How long is the renovation cycle?

Updated on healthy 2024-07-04
16 answers
  1. Anonymous users2024-02-12

    The normal decoration time of a three-bedroom room of about 100 square meters is 2-3 months, and the decoration cycle we say generally refers to the completion of hard decoration, which is divided into layout transformation, hydropower construction, waterproof treatment, tile paving, carpentry ceiling, window cover, door cover, painter scraping putty, painting or wallpaper, wooden door installation, wooden floor paving, bathroom lamps and curtains installation, land reclamation and cleaning.

    1.The design scheme is determined to the approach.

    It takes about 3-5 days from the design plan to the time of entering the site, because after the plan is determined, the decoration company needs to issue specific construction drawings, prepare construction materials, and arrange construction personnel, and also choose a good day to start construction.

    2.Layout renovation 3-7 days.

    Usually the house type is not very good, and the designer has carried out a layout function remodeling, demolishing the wall, mending the wall, etc., which can generally be completed in 3-7 days, and the garbage is completed after cleaning.

    3.Hydropower renovation and waterproofing 5-6 days

    In the case of hydropower projects, plumbers and electricians construct at the same time, the wall is slotted, the underground is directly paved, and the 100-square-meter house can be renovated in 3 days of water and electricity. After changing the water and electricity, you can do the waterproofing of the bathroom, kitchen, and balcony, generally brush twice, and it can be completed in 2 days, and the waterproof can be pasted with tiles.

    4.Tile paving, ground leveling 6-10 days.

    If the whole house is paved with tiles, it can be pasted in about 7 days, and it can not be used for 3 days, that is, it takes 10 days for the tiles to be fully completed; If you lay a wooden floor, you need to level it, and you can level it in 3 days, but you can't enter the field for 3 days, and it takes about 6 days to level it.

    5.Carpentry for 10-20 days

    Carpentry into the field for ceilings, door covers, window covers, about 10 days, if the door sets and window sets use the oil mixing process will reach about 15 days. Now the whole house customization is popular, and the installation cycle is about 4 days if the wardrobe factory is done, and it takes 1 week for the whole house panel furniture to be done by the carpenter himself.

    6.Painter 10-15 days

    The painter first needs to scrape the putty twice in the whole house, which takes 4 days, then polish it for 2 days, and wait 3-5 days halfway through, and the putty needs to dry thoroughly. After sanding, start painting, and it takes 2 days to paint on both sides.

    7.Wooden floor installation, wooden door installation 3-4 days.

    The wooden floor needs to be cleaned before installation, and the wooden floor of the whole house generally takes 2-3 days, and the wooden door can be installed in one day.

    8.Bathroom, lamps, curtains, and cleaning for 2 days.

    Bathrooms, lamps, and curtains can be constructed at the same time, which is enough time to be completed in one day, and cleaning can be completed in one day.

  2. Anonymous users2024-02-11

    Generally, home improvement takes about 3 months to 6 months. If you find a decoration company to install, then the time will be shorter, and it will take longer to find someone to install it yourself.

  3. Anonymous users2024-02-10

    This depends on the area and decoration requirements, such as 200 square meters of flat-floor room, under the premise of scientific and efficient overall management, the decoration period is about 35 days.

  4. Anonymous users2024-02-09

    It is generally a month's time, and you can make the interior decoration particularly beautiful, and there will be no negligent links.

  5. Anonymous users2024-02-08

    Many people will consider the renovation time before decorating the house, how much time does the decoration generally take? Today, I will answer them for you one by one.

    In fact, there is no fixed answer to how long it takes to renovate a house, because the length of renovation is related to many factors, such as the size of the house, the number of workers, etc. Under normal circumstances, the normal decoration of about 100 square meters has a construction period of 40-60 days, and the specific details are determined according to the on-site decoration project and engineering quantity.

    1. First of all, hydropower and bricklayers, it takes 20 25 days, of which 1 2 days for demolition and renovation projects, 4 10 days for hydropower projects, 3 7 days for waterproof projects, about 10 days for bricklayers, and 1 day for the acceptance of concealed projects;

    2. At the same time, the carpenter needs 15 to 20 days for the wood production of the frame, and it takes 5 to 10 days for the finish and closing;

    3. After that, it takes 10 to 15 days for the oilman to enter the site, including wood for primer, wood for topcoat, wall scraping putty and latex paint;

    4. It takes 4 to 6 days to install wooden doors, floors, cabinets, switches, sockets, lamps, sanitary ware and hardware at the end.

  6. Anonymous users2024-02-07

    How long does it take to renovate? Decoration can be slow or fast, mainly depending on how big your room is and what materials are used to decorate? How many people will be used for construction? Knowing this is the only way to judge the length of time.

