What is the application form for the start of the project, and does the construction report form sti

Updated on society 2024-08-04
8 answers
  1. Anonymous users2024-02-15

    First, first enter the venue to prepare:

    1. Project commencement report, construction permit, construction organization design, materials and equipment for review.

    2. Concrete mix ratio design and material inspection.

    3. On-site acceptance. Temporary facilities (schemes), safe and civilized construction preparations.

    4. Engineering survey and positioning records.

    Should be all prepared:

    Basic information table of construction projects.

    Construction approval materials (vertical approval documents required from the construction unit).

    Construction project planning permit (planning permit required from the construction unit), notice of winning the bid for the construction project (notice of winning the bid from the construction unit), construction contract (construction contract required from the construction unit).

    Supervision contract (supervision contract to the supervision unit).

    A copy of the qualification and personnel certificate of the construction unit.

    Copies of project supervision institutions and relevant certificates.

    A copy of the qualification and personnel certificate of the design unit.

    A copy of the qualification and personnel certificate of the survey unit.

    Copies of project construction institutions and related certificates (including qualification certificates, personnel employment certificates (constructors, budget officers, quality inspectors, safety officers, material personnel, labor insurance personnel, surveyors, samplers, data personnel, drainage, heating, electrical engineers, project managers).

    Drawing triage records and design change documents.

    Design documents and design changes before the start of construction.

    Construction site quality management inspection records and schedules.

    1. A package of quality responsibility system.

    2. The main professional types of work operation certificate (tower crane, scaffolding worker, gantry, electric welder, butt welder, straight rib, electroslag welder).

    3. The qualification contract of the subcontractor.

    4. Construction drawing review (construction drawing review certificate).

    5. Geological survey documents.

    6. Construction organization design, construction plan and approval.

  2. Anonymous users2024-02-14

    The construction application information should be provided by the construction unit.

    1. Approval of the Planning Commission (3 copies).

    2. Project land permit (2 copies).

    3. Planning permits (3 copies).

    4. The construction blueprint that has been reviewed (each must be stamped with the stamp, the stamp, the structural engineer's stamp, and the architect's stamp) (3 sets).

    5. Design document review record form, review ** copy (3 copies).

    6. Project budget (3 copies).

    7. Notice of winning the bid (construction unit, construction unit, quality supervision station, market station) (4 copies) 8. Geological survey report (2 copies).

    9. Building energy saving calculation report.

    10. List of project organization and person in charge of the construction unit (including ** number) 11. Scattered procedures.

    12. Wall procedures.

    13. Archives responsibility letter.

  3. Anonymous users2024-02-13

    The information to be submitted for review before the start of construction is as follows:

    1. Construction site quality management inspection records;

    2. The inspection base of the construction site safety management system;

    3. Project commencement report (issued after having a construction permit);

    4. The construction organization design, safety plan, temporary power plan, and special plan for dangerous projects need to be approved at the company level, and then submitted to the supervisor for review;

    5. Various construction special plans (according to the specific situation, basically reported separately according to the branch project);

    6. Construction schedule;

    7. Unit, division and sub-project division table;

    8. Quality plan (quality control point division table);

    9. Safety permit acceptance procedures for construction machinery and various facilities;

    10. List of measuring instruments to be used and related test certificates (such as level, theodolite, etc.);

    11. The qualification of the subcontractor shall be submitted for examination (if any).

    Article 5 of the Work Safety Law of the People's Republic of China The main person in charge of the production and business operation unit is the first person responsible for the safety production of the unit, and is fully responsible for the safety production work of the unit. Other responsible persons are responsible for the safety production work within the scope of their duties.

    Article 4 The production and business units must comply with this Law and other laws and regulations related to production safety, strengthen the management of production safety, establish and improve the responsibility system for production safety and the rules and regulations for production safety, increase the investment in funds, materials, technology and personnel for production safety, improve the conditions for production safety, strengthen the standardization and informatization of production safety, build a dual prevention mechanism for hierarchical control of safety risks and investigation and management of hidden dangers, improve the risk prevention and resolution mechanism, and improve the level of production safety. Ensure safe production.

    Article 3 Work safety adheres to the leadership of the Communist Party of China.

    Work safety should be people-oriented, adhere to the supremacy of the people and the supremacy of life, put the protection of people's lives and safety in the first place, establish a strong concept of development and adhere to safety first.

