-
1.Hydropower renovation is the most important project in the home, and it is also the most secret project. If something goes wrong with these projects later on, it's hard to fix.
Therefore, in the process of transformation, the hydropower transformation project must be done well. When the package is cleaned and decorated, the process of hydropower construction personnel must be supervised, and the project must be strictly accepted. In addition to the sewer pipe, if the electrician does not follow the construction requirements when installing sockets, switches, and lamps, it will not only cause electrical accidents, but also cause short circuits when using high-power household appliances such as water heaters, air conditioners, and refrigerators, and even burn the switches and sockets, which will have a certain impact on the safety of household electricity.
Latex paint is currently the most commonly used wall decoration material.
2.In the construction process, there are methods such as brushing, roller coating and spraying. If workers are perfunctory during construction, color differences often occur, especially for dark latex paints.
The wires are basically installed through pipes, which is to prevent the wires from being corroded and short-circuited. The owner could not see the effect of the construction crew's penetration. If workers deliberately cut corners, use wires with joints in the pipe, or place multiple wires in the same pipe, it will affect the safety of electricity in the future.
Although the laying of floor tiles may seem simple, it is actually a meticulous work.
3.If workers cut corners on cement mortar, hollowing and butting will most likely not occur. Later use can easily cause the tiles to fall off.
Wall slotting requires very fine construction technology, and barbaric construction will destroy the integrity of the wall, especially some construction teams, regardless of the function of the wall, directly groove on the load-bearing wall to cause the force balance to be destroyed, and shorten the service life of the building. The adhesive slurry used between the tile and the substrate should be prepared in strict accordance with the construction standards and proportions. Cement and adhesive materials of the specified grade should be used and cannot be prepared arbitrarily.
Buried pipes must be grooved in the walls and above ground before they can be buried.
4.A small number of workers were brutally working during the grooving operation, which not only damaged the load-bearing structure of the building, but also could cause damage to other pipelines in the vicinity. Before construction, reconfirm the direction and location of the pipeline with the construction team leader.
Different wall structures have different requirements for slotting. The load-bearing wall of the house is not allowed to be slotted, and the surface of the wall with insulation layer is easy to crack after slotting, and the ground slotting should pay more attention not to damage the floor and bring trouble to the residents downstairs.
-
In concealed projects, such as waterproofing, there are many traps in hydropower renovation, giving you some inferior materials, and the road to the sewer pipe will also be blocked. Wire joints will also have certain traps, if the decoration is not improper, it will cause a short circuit in the circuit, and there is a wire through the pipe, be sure to use the more popular PVC pipe, the wall will also have a lot of traps, the wall must be treated with the base, must be leveled, must pay attention to the ground leveling, decoration materials must be strictly controlled.
-
That is, when the decoration will be more expensive, the cost of later maintenance is also very expensive, and the raw materials purchased when cleaning and repairing are of inferior quality, and there will be water leakage in the process of later use, which is not good for overall modification.
-
Hydropower renovation is prone to problems, pay more attention to the wall, painting and installation of tiles are prone to problems, but also pay attention to the problem of ground pavement leveling.
-
Clearing: also known as packing, it refers to a project contracting method in which the owner buys all the materials by himself and finds a decoration company or decoration team to construct the project. Due to the wide variety of materials and types, the difference is very large, some people are worried that others may profit from buying materials on behalf of others, so some decoration households use their own materials to buy materials, only contract the decoration form.
(1) Playability and control, choose your own materials, and be able to concentrate on your intentions.
2) According to the sales market, you can have a big visual grasp of the type, price and characteristics of the discharge.
3) Relatively speaking, the cost is relatively low, and the selection of materials is based on their own economic development ability.
(1) The contractor needs to pay more time and energy. Go to the sales market, master the market, and assemble materials, which requires a large amount of time; You also have to contact the car to haul the materials; The construction period will be relatively long.
2) Bao Qinggong needs to have a good grasp of the material, otherwise in the process of getting along with the material supplier, it is inevitable not to suffer a dumb loss.
3) Buying materials by yourself will also lead to new disputes with the decoration company.
Once the decoration process is in arrears, the interior decoration household immediately has to go to the material, if the material can not be in time according to the construction schedule, the construction period will be delayed, and it is very easy to produce contradictions; If there is a problem with the quality of interior decoration, it is difficult to tell what is wrong with the quality of the materials purchased, or what is the problem with the quality of construction.
All in all, it is likely to make you emaciated, and you also need to bear a certain amount of risk. Due to the fact that there are few areas where the bag can be played, and there is little water and oil, many decoration companies do not want to take over the project of the package. Because of the middleman, there is a dispute over the price of materials, and the relationship with the decoration company is unknown, and it is difficult to define the authority in case of problems.