  7. Anonymous users2024-02-06

    The fastest will take 3 months, which refers to the general size of about 100 square meters of flat floors, but it is not recommended to install fast, and many faster installations will be omitted.

  8. Anonymous users2024-02-05

    Under normal circumstances, the normal decoration of about 100 square meters has a construction period of 40-60 days, and the details should be related to the on-site decoration project and engineering quantity.

  9. Anonymous users2024-02-04

    3 months 4 months, generally please decoration company.

    To decorate, it will take 3 to 4 months. If it's yourself.

    Find someone to pretend to be within three months.

  10. Anonymous users2024-02-03

    My home is being renovated, and the decoration company signed a 40-day contract, because the community is not allowed to start construction on holidays, and it will be completed in 50 days. The house is 140 square meters.

  11. Anonymous users2024-02-02

    How long does it take to renovate? The renovation time of the house is determined according to the decoration standard (80-100 square meters).

    If it is just a simple renovation, it only takes 18-22 days to complete it.

    If you want a normal renovation, it generally takes 28-32 days.

    If it is a low-end fine decoration, it generally takes 55-65 days to complete.

    If you want to decorate in a high-end or luxurious way, it will take 80-90 days.

    FYI...

  12. Anonymous users2024-02-01

    Hello landlord: The general decoration company stipulates that the time is 45 days, and all of them are completed, which is theoretically possible! However, if there are additions or decreases in the construction process, the construction period will be appropriately postponed!! It depends on your contract, and this thing will be done soon.

  13. Anonymous users2024-01-31

    The length of the renovation cycle varies depending on the specific situation, and generally speaking, it needs to be determined according to factors such as the size of the house, the decoration style, the difficulty of construction, the strength of the decoration company and human resources. Under normal circumstances, the renovation period takes about 1 month to half a year from signing the contract to completion.

    The steps of Liang Heyu in decoration include the following aspects:

    1.Planning and design: According to the needs of the owners and the actual situation of the house, determine the decoration plan, carry out space planning and design scheme, including style, material, color, etc.

    2.Budget**: After the design plan is confirmed, the designer will make a detailed decoration budget list and give the decoration**.

    3.Sign the contract: sign the decoration contract to clarify the scope of the decoration project, the construction period, the cost, the quality standard, the guarantee and other issues.

    4.Engineering construction: determine the construction team, start construction, including hydropower engineering, masonry, carpentry, painting, etc., and complete the construction task according to the time node listed in the contract.

    5.Acceptance and acceptance: After the decoration construction is completed, the owner and the decoration company will carry out the project acceptance and check whether the project meets the contract requirements.

    The above is the general steps on decoration of Hangzhou Gongxiaojiang decoration design, and the specific process may be different for different decoration projects and individual needs.

  14. Anonymous users2024-01-30

    Decoration is also known as decoration or decoration. It refers to a set of construction plans and design plans that are carried out in a certain area and scope, including hydropower construction, walls, floors, ceilings, landscapes, etc., and are formed according to certain design concepts and aesthetic rules.

    From the placement of furniture and the orientation of the door, to the customization of room accessories and lamps, it is the embodiment of decoration.

    The decoration cycle is uncertain, because the room type of each household is different, and the decoration style is also different, so the decoration cycle will be different. Lead Chajang.

    Decoration methods include:

    Whole house assembly, full package, half package (light industrial accessories), clear package.

    Decoration steps: pre-demolition and main body renovation - hydropower renovation - carpentry part - masonry part - finishing project (paint part) - lighting project - cleaning - completion acceptance.

  15. Anonymous users2024-01-29

    The renovation cycle varies depending on factors such as the size of the house, the style of decoration and the choice of materials, but generally speaking, a 90-square-meter house, if it is fully renovated, will take about 2-3 months. This cycle includes design, demolition, water and electricity renovation, masonry, carpentry, painting, furniture installation and other steps.

    If you want to know the specific decoration, you can use the "decoration artifact" to calculate, as long as the bureau does not enter the area + city, immediately calculate the local decoration**, list the details of 102 decorations, so that you can not worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].

    First of all, the design phase takes about 1-2 weeks, including the designer's preliminary measurements, the formulation and modification of the design plan, and the finalization of the plan. Next is the demolition stage, this stage is mainly to demolish the original decoration, including walls, floors, ceilings, etc., generally takes 1 week to shout left and right.

    The hydropower renovation stage is a very important step in the decoration, this stage is mainly to transform the water and electricity lines of the house to adapt to the new decoration scheme, which generally takes 1-2 weeks. Next is the masonry stage, which is mainly to plaster the walls and floors, which generally takes about 2 weeks.

