When carrying out interior decoration, we usually carry out the construction of the ceiling first, and then the tiling is laid. This sequence is mainly based on the convenience of construction and the consideration of the overall effect.
With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tuba Rabbit Big Platform Counts**].
No longer worry about the company's price increase, omission and price increase.
First of all, ceiling construction requires drilling holes on the wall and ground, fixing keels, installing ceiling panels and other processes, which will produce a lot of dust and waste. If the tiles are laid first, the dust and waste can cause scratches or contamination on the surface of the tiles, affecting the aesthetics of the tiles. In addition, if the ceiling construction is carried out after the tiles are laid, the tiles that have already been laid may be damaged due to the movement of the construction personnel and the use of tools.
Secondly, after the construction of the ceiling is completed, the style and color of the tile can be better selected and matched according to the shape and color of the ceiling, so that the overall decoration effect is more coordinated and unified.
In terms of ceilings, the market price of ceilings is usually between 100-300 yuan per square meter, and the specific ceiling will vary according to factors such as material, style and construction difficulty. The market price of ceramic tiles is between 30-200 yuan per square meter, and the specific ** will vary according to factors such as the brand, specification and quality of ceramic tiles.
Therefore, it is recommended that when carrying out interior decoration, the construction of the ceiling should be carried out first, and then the laying of tiles. This can not only protect the tiles and avoid being damaged or polluted during the construction process, but also can better select and match the tiles according to the effect of the ceiling, so that the overall decoration effect is more beautiful and coordinated.
-
The decoration must be tiled first, and then the ceiling. In order to be beautiful, the height of the tile must be higher than the height of the ceiling, so that the ceiling can conceal the tile mouth, so it must be tiled first and then suspended.
-
This depends on what space is in the home, such as the balcony, bathroom and kitchen, I recommend that the tile is pasted first, and then the ceiling is done, so that the aftermath work in the later stage is more convenient, and the decoration must be optimized to choose.
-
The decoration is to paste the tile first and then the ceiling, because the tile is permanent after pasting, and the ceiling needs to be repaired or renovated later, and there will be some lines or pipelines in the ceiling, which need to be opened during future maintenance.
-
Yes, this is a matter of interspersed work and processes, and the arrangements of each company are different, and it also involves whether the types of work are familiar and whether they cooperate tacitly. Let them arrange it themselves, nothing is wrong.
-
The best order is that after the bricklayer enters the site, the kitchen, bathroom, balcony wall bricks and bricks are good, and then the carpentry ceiling is carried out, and the paint construction is carried out after the carpentry is completed, but after the paint is completed for the first time, the bricklayer enters the site again to carry out the paving of the floor tiles, and after the completion of the floor tile paving, the special finished product protective film is used to protect the floor tiles in an all-round way, and the oilman enters the construction for the second time after the protection is completed, so that the oilman directly repairs the damaged position of the bricklayer during construction as new.
-
Bathroom and kitchen renovation words. The tiles should be glued first and then the hanging shed.
-
It's okay, but it's normal to stick the tiles first.
-
I think it should be tiled first and then the ceiling should be suspended.
-
The two processes didn't have much of an impact.
-
In the decoration process, the order of the ceiling and the wall tiles can be adjusted according to the actual situation. Generally speaking, it is completely feasible to make a suspended ceiling first and then apply wall tiles and floor tiles, but there are some special situations to consider.
If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].
First of all, we need to make it clear that the process of ceiling and tiling does not affect each other, so there is no absolute order in the decoration order. If you do the ceiling first, you can avoid damage to the ceiling during the tiling process. At the same time, after the completion of the ceiling, you can better choose and match the wall tiles and floor tiles according to the style and color of the ceiling.
In terms of **, the cost of suspended ceilings and tiling mainly depends on the quality of the materials chosen and the wages of the workers. Generally speaking, the market price of suspended ceilings is between 100-300 yuan per square meter, and the ** of wall tiles and floor tiles is between 30-150 yuan per square meter. Of course, these ** are adapted to the local market conditions and the quality of the selected materials.
During the renovation process, it is recommended that the owner should fully consider their own needs and actual situation when determining the decoration sequence. If you have any questions about the renovation process and material selection, you can consult a professional renovation company or designer, who will provide the most suitable advice and plan according to your needs and budget. At the same time, no matter what decoration sequence is chosen, the quality of each step of the process should be ensured to ensure the final presentation of the decoration effect.
Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget, want to find a good company, learn more about decoration knowledge on Tuba Rabbit, click here, free 1 to 1 for your home decoration services: [Tuba Rabbit ** official website].
Kunming - [Kunming Decoration Strategy Guide].
Suzhou - [Suzhou Decoration Strategy Guide].
Hefei - [Hefei Decoration Strategy Guide].
Fuzhou - [Fuzhou Decoration Strategy Guide].
Beijing - [Beijing Decoration Strategy Guide].
Dalian - [Dalian Decoration Strategy Book].
Hangzhou - [Hangzhou Decoration Strategy Guide].
Shanghai - [Shanghai Decoration Strategy Guide].
Tianjin——[Tianjin Decoration Strategy Guide].
-
No, the order is to make the ceiling first and then paste the wall tiles and floor tiles.
1.The living room and bedroom should be suspended first, and then the floor tiles should be paved. Because the ceiling is carpentry, the garbage and dust are very large, even if the bricks are paved and protected with adhesive tape, it is not ideal, and it is difficult to take care of;
2.Suspended ceilings in kitchens, bathrooms (including plasterboard.)
It must be pasted with wall tiles, and then the ceiling is suspended, otherwise the joint will definitely not be effective.
3.The wall tiles will not be paved to the top, so making the ceiling first will affect the paving of the wall tiles.
4.The ceiling is made of carpentry, so it is not easy to arrange workers for construction. The carpenter withdrew the plasterer and the plasterer went in, and the plasterer withdrew and the carpenter went in again.
-
The ceiling of the kitchen and bathroom, including gypsum board, must be tiled and then suspended, otherwise the joint will definitely not be effective.
When the carpentry ceiling and oilworker wall are treated, stools and ladders must be used to climb the operation, which is easy to scratch the floor tiles on the ground, so you can make the ceiling first, and scrape the putty base layer on the surface of the oilworking shed, and then pave a large area of floor tiles as a whole after the completion of the climbing operation.
Toilet decoration process;
For the bathroom, I am very sure that I will tell you that the bricks are laid first and then the ceiling is suspended, and then I will smooth out the overall decoration sequence of the bathroom.
The first step: hydropower transformation, it is necessary to design a detailed hydropower design: first, to meet the needs of the owner; second, it is convenient for future maintenance; The third is to do a good job in dealing with concealed projects.
Step 2: Waterproofing measures, the waterproof coating in the bathroom extends from the floor to the wall. In the painting, it is not only necessary to ensure that its thickness is even, but also to deal with the junction between the ground and the wall, and the junction of various pipe fittings.
Only by applying the brush in place can it have a good waterproof effect.
Step 4: Ceiling design, the water vapor in the bathroom often rises to the ceiling, therefore, the decorative materials of the ceiling must also have waterproof, moisture-proof, anti-corrosion and high-temperature resistance.
-
It must be the first brick and then the ceiling, otherwise how to integrate the gap between the brick and the ceiling, and the ceiling is not easy to operate.
-
In the decoration process, it is completely okay to hang the ceiling first and then lay the floor tiles. This practice is mainly to avoid damage to the floor tiles that have been laid during the construction of the ceiling. During the construction of the ceiling, some materials, tools or construction waste may fall, and if the floor tiles have been laid, these may cause scratches or damage to the floor tiles.
With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tuba Rabbit Big Platform Counts**].
No longer worry about the company's price increase, omission and price increase.
In the local market, the quality of the ceiling depends mainly on the material chosen and the difficulty of construction. Generally speaking, PVC ceilings are between 50-100 yuan per square meter, gypsum board ceilings are between 100-200 yuan per square meter, and more high-end metal ceilings are between 200-500 yuan per square meter. As for floor tiles, it also depends mainly on the material and brand, generally speaking, ordinary ceramic floor tiles are between 30-60 yuan per square meter, while more high-grade polished tiles or marble tiles are between 100-300 yuan per square meter.
In the decoration process, it is recommended that the owner should consider not only the durability and aesthetics of the material when choosing the ceiling and floor tile material. At the same time, during the construction process, it is also necessary to pay attention to protecting the completed part to avoid damage to the completed part due to subsequent construction. In addition, the construction of suspended ceilings and floor tiles also needs to find an experienced construction team to ensure the quality of construction.
Kunming - [Kunming Decoration Strategy Guide].
Suzhou - [Suzhou Decoration Strategy Guide].
Hefei - [Hefei Decoration Strategy Guide].
Fuzhou - [Fuzhou Decoration Strategy Guide].
Beijing - [Beijing Decoration Strategy Guide].