-
Point 1: Be sure not to be too expensive, otherwise you will be deceived, point 2, you must pay attention to the fact that he often asks you to add something, don't promise point 3, the design of the kitchen should not be too exaggerated, otherwise you will lose money.
-
The budget is low and the budget is high.
When many owners negotiate with decoration companies, some black-hearted decoration companies will impress the hearts of owners with a lower budget, and then in the later decoration, often the owners are in a passive state. After the completion of the project, the cost will be much higher than the original ** list. Therefore, when signing the contract, the owner must see whether all the matters have been included in the contract.
-
First, strictly review the decoration budget (overcalculation of workload, multiple decoration projects, high material prices, and high labor costs) to achieve reasonable decoration. Second, don't ask for design, plan your own decoration, because the decoration designer is also a decoration company, and it will also set traps. Third, the decoration needs to be responsible for the whole package repair needs to pay attention to the entry materials, semi-finished products to meet the requirements of the decoration contract inspection (to avoid shoddy, old to new, reduce the grade) Fourth, the quality of the appearance of the decoration:
The horizontal lines and lines of the ceiling decoration need to be horizontal and vertical. Fifth, check whether the ground and wall tiles are hollow at any time. The performance of decoration is smooth, the seams, the seams, and the seams should be delicate to meet the standards of fine decoration.
-
1. Building materials: building materials mainly include the main materials and auxiliary materials for decoration, and the common materials are cement boards, mineral wool boards for ceilings, aluminum buckle boards and blockboards, etc. At the same time, there are also putty powder, paint and other wall decoration materials, as well as cabinets and bathroom facilities, etc.
2. Hardware: Hardware mainly includes curtain rods, slide rails, pliers, screwdrivers, electric pens, handles, adhesives, lead wires, locks, folding hinges, door stoppers, power sockets, wires, sinks, faucets, floor drains, switch panels and bathtubs, etc.
3. Electrical appliances: electrical appliances mainly include cooking utensils (gas stoves, biogas stoves and other stoves and range hoods, etc.), solar water heaters, ventilation fans, disinfection cabinets, refrigerators, televisions, air conditioners, vacuum cleaners, washing machines, garment steamers, etc.
4. Lamps and lanterns: Lamps and lanterns mainly include several commonly used lamps and lanterns: main lamps, spotlights, chandeliers, floor lamps, table lamps, wall lamps, cabinet lamps, front lamps and so on.
5. Fabric: Most of the fabric materials are curtains and tablecloths, and it is not excluded that some people will choose fabric or sofa covers with fabric on the sofa.
What are the decoration steps of the clearance package.
1. Preparation: Home decoration is a very complicated thing, and various preparations must be made in advance, such as what decoration style to use, what decoration materials to choose, whether the floor is paved or tiled, and the wall is painted with latex paint or wallpaper, etc. In addition, it is necessary to measure various sizes, calculate the amount of decoration materials used, and purchase various decoration materials according to the amount used during decoration.
2. Start construction: choose a good day to start work, plan the location of the socket, the direction of the power cord and water pipe, and mark the landlord who needs to be demolished.
3. Demolition and reconstruction: demolition and renovation include wall demolition, wall building, shoveling wall skin, dismantling heating, replacing plastic steel windows, etc., and the garbage generated by demolition and transformation is cleaned out in time to ensure indoor cleanliness and facilitate construction.
4. Water and electricity: determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc., and slotted wiring. At this time, it is best to find a cabinet manufacturer to measure and help you determine the transformation plan of power supply and waterway.
5. Wrap and destroy the riser: the smoke exhaust pipe in the kitchen and the sewer pipe in the bathroom need to wrap the riser, and it is recommended to use bricks to have better sound insulation.
6. Tiling: After installing the floor drain on the ground, you can start tiling. It is recommended to buy anti-decay and anti-odor functions for floor drains, and use special floor drains for washing machines or showers.
7. Paint: Any carpentry work, even if it is just to do the pass, must follow this step, sink the large core board to the bottom, hold the veneer of the wax veneer, and then paint it.
8. Wallpaper: Do not open the window for ventilation within 48 hours after the wallpaper is pasted, and let it dry slowly.
9. Socket panel: It is best to buy a socket with a switch function, especially in the kitchen, so that the rice cooker and microwave oven can be free from plugging and unplugging the power supply, and can be controlled with a switch.
10. Kitchen and bathroom ceiling and cabinet installation: install the water heater and bath bomb first, and after installation, the ceiling edge sealing can better half-pack the water heater.
