary to go to the construction site in the supervision or construction unit, and the belt is not frequent, even if it goes down, it is also a walk.

  4. Anonymous users2024-02-10

    The major you learn has little to do with whether you can get off the construction site in the future, depending on what unit you are looking for in the future, the unit will let you go down, and the unit and the unit are different, but if you don't want to go down the construction site, don't do the cost, there is no practice and there is no right to speak (*** teach us to say).

  5. Anonymous users2024-02-09

    The work of engineering cost does not need to stay on the construction site all the time, and it may be necessary to travel all over the country as needed.

    Engineering cost major.

    After graduation, you can work in engineering (cost) consulting companies, construction enterprises (Party B), building decoration and decoration engineering companies, engineering construction supervision companies, real estate development enterprises, design institutes, accounting and auditing firms, and first-class department enterprises and institutions.

    Infrastructure Sector (Party A.

    and other enterprises and institutions.

    Engaged in project cost bidding**.

    Investment and financing of construction projects and investment control, determination and control of project cost, bidding decision-making, contract management, project budget (settlement) and final accounts, and project cost analysis.

    Engineering consulting, engineering supervision, and the development and application of software related to engineering cost management and technical support.

    Project cost work content:

    If in the construction unit, the project cost management includes the preparation of budget documents, the preparation of bidding documents, the signing of contracts, and the participation in the review of drawings.

    Preparation of material plans, etc. Responsible for the preparation and management of claim visas and intermediate progress settlement documents, the preparation of various economic visa documents, participation in the drawing of as-built drawings, and the preparation of as-built settlement documents.

    According to the authorization of the entrusting unit and the contract of Party A and Party B, including the review of the claim visa, the intermediate progress settlement documents, and the issuance of the settlement report. It also includes various economic visa review, completion settlement document review, and issuance of settlement report.

  6. Anonymous users2024-02-08

    No, you don't. Although engineering cost is a civil engineering major, not all civil engineering majors must be resident on the construction site.

    The good fortune of the project cost:

    1. Large-scale, any construction project is not only large-scale, but also consumes huge resources, ranging from millions of yuan to hundreds of millions of yuan. The huge cost of the project involves many aspects of major economic benefits, and on the other hand, it also makes the project bear significant economic risks, which has a significant impact on the macroeconomic operation.

    2. Individuality, any project has its specific purpose, function and scale, which leads to different requirements for the structure, shape and interior and exterior decoration of each project, which is directly reflected in the difference in project cost.

    3. Dynamic, from decision-making to project completion and acceptance, and then to project delivery, the construction period is long. In addition, due to the influence of many uncontrollable factors of social and natural factors, the project cost will inevitably change.

    4. Hierarchical, a construction project usually contains multiple separate projects, which can play an independent role in design and production efficiency. A single project is composed of unit projects that are independently organized and each gives full play to its professional effectiveness. <>

  7. Anonymous users2024-02-07

    It is not necessary to be on the construction site all the time, such as the consulting company's engineering construction and price management personnel do not need to be on the construction site all the time.

  8. Anonymous users2024-02-06

    The cost of the project does not need to stay on the construction site all the time, but it is necessary to go to the construction site at any time to check the construction practices of each process, and connect the connection between each other, which is conducive to doing more accurately.

  9. Anonymous users2024-02-05

    The cost of the project needs to be on the construction site.

    First, the purpose of going to the construction site:

    1. Because many things on the construction site cannot be reflected in the drawings, otherwise there will not be so many on-site visas and changes.

    2. Going to the construction site can help beginners master the knowledge and skills of construction and cost faster and better. When you have been engaged in cost work for a period of time, you don't need to go to the site often, just look at the places or time periods that you don't understand.

    3. Have a better understanding of engineering construction methods, procedures, means, measures, materials, management, etc. Because there are many contradictions in the design and construction of drawings, that is, the actual construction needs to increase the amount of work, so having on-site experience will be helpful to the work.

    2. Occupation requirements:

    It is necessary to have a college degree or above in industrial and civil engineering, civil engineering, construction economic management, engineering cost, construction engineering, budget, etc. A qualified project estimator needs to understand the general construction procedures, construction methods, project quality and safety standards; Familiar with the basic knowledge of architectural drawing, building structure and house construction.

    Understand common building materials, components, products and common machinery and equipment; Familiar with the composition of various quotas, labor costs, material budgets** and mechanical shift fees and fee collection standards; Familiar with the rules of quantity calculation and master the calculation skills; Understand the construction economic regulations, be familiar with the provisions of the engineering contract, and be able to participate in bidding, bidding and contract negotiation.

    Project cost regulation function and employment direction:

    1. Regulatory functions:

    The state's macroeconomic regulation and control of the scale and structure of construction is indispensable under any conditions, and it is also necessary to directly regulate and manage the first-class investment projects. All of these should be used as an economic lever to regulate and manage the level of material consumption, the scale of construction, and the direction of investment in the construction of the project.

    Second, the direction of employment:

    After graduation, students can be engaged in engineering cost bidding, construction project investment and financing and investment control in engineering consulting companies, construction enterprises (Party B), building decoration and decoration engineering companies, engineering construction supervision companies, real estate development enterprises, design institutes, accounting and auditing firms, infrastructure departments of enterprises and institutions (Party A) and other enterprises and institutions. Yard height.

  10. Anonymous users2024-02-04

    The cost of the project does not necessarily need to be dismantled, which should be decided according to the unit; But to do the cost, you must need to go to the construction site often.

    Engaged in the cost of the project are based on the nature and scale of the enterprise and the project in charge of the decision, if only in the local enterprise is engaged in only the local travel cost industry, there is no need to travel, on the contrary, if there is often business in the field or the enterprise flow project range, then it is necessary to travel frequently; Those engaged in project cost need to often contact the construction site, understand the construction process of the site and verify the deviation of the budget and construction at any time, and collect relevant settlement information and image data, so it is necessary to be at the construction site frequently.

Related questions
6 answers2024-07-21

I have worked for nearly 10 years, and now I am a first-class constructor, let me talk about the difference between several majors, don't listen to the teachers in the school, many of what they say are theoretical and unrealistic. >>>More

11 answers2024-07-21

Project Cost School Details:

The universities that offer engineering cost majors in the country include Yancheng Preschool Normal College, Beijing Industrial Vocational and Technical College, Beijing Jingbei Vocational and Technical College, Beijing Transportation Vocational and Technical College, Beijing Finance and Trade Vocational College, Beijing Vocational College of Science and Technology, Beijing Peili Vocational College, and Beijing Vocational College of Economics and Management >>>More

8 answers2024-07-21

Yes. 1. Grade A has been engaged in engineering consulting business for no less than 5 years, and the corresponding consulting results of the professional service scope are not less than 5, and there is no bad record; Grade B has been engaged in engineering consulting business for no less than 3 years, and the corresponding consulting results of the service scope of the applied professional are not less than 5, and there is no bad record; There is no requirement for Class C. >>>More

13 answers2024-07-21

The engineering cost major belongs to the management category. The engineering cost major cultivates professional knowledge of engineering cost valuation, bidding, contract management, cost accounting and construction project management, and has job skills in the professional field of engineering cost. >>>More

9 answers2024-07-21

The first problem, mainly to see the requirements of the bidding documents, and then also need to have a certain applicable operation ability, can not see the wrong drawings, set the wrong quota, the calculation of the quantity of engineering needs to be very accurate, the timely update and grasp of various cost supporting documents is also very important, the use of software must also be mastered, so as to control the cost. >>>More