Dalian - [Dalian Decoration Strategy Book].
Hangzhou - [Hangzhou Decoration Strategy Guide].
Shanghai - [Shanghai Decoration Strategy Guide].
Tianjin——[Tianjin Decoration Strategy Guide].
-
The decoration construction follows the basic principle of "whoever is dirty who does it first", suspended ceiling.
The construction sequence of bricks and bricks will vary depending on the space.
If it is a living room or bedroom, you need to hang the ceiling first and then lay the floor tiles. Because the ceiling of the living room and bedroom is mostly made of gypsum board.
Materials such as wood belong to carpentry.
The garbage and dust generated when the ceiling is larger, if the floor tiles are paved first, even if the finished product protection effect of the floor tiles is not ideal even if the adhesive paper is used, it is more difficult to take care of, so it is necessary to do the ceiling first. If it is a kitchen and bathroom, you need to lay floor tiles before hanging the ceiling.
Because the ceiling used in the kitchen and bathroom is mostly made of aluminum gusset or PVC and other materials, the construction waste generated.
Less, the construction is more tidy, so you can first lay the floor tiles and then the ceiling.
-
<> "Tile or ceiling first.
Basically, the ceiling is resistant to celery liquid and then pasted with tiles, which brings more construction quality. If the bricks are laid first, it is easy to cause the brick surface to bump when making the roof, which will affect the quality of the floor tiles. And if you do the ceiling first, this will not happen.
In addition, the ceiling can also shorten the construction period, after all, after the floor tiles are laid, the room will be closed for about 7 days, which is a waste of time. Roofing first and then tiling can shorten the construction period.
What are the benefits of installing a suspended ceiling.
1. The appearance will be higher.
In fact, when we install the ceiling, some people will find it more troublesome, so they will not install it, but if you ignore a problem, then you will not feel that the appearance of your home is too high, after all, the exquisite decoration of the ceiling will make the shape of the ceiling more exquisite, and it can also create a home atmosphere, so we will create a space atmosphere or create a space atmosphere for the ceiling, which is also a part of the importance of highlighting the atmosphere of the home.
2. It also feels very comfortable.
In fact, some people install suspended ceilings because they want the roof of the house to be more layered, so that the rooms in the house also have a sense of hierarchy. Visually it is also a pleasure, and they care more about sensory comfort. We are also in a good mood to face our own house.
3. Sufficient lighting.
After all, the atmosphere needed by the home is also enhanced by lighting, so most of the indoor lighting is relatively simple, if it can produce several different effects, such as point light or surface light through the ceiling, if you use lights, indoor lighting will be better. The optimum comfort level will light up spontaneously, creating a cosy and welcoming environment. In addition, if we can achieve a soft and natural effect by reflecting light, it is also a good choice, which is closer to our nature.
You won't be dazzled.
-
There are tiles on the wall, do the ceiling first or paste the tiles first.
Dear Kiss I am happy to answer for you, my answer is as follows: if it is to decorate the living room and bedroom, we should first hang the ceiling, if it is a kitchen or bathroom, we must first stick to the wall. 1. If it is to decorate the living room and bedroom, we should first suspend the ceiling, and then paste the wall tiles after the ceiling is completed, because the ceiling belongs to the carpentry work, and there will be a lot of dust falling off when installing the ceiling.
2. If it is a kitchen or bathroom, we must first paste the wall tiles, and then hang the ceiling, because the walls of the bathroom and the kitchen are basically paved with tiles, which will not cause any damage to the wall.
It doesn't matter who has the first and who can do the following, but, the footline and the wallpaper have the order, one to do the foot sweeping is the baseboard you are talking about, and then paste the wallpaper, because the size from top to bottom is fixed by the baseboard, so as to determine the length of the wallpaper.
Bathroom decoration is good with tiles first; If the toilet is installed first, it will affect the laying of tiles, which will also cause waste of materials, if the tiles are then laid, so that the tiles can be cut according to the size of the toilet, and it will not affect the appearance and will not cause waste.
For bathroom decoration, first paste the wall tiles, pave the tiles, confirm that the tiles are cured and dry, and level the tile gaps to the waterproof and beautiful joints according to the process order, and then install them in the toilet. >>>More
<> case of buying doors and floors, you may consult the ** business, and the reply you get is all human factors, and your own goods should be installed first. Regarding this problem, we can analyze it together and see what advantages and disadvantages there are in the first door installation and first installation flooring. >>>More
When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps: >>>More