You need to make a keel around the water heater, and each side needs to make a 38 main bone, and then cut half of the buckle plate with a triangular bone, and then fix it on the 38 main bone with a hanging piece, that is, to solve the skeleton problem around the water heater, the skeleton is solved, and the edge strip is directly locked, and the gap can be treated with glass glue.
You are wrong, the edge is decorative, not load-bearing, if the edge is load-bearing, this ceiling must have a problem. It needs to be done, even if the edge glue fails, the ceiling is still the same, after all, the glue life is short.
-
1. Prepare in advance.
When installing the corners of the integrated ceiling, it is important to prepare the time, what materials are needed and what tools are ready before starting construction. For example, we use glass adhesive corner strips, hole punches and so on. Auxiliary tools such as drag strips are also used.
Before starting construction, the required materials and tools are prepared in order.
Second, start construction.
At the beginning of the construction, you should first draw a few numbers in the hole of the edge line, the distance between the holes and the holes is about 10-15 cm, to ensure that the spacing between each hole is the same, and then use an electric hammer to hit the hole of about 4 mm, the hole is not too large, and the diameter of each hole should be equal. You should pay attention to the fact that when punching holes, you should first draw a cross, and then start punching with the center of the cross as the center point.
3. Start the installation and fixation.
After the hole is made, the expansion tube can be driven into the mouth. It should be noted that the expansion pipe should not be inserted beyond the installation deck, and the ends of each corner line should be cut into half of the corner. Then align the upper mouth of this side of the foot.
Fourth, finally fix and protect with glass glue.
After all the work is over, the glass glue should be marked on the edge strip, on the one hand, it is to play a protective role, on the other hand, it is also to play a fixed role, and the glass glue must be played more evenly. This not only looks good, but also increases the protective effect and stickiness of the glass glue.
Fifth, it is best to have a professional master to operate.
Although it is not a difficult job to fix the edge strip of the integrated ceiling, but there are certain requirements for the operator, because the edge strip of the integrated ceiling is fixed when the technical requirements are relatively high, so this kind of work is generally operated by professional masters outside, and they have sufficient experience in this regard. There will be no mistakes. If you are a novice in this field, I recommend that you must observe the master's operation steps more, and practice more yourself, so that proficiency makes perfect.
-
1.After measuring the size, the worker begins to cut off the edge strips.
2.Workers punch holes in the wall tiles, make holes and then nail the wooden plugs for the installation of edge strips, which is also a test of whether the wall tiles are paved firmly.
3.Once the cork is in place, nail the trim strip to the wall.
4.Pay special attention to the edge strip splicing at the corners of the wall.
5.After the edge strip is done, the main keel hanger will be installed.
6.After the main keel is installed, the triangular auxiliary keel is installed.
7.Due to the impact of the house beams, the installation of the triangular keel must be smashed off the excess 8After the main frame is ready, the module is installed.
-
Generally, the water heater is installed first and then the ceiling is suspended.
-
Clamp the plate and the edge with the triangular keel, the edge of the corner can be folded at a right angle with the cut slat, and then clamped in the keel of the two sides as a right-angle fixation, and the triangular bone fixed by the fixed edge line is on the main keel
-
The construction master will help you get it done, this is his job.
-
Dear, there are professional card slots, and there are some in the market to buy.
-
1. Measure the size and start to cut off the edge strips.
2. Punch holes in the wall tiles, make holes and nail the wooden cork for the installation of edge strips! This is also a test of whether the wall tiles are paved solidly.
3. After the cork is installed, nail the edge strip on the wall, especially pay attention to the edge strip splicing at the corner of the wall, so as not to cause gaps and affect the appearance.
4. After the edge strip is done, start to install the main keel hanger.
5. After the main keel is installed, the triangular auxiliary keel is installed. If the plate lower beam affects the installation of the triangular keel, the excess must be smashed.
6. After the main frame is completed, the module is installed, and each process needs to be very careful to ensure that the module is installed without gaps.
The water heater is semi-discreet and requires very precise measurements and tailoring to ensure a tight and secure installation!
-
Yang corner edge sealing, the professional master will deal with it.
-
Summary. You're wrong, the edges are decorative. You need to do it around the water heater to do keel edge strips directly with the side buckle to fix on the gusset plate, the ceiling is still the same, each side needs to do a 38 main bone, and then cut half of the gusset plate with a triangular bone to stuck, and then use a hanging piece to fix the 38 main bone, that is, to solve the skeleton problem around the water heater, the skeleton is solved, the edge strip is directly locked, and the gap can be treated with glass glue.
Hello, it is a pleasure to serve you, looking for information for you, please wait a minute.
That is, to solve the skeleton problem around the water heater, and then cut half of the gusset plate with a triangular bone to stuck, the skeleton is specially solved, with glass glue to deal with the lower seam gap, and then with a hanging piece to fix it to the main bone of the round 38 debate, after all, the glue life is short, if the edge strip is load-bearing, even if the edge strip glue fails, the edge strip is directly locked after the buckle.
You're wrong, the edges are decorative. Need to do, can, not load-bearing, this ceiling is bound to have problems, you need to do keel edge strips around the water heater directly with the side buckle fixed on the gusset plate, the ceiling is still the same, each side needs to do a 38 main bone, and then cut half of the buckle plate with a triangular bone jam, and then shout Chong with a hanging piece fixed to the 38 main bone, that is, to solve the problem of the search skeleton around the water heater, Zheng leak to destroy the skeleton solved, after the edge strip is directly locked, use glass glue to treat the next gap.
The edge is decorative, not load-bearing, if the edge is load-bearing, the ceiling is bound to have problems. It needs to be done, knowing that even if the edge glue fails, the ceiling is still the same, and the sail can be empty, after all, the glue has a short burning limit.
It is good to put the water heater half wrapped in the ceiling, because the height of the bathroom ceiling is not particularly high, so the water heater half in it will soften the whole space.
Whoever buys it is unlucky, half a year called five after-sales, I don't believe you try, there is a time when you cry, just now the water heater is broken again, and the after-sales service is also mixed and waiting for death, procrastinating.
The ordinary installation method is to put it in the ceiling, so that it is more convenient to observe the amount of water in the water heater, and the water temperature can be adjusted at will.
Hello, install the gas water heater first, and then install the ceiling. >>>More
1. The frequency of use determines the power outage >>>More