-
If you do have paid for a house, but now regret that the bedroom is too small, then re-list the house you have now** and buy another one that suits you.
-
No way, Chengdu's new regulations are to get the property right certificate 3 years before you can ** (other places are not clear), buy a new house is basically off-plan, and it takes 1-3 years to hand over the house (except for the existing house in some lots), and it takes 1-2 years to get the property right certificate after delivery, so even if you buy an existing house, then it takes 1-2 years to get the property right certificate, and it takes 3 years to **, so it takes 5 years to sell it at the earliest.
-
After buying a house. Master bedroom. What should I do if I buy a small one? You can take a look at the structure of the room. You can also make it bigger. If you really can't change it, you can consider changing it again. Sell this one, and then replace it with one that suits your heart. House.
-
If you regret that the master bedroom is too small when you buy a house, you can remove the bathroom in the master bedroom and expand the space in the master bedroom.
-
There are options, you can sell it and buy it again, or find a renovation company, tell them what you think, and they will design a plan according to your ideas, which will definitely make your room bigger.
-
See if there is any space that can be used, such as cloakrooms, bathrooms, etc., and it is possible to change it.
-
The bathroom in the master bedroom can be removed. Then enlarge the front of the master bedroom.
-
I will live there, and I can't buy it again.
-
You can change it to increase the size of the bedroom.
-
There's no way, it's already great to be able to buy a house, and I'll work hard for a few years before getting a new one.
-
Thanks for the advice, but I guess I'll take it since I bought it, right, if you feel depressed and unhappy every day when you come home, it won't help, right? And you just did too.
-
What to do if you regret buying a house, what to do with the deposit, don't worry about making friends, and then use this method, no longer have to worry about the deposit, decades of professionalism, to provide you with a down payment, a deposit refund plan, what to do if you regret buying a house.
-
The house next door, downstairs or upstairs was also bought, and the two sets were directly opened up and used as one household.
Or sell this set and buy another big one.
-
It is impossible to check out, only to rent it out first or sell it after getting the real estate deed.
-
That 18th floor 1801 is not good, the room size is small and I don't want to buy, and the down payment is paid in installments. How can I get the capital and the deposit back. Money.
-
Living, renting, selling, and repaying loans, you can use your own convenience.
-
Sell it, don't live it, rent it out. What else can I do.
-
You can rent it out, and you can make money.
-
It can be sold to an acquaintance, and then the acquaintance can repay the loan regularly.
-
Good design, decoration, and careful decoration will be better than a big house
-
Take out a loan to buy a house, or you can sell the house. After signing the contract with the buyer, you can ask the buyer to pay you for the house first, and you can use the house payment to settle the loan in one lump sum, and you can get the real estate certificate after the mortgage is withdrawn. Then you go to the trade transfer.
-
In general, the circumstances under which buyers can move out mainly include the following:
1. Deferred delivery of housing. After the delivery date agreed in the contract between the developer and the buyer, the developer has not been notified of occupancy for a long time. According to the current Judicial Interpretation, if the developer fails to perform the property within a reasonable period of three months after being urged by the buyer, the buyer has the right to request the developer to move out of the property and request the return of the deposit or the payment of interest on the house price.
2. The contract is invalid. The reason for the invalidity of the contract is mostly due to the incomplete procedures of the developer, and the developer must have complete documents before building and selling the house. If the developer's documents are incomplete, it is an illegal operation, and the contract signed with the buyer is invalid.
Since it is an invalid contract, the developer shall return the payment paid by the buyer.
3. The developer changes the design without the consent of the buyer. In the contract signed between the buyer and the developer, it is generally stipulated that the developer must obtain the consent of the buyer before changing the design. Otherwise, the developer is in breach of contract and the buyer has the right to move out.
In the event that the developer changes the design of the house without the consent of the buyer, the buyer may request the developer to move out in accordance with the contract.
Fourth, the error of the house area is more than 3%. If the absolute value of the error ratio between the measured area of the house at the time of delivery and the tentative area at the time of signing the contract exceeds 3%, the buyer can propose to move out and request a refund of interest.
Fifth, the quality of the house is unqualified and affects the use. According to the latest judicial interpretation, if the quality of the house affects the normal residential use, the buyer can propose to move out and request the developer to compensate for the loss. If the quality of the main structure is unqualified, it can be entrusted to the engineering quality inspection agency to re-verify in accordance with the relevant regulations.
Sixth, the property rights of the house are not clear. If there is a mortgage, seizure or other economic dispute.
7. There are other problems such as contract fraud. The developer mortgages the house sold before the first house, or mortgages the house to others after selling it to the buyer, and the buyer can sue to determine that the purchase contract is invalid and require to move out. In addition, it is common for the developer to invalidate the purchase contract if the developer has not obtained a pre-sale permitThe house is common property without the written consent of the other co-owners;The ownership of the house is disputed, and the judicial or administrative organs rule or decide to seal it up or otherwise restrict the rights of the house in accordance with the law.
8. Delay in the registration of house ownership. More than one year after the expiration of the registration of house ownership that shall be handled according to the agreement of the sales contract or the law, the registration of house ownership cannot be handled due to the reasons of the developer.
9. The mortgage contract cannot be handled. Failure to conclude a mortgage contract due to reasons not attributable to both parties and the failure to apply for a mortgage loan.
10. Transfer of projects under construction. If the developer wants to transfer the construction in progress, it shall notify the purchaser in writing, and the purchaser has the right to request to move out within 30 days from the date of receipt of the notice.
Friend and child slept in the master bedroom, no problem, no impact on the owner. Just wash the sheets and covers, and do a good job of hygiene.
Then choose the bed in the bedroom according to your actual situation. Generally 1 3 of the bedroom area is the most reasonable. If you are taller, you can increase the length of the bed appropriately. >>>More
Wrap your little feet? The conditions allow to change. If it's about the same, wear it more, and it will be naturally loose after a long time. No matter how bad it is, you can give it away.
During the New Year's Day, I happened to find that the radiator at home also had this problem of the first half being hot and the lower half being cold. The cause of the problem: The heating water pressure set in the wall-hung boiler is not enough, and it is said that it should be set to the left and right. >>>More
You can choose to surrender the policy, but you will need to bear a certain amountLiability for breach of contractAt the same time, your principal will be lost to varying degrees. >>>More