The difference between the design of concrete structure reinforcement and the design of new concrete

Updated on technology 2024-08-12
3 answers
  1. Anonymous users2024-02-16

    The design of concrete reinforcement and the design of new concrete structures are different and are different codes.

    The concrete reinforcement design code is GB50367, and the concrete structure design code is GB50010, which is essentially different.

    And in the reinforcement design, the reinforcement methods include concrete replacement method, steel cladding method, bamboo charcoal fiber pasting method, and rear ring beam structural column method.

  2. Anonymous users2024-02-15

    First of all, there is a difference in the durability of the material, because there is a large gap between the material of the reinforced body and the reinforced material in the molding time, the reinforced material must bear a heavier load than the original body. We know that the force is transmitted to the strong place, so the reinforced component must have more energy surplus than the new structural component.

    Secondly, to ensure a good connection between the old and new concrete, it is necessary to excavate part of the old concrete.

  3. Anonymous users2024-02-14

    1. There are several methods for reinforcing concrete structures.

    1. Strengthen the concrete by paving the steel plate; 2. The strength of concrete is low, and the concrete can be replaced for reconstruction; 3. Construct on the outside of the concrete, add external prestress, and reinforce; 4. Weld the plate to improve the bearing capacity; 5. Use fiber composite board to reinforce concrete; 6. Increase the cross-section of concrete.

    Second, what do you need to know about concrete construction?

    1. In the process of concrete entering the mold, it is necessary to control the dosage and try not to pour it all at once, otherwise it is easy to bring unnecessary trouble. Generally is to impact the inside of the formwork first, pour the concrete of about 2m height, pay attention to the position of the outlet simultaneously, let the height of its pouring layer, control within, avoid the existence of safety hazards.

    2. When the concrete is mixed, try to use it up within 4 hours, if it exceeds this time, it is easy to lead to cold joints in the concrete, which affects the strength of the concrete. Moreover, the time of concrete pouring needs to be controlled above, and the vibrator is stirred at the junction to enhance its strength.

    3. During the pouring of concrete, it is necessary to constantly stir the vibrating rod until the concrete surface is no longer bubbled, and there is no floating slurry on the surface, then the concrete can be used. In addition, after the concrete is poured, it is necessary to roughly estimate the amount to see if it is necessary to continue, so as to contact the relevant personnel in time for arrangement.

    There are several methods for reinforcing concrete structures, and what you need to know about concrete construction, so let's introduce it here. There are many ways to reinforce concrete structures, and it is best to carry out construction by professionalism, so as to avoid detailed problems and affect the subsequent construction.

Related questions
3 answers2024-08-12

Title: FRP Reinforced Concrete Structure.

Publisher: China Architecture & Building Press. >>>More

13 answers2024-08-12

The strength is enough to deal with it, the reason for the thickness of the carbonization layer is that your concrete curing is not very good, if it is a rebound detection and therefore low strength, you can grind the carbonization layer off with a grinder, which will be more troublesome, and then carry out rebound detection, the general strength can go up. If you can't drill the core, determine the strength. If the carbonization depth is high and the strength meets the design requirements, there is no need to do any treatment. >>>More

9 answers2024-08-12

Structural characteristics: multi-phase, porous composite cement stone contains crystalline and amorphous hydrates. >>>More

4 answers2024-08-12

First of all, the frame structure is a mechanical system. Steel-concrete structures are material systems. How do you compare the different systems? >>>More

12 answers2024-08-12

Concrete strength: C20, slump.

35-50mm, sand type: medium sand, preparation strength, the maximum particle size of the stone is 40mm, and the cement strength is 32Level 5, dosage per cubic meter; Cement 331kg m3 Sand 656kg m3 Crushed stone 1218kg m3 Water 182kg m3 Mix ratio; 1:: >>>More