    The carpentry stage is mainly to make and install wood products, such as doors, windows, cabinets, wardrobes, etc., which generally takes 2-3 weeks. The painting phase is mainly to paint the walls, ceilings and wood products, which generally takes 1-2 weeks. Finally, there is the installation of furniture stage, which is mainly the installation of furniture and electrical appliances, which generally takes about 1 week.

    In terms of **, generally speaking, the cost of a 90-square-meter house is between 100,000-200,000 yuan, and the specific ** varies due to the different material choices and decoration styles.

    In the decoration process, it is recommended that the owner try to choose an experienced designer and construction team, and at the same time pay attention to quality in the selection of materials to avoid problems in the later stage of decoration due to quality problems. At the same time, the owner should also do a good job of supervising the work to ensure the progress and quality of the decoration.

    Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget, want to find a good company, learn more about decoration knowledge on Tuba Rabbit, click here, free 1 to 1 for your home decoration services: [Tuba Rabbit ** official website].

  16. Anonymous users2024-01-28

    If the structure of the house has an unscientific position and must be demolished, it must be the first step in decoration. Since all the decoration is realized on the frame of the house, it can only be decorated when the frame is set. When creating a new wall, you must remember to build a steel bar, move the net, and reduce the safety hazards of cracking in the middle and late stages.

    In the case of machinery and equipment, it is necessary to plan the parts well to reduce the potential safety hazards of moving the parts in the middle and late stages, and also fully consider the relationship factors such as whether the furniture is harmful behind the machinery and equipment.

    If there are many machines and equipment in the home, I suggest that it is best to find an interior designer, otherwise the intricate interaction will not be controlled by the general community owner. Wall modification 2-4 days, talk to the master who does the work, generally 2-4 days can be solved, they are technical professionals to do this, including living balcony insulation, embedded baseboarding, smashing the wall, shovel the top, wall and other new projects, some do not will save time and effort, but 4 days must be no problem. Keep in mind that:

    Be sure to communicate with the property management company before modifying the wall to prevent your decoration deposit from being deducted eventually.

    Decoration of water and electricity renovation about 3 to 4 days, a normal suite, decoration of water and electricity transformation cycle time is short, mainly because the time is long staff can not come, generally the first thing to do is the socket switch ground leveling, construction and pay-off, this 1 morning was completed. Groove, this is mainly to look at the wall, there are some big real estate companies to build a house, the vast majority of the wall is full of concrete, it is very inconvenient to open down, it will consume a little time, two people 2 days is definitely no problem. There is also a 2-day solution to the pipe and construction line, and the waterway can be cross-dried, and there is no problem in one day.

    Subsequent hydrostatic test, in general, does not exceed 5 days. If there are many gaps in the wall, it is highly recommended to hang the wall label, which can avoid large-scale cracking of the wall, and the wall is normal, so the corresponding auxiliary materials should be used, putty powder, and others are not recommended, mainly because they are afraid that the putty powder wall at the top of the wall in the middle and late stages will be hollow and fall down. If the wall can't dry, don't rush to urge the construction period, otherwise you will scrape the putty, and the wall will be wet and cold for a long time, which may make the putty powder alkaline, so it will be troublesome.

    Before batching putty, the yang angle line must be used, which can effectively level the yang angle line at the top of the wall on the ground.

Related questions
16 answers2024-07-04

If it is a broiler, it can be raised several batches a year, and it can be slaughtered in more than 40 days. For laying hens, it is generally a cycle of 500 days. >>>More

9 answers2024-07-04

Hotel decoration customers on the construction period requirements are generally tight, because the rent of the store began to pay rent, a few days in advance is to help customers save budget, some sales season can not be missed, according to the actual situation of each project, as short as 20 days, long more than 3 months, which has a lot of influencing factors, briefly described as follows: >>>More

11 answers2024-07-04

It only takes an hour or two.

Car waxing, as a traditional project of car beauty, the role of waxing is first of all waterproof, acid rainproof, due to the protection of car wax, will reduce the amount of water droplets attached to the body, the effect is very obvious, can reach 50% to 90%; The second is to prevent high temperature and ultraviolet rays, the weather is getting hotter and hotter, and the car is easy to cause the aging and fading of the paint due to light when driving or storing it all year round, and the film formed by waxing can reflect part of the light, effectively avoiding the aging of the car paint. >>>More

7 answers2024-07-04

PLC is a kind of intelligent controller, which is a computer (PC).PLC is a programmable controller. PLC is a programmable controller >>>More

2 answers2024-07-04

Article 19 Where the term of a labor contract is more than three months but less than one year, the probationary period shall not exceed one month; If the term of the labor contract is more than one year but less than three years, the probationary period shall not exceed two months; For fixed-term and indefinite-term labor contracts of more than three years, the probationary period shall not exceed six months. >>>More