-
Clearing is to clear the contract, that is, the owner buys all the materials by himself. It is a project contracting method to find a decoration company or a decoration team to construct the project, and the decoration company purchases some small consumables such as nails at most.
Due to the wide variety of materials and types, the difference is very large, some people are worried that others may profit from buying materials on behalf of others, so some home improvement owners use their own materials to buy materials, only contract the decoration form.
For the owner, the first thing is to have a large degree of self-control, choose their own materials, and fully reflect their own wishes; secondly, the cost is relatively low; Third, have an intuitive understanding of the type, quality and performance of materials. Ideally, this is the most cost-effective way to do it, but it is a lot of time for the owner. The risk of clearing the package is that customers may not be able to buy the cheapest goods, and they are often dumb and lose money if they are not familiar with the quality of the goods.
The rest of the renovation methods
Half package is a way between the clear package and the full package, the main materials are purchased by the owner himself, and the decoration company provides construction services and package accessories, these two things are the most difficult for non-professionals to do. Half a pack is relatively convenient, and the owner may control the bulk of the cost by purchasing the main materials with higher value by himself, and the variety is varied. And the lower value of the accessories, the owner is difficult to figure out, and it is more worry-free to purchase by the construction party.
As far as the current market is concerned, the main materials generally do not involve environmental protection factors, and it is precisely the accessories that involve environmental protection, that is, the part that the decoration company will help you buy, and it is also the place where the decoration company's profits are relatively high. In terms of accessories, due to the bulk purchase, part of the material manufacturer's profits are transferred to the decoration company, which is part of the profit of the decoration company. At the same time, the decoration company has a complete set of service guarantees, including after-the-fact maintenance, as well as marketing management costs and appropriate profits.
-
Many owners will choose a contractor when decorating, the so-called.
Clearer. It refers to the owners to buy decoration materials, and then contract out according to how much a square meter of construction area, this contract is not fixed, and the decoration company, decoration materials and varieties, construction difficulty and so on are closely related. Many owners feel that as long as there is no problem with the decoration materials, other problems should not be big, in fact, this is also a wrong concept, there are still many traps in the decoration package, if you are not clear, then follow to understand it!
What are the pitfalls of the decoration package cleaner?
1. There is a problem of color difference in latex paint.
Latex paint is the material of the decoration wall, some construction teams in order to perfunctory, there will be a problem of color difference in the sprayed latex paint, some darker latex paint is especially prone to this problem, although the town cavity is a package cleaning worker, but we also have to supervise to ensure the quality of decoration.
2. The sewer pipeline is blocked.
In order to save trouble, some workers will pour a large amount of sand, gravel or garbage into the sewer, which will seriously lead to the blockage of the sewer, resulting in poor drainage of the kitchen and bathroom, in order to avoid such problems, in addition to strictly supervising the decoration process, we also have to check whether the sewer is blocked during the acceptance, which is a point that must be paid attention to in the decoration package cleaning work.
3. The wire is not installed according to the construction drawing.
In order to cope with the work, some electricians will not be wired according to our construction requirements, so our supervision must be in place, especially some electrical appliances with large power, if they are not wired as required, it is very easy to burn the danger of Lu Song. In addition to supervision, we conduct relevant tests after the installation of all switches and sockets to observe whether there is heat or abnormality in each part.
4. The wall and floor tiles are not well paved.
Laying bricks is a job that pays attention to technology, if the construction party does not pay attention or the technology is not up to standard, it is very easy to have problems such as hollowing, uneven joints, in addition, if the ratio of cement and binder is unreasonable, there will be problems such as falling off. When we accept it, we must observe whether the wall and floor tiles are paved smoothly and firmly, whether there are hollow drums, and whether the joints are uniform.
A man wraps a girl, of course, he doesn't love him, just to take it out to have more face, if he really loves her, he will take into account her feelings and give her what she wants.
I'm against you convincing him, why do you insist on breaking them up? I like it to this extent because she has some kind of quality that can ** him. Don't underestimate love, people's feelings are not as simple as what a house, a car, and a family affair can stop.
Cleansing oneself, in complicated things, will not be complicated. >>>More
What you say, and what you do, is stupid and childish ... >>>More
There are two conditions that must be met for the water vapor in the sky to turn into rain and snow, one is that there must be a certain saturation of water vapor (mainly related to temperature), and the other is that there must be condensation nuclei. Therefore, artificial snowfall must first have clouds in the sky, and without clouds, it is like a clever woman who is difficult to cook without rice, and it cannot snow. Clouds that can snow, 0 or less"Cold clouds"。 >>>More