    First, the policy of prevention first and comprehensive management should prevent and resolve major security risks from the source.

    The implementation of safety production must manage the safety of the industry, the safety of the business, and the safety of production and operation, strengthen and implement the main responsibility and supervision responsibility of production and business operation units, and establish a mechanism for production and business operation units to be responsible, employees to participate, supervise, industry self-discipline and social supervision.

  4. Anonymous users2024-02-12

    Legal analysis: commencement application form, commencement report, project overview table, list of construction management personnel (professional qualification certificate of management personnel, project manager, quality inspector, safety socks, construction personnel, technical person in charge, material personnel, testers, and project manager safety qualification certificate) construction site quality management inspection records, and the information that the construction unit needs to submit to the supervision for review before the project starts.

    Legal basis: Work Safety Law of the People's Republic of China

    Article 3 Work safety should be people-oriented, adhere to safe development, and adhere to safety first.

    First, the policy of prevention first, comprehensive management, strengthen and implement the main responsibility of production and business operation units, and establish a mechanism for production and business operation units to be responsible, employee participation, supervision, industry self-discipline and social supervision.

    Article 4 Production and business operation entities must comply with this Law and other laws and regulations related to production safety, strengthen the management of production safety, establish and improve the responsibility system for production safety and the rules and regulations for production safety, improve the conditions for production safety, promote the standardization of production safety, improve the level of production safety, and ensure production safety.

    Article 5 The main person in charge of the production and business operation entity shall be fully responsible for the safety production work of the unit.

    Article 6 Employees of production and business operation entities have the right to obtain production safety guarantees in accordance with the law, and shall perform their obligations in production safety in accordance with the law.

    Article 7 Trade unions shall supervise work safety in accordance with law.

    The trade union of the production and business operation unit shall organize the employees to participate in the democratic management and democratic supervision of the safety production work of the unit in accordance with the law, and safeguard the legitimate rights and interests of the employees in the safety and integrity of the production. Production and business operation entities formulating or revising rules and regulations related to production safety shall listen to the opinions of trade unions.

  5. Anonymous users2024-02-11

    The information for the commencement of construction is as follows:

    1. Construction site quality management inspection records;

    2. Checklist of construction site safety management system;

    3. The project commencement report shall be issued after the construction permit is available;

    4. The construction organization design, the safety plan, the temporary power plan, and the special plan for the dangerous project need to be submitted to the supervisor for review after the company-level approval;

    5. Various construction special plans (according to the specific situation, basically reported separately according to the branch project);

    6. Construction schedule;

    7. Unit, division and sub-project division table;

    8. Quality plan (quality control point division table);

    9. Safety permit acceptance procedures for construction machinery and various facilities;

    10. List of measuring instruments to be used and related test certificates (such as level, theodolite, etc.);

    11. The qualification of the subcontractor shall be submitted for examination (if any).

    Legal basisArticle 4 of the Work Safety Law of the People's Republic of China.

    Production and business operation entities must comply with this Law and other laws and regulations related to production safety, strengthen the management of production safety, establish and improve the responsibility system for production safety and the rules and regulations for production safety, increase the investment in funds, materials, technology and personnel for production safety, improve the conditions for production safety, strengthen the standardization and informatization of production safety, build a dual prevention mechanism for hierarchical control of safety risks and investigation and management of hidden dangers, improve the risk prevention and resolution mechanism, improve the level of production safety, and ensure production safety.

    Production and business operation units in emerging industries and fields such as the platform economy shall, on the basis of the characteristics of their respective industries and fields, establish, improve and implement a responsibility system for production safety for all employees, strengthen education and training on production safety for employees, and perform the relevant production safety obligations provided for in this Law and other laws and regulations.

    Article 5. The main person in charge of the production and business operation unit is the first person responsible for the safety production of the unit, and is fully responsible for the safety production work of the unit. Other responsible persons are responsible for the safety production work within the scope of their duties.

  6. Anonymous users2024-02-10

    Legal analysis: Before the start of the project, the information of the supervision unit that the construction unit needs to report is as follows:

    1) Construction permit (original copy);

    2) Design disclosure, drawing review minutes (original);

    3) Witness sampling and testing agreement entrusted by the construction unit (original, which needs to be filed with the construction industry association first);

    4) The "Commencement Report Form" approved by the chief engineer (original);

    5) The "Construction Organization Design Plan Application Form" approved by the chief engineer (original);

    6) Construction waste disposal certificate (if there is no license, the construction unit shall provide explanatory materials);

    7) the creation of municipal civilized construction sites, municipal excellent projects, respectively submitted to the municipal construction project municipal civilized construction site creation declaration form, the municipal excellent project creation activities record registration form.

    Legal basis: "Construction Law of the People's Republic of China".

    Article 23 ** and its subordinate departments shall not abuse their administrative power to restrict the contracting unit from contracting the construction project contracted by bidding to the designated contracting unit.

    Article 24 It is advocated that general contracting of construction projects shall be carried out, and it is forbidden to dismember and roll the construction projects into contracting.

    The contracting unit of the construction project may contract the survey, design, construction and equipment procurement of the construction project to a large general contractor of the project, and may also contract one or more of the survey, design, construction and equipment procurement of the construction project to the general contractor of the project; However, a construction project that should be completed by one contractor shall not be dismembered into several parts and awarded to several contractors.

    Article 25 In accordance with the contract, if the building materials, building accessories and equipment are purchased by the project contractor, the contract issuing unit shall not designate the contractor to purchase the building materials, building accessories and equipment used in the project or designate the manufacturer or the first supplier.

  7. Anonymous users2024-02-09

    Need.

    A commencement order is a written document issued by the superintendent that allows the commencement of construction, and the date on which the commencement order is issued is the actual commencement date of the project.

    The commencement order is generally issued by the superintendent, and the commencement order is the starting point for calculating the construction period. At the same time, contractors.

    It is also necessary to have a clear date for the commencement of construction in order to obtain the required commitments (e.g. ordering, renting machinery, providing labour, etc.) from subcontractors, contractors and other interested parties in advance, and to obtain the advance payment from the owner.

    For the owner, it is necessary to supervise the engineer.

    At the same time as issuing the notice of commencement, the required site and passage shall be handed over to the contractor in accordance with the requirements of the construction sequence specified in the contract. Delay will result in a delay in the work and an additional cost to the owner.

    The project commencement report is attached to the commencement report, the list of management personnel of the project management department and relevant documents, the name, quantity, specification and performance list of the materials and equipment entering the site, and the special types of work.

    The name of the person. The commencement report is generally at the beginning of the project, when all the preliminary procedures and filing materials of the project are complete. The report submitted by the construction unit to the supervisor and the owner for the commencement of the application project.

    It is necessary to indicate the completion of the preliminary procedures, the guessing of the banquet, etc. The commencement report is a report on the permanent construction of the proposed project that is applied by the contractor of the construction project and approved by the supervising engineer. According to international practice, the contractor is not allowed to carry out the construction of permanent works without a commencement report approved by the supervising engineer.

    If the contractor does not submit such a report, the supervising engineer may still issue a commencement order for the commencement of permanent works that must be carried out at the time specified in the contract. In order to obtain this order, the contractor must have elements satisfactory to the engineer to put into the construction site.

    If the contractor fails to commence work as required by the commencement order, or only commences work on a symbolic basis, on the date specified in the commencement order, it will be considered a breach of contract.

  8. Anonymous users2024-02-08

    The annex to the commencement application form includes a copy of the project planning conditions, a copy of the survey and design documents, a copy of the guarantee measures, and a copy of the safety technical measures.

    1. A copy of the planning conditions of the project: including the project feasibility study report and environmental impact report of the project, so that the competent department can review it.

    2. Copies of survey and design documents: including architectural design documents, civil design documents, etc.

    3. Copies of guarantee measures, safety technical measures, etc.: mainly including documents for safety management on the construction site, such as safety certificates for fire and hazardous chemicals.

    The specific content of the attachment to the commencement application form needs to be determined according to the specific situation, and it will change with different projects. It is recommended to understand the specific requirements of the competent department for review in advance before filling in the application form, and prepare in strict accordance with the requirements.

Related questions
7 answers2024-08-04

2.The construction organization plan is submitted for review. 3. >>>More

12 answers2024-08-04

Dizzy. You need to learn, I'm a resource clerk gardener. These questions are not clear in one or two words. >>>More

15 answers2024-08-04

Competency sub-items. Description of specific capabilities. >>>More

9 answers2024-08-04

The basic conditions for the assessment of intermediate engineers: >>>More

10 answers2024-08-04

1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More