What does it mean to be accepted for completion? What is the difference between completion acceptanc

Updated on society 2024-08-10
7 answers
  1. Anonymous users2024-02-15

    Completion means: completion; The project was completed. 1. Pinyin: completion [jùngōng].

    2. Source: Qing Wang Shi "Chibei Occasional Talk, Tan Xianyi, Geduansu Gong Family Motto": "So the room entered in the year and was completed in about a few years. ”

    Interpretation: So it took a year to build a house, and it took a few years to complete.

    3. Example sentences. 1. The completion date is approaching, and the construction workers are working overtime.

    2. After several years of hard work, this project has been completed, and it is a matter of course to carry out the completion acceptance.

  2. Anonymous users2024-02-14

    It is best to deliver each project for use, and it is necessary to carry out completion acceptance before delivery. Completion acceptance is the last procedure of engineering construction, refers to the construction project in accordance with the relevant national laws, regulations and engineering construction specifications, standards to complete the requirements of the engineering design documents and the content of the contract, the construction unit has obtained the relevant competent departments (or their entrusting agencies) issued by the project construction quality, fire protection, planning, environmental protection, urban construction and other acceptance documents or permission to use documents, the organization of project completion acceptance and the preparation of the completion of the "construction project completion acceptance report".

    The Construction Law stipulates that the construction project delivered for completion and acceptance must meet the specified construction project quality standards, have complete engineering technical and economic information and a signed project warranty, and have other completion conditions stipulated by the state.

    The construction project can only be delivered after the completion experience is qualified; If it has not been accepted or the acceptance is unqualified, it shall not be delivered.

    Article 61 of the Construction Law of the People's Republic of China for completion and acceptance of construction projects must meet the specified quality standards of construction projects, have complete engineering technical and economic information and signed project warranty, and have other completion conditions stipulated by the state.

    The construction project can only be delivered after the completion experience is qualified; If it has not been accepted or the acceptance is unqualified, it shall not be delivered.

  3. Anonymous users2024-02-13

    Legal analysis: the difference between project delivery acceptance and completion acceptance: 1. The time is different, the delivery acceptance is first, and the completion acceptance is later; 2. The content of the work is different, the main work of the delivery is to check the implementation of the construction contract, evaluate the quality of the project, conduct a preliminary evaluation of the work of the participating units, and the main work of the completion is to conduct a comprehensive evaluation of the project quality, the participating units and the construction project, and make an overall comprehensive evaluation of the engineering construction project.

    Legal basis: Article 61 of the Construction Law of the People's Republic of China The construction inspection project delivered for completion acceptance must meet the specified construction project quality standards, have complete engineering technical and economic information and signed project warranty, and have other completion conditions stipulated by the state. The construction project can only be delivered after the completion experience is qualified; If it has not been accepted or the acceptance is unqualified, it shall not be delivered.

  4. Anonymous users2024-02-12

    Completion acceptance refers to the process of obtaining qualified materials, data and vouchers for completion of the construction project after the completion of the construction project by the construction unit, together with the design, construction, equipment unit and engineering quality supervision and other departments, to conduct a comprehensive inspection of whether the project meets the planning and design requirements and the quality of construction and equipment installation. Completion acceptance is an important part of the comprehensive assessment of the construction work, checking whether it meets the design requirements and project quality, and plays an important role in promoting the timely commissioning of the construction project, giving full play to the investment effect, and summarizing the construction experience.

    Legal basis] Article 61 of the Construction Law, the Nashengxin construction project delivered for completion and acceptance must meet the specified construction project quality standards, have complete engineering technical and economic information and signed project warranty, and have other completion conditions stipulated by the state. The completion experience of the tunnel construction wheel construction project can be delivered only after the completion experience is qualified; If it has not been accepted or the acceptance is unqualified, it shall not be delivered.

  5. Anonymous users2024-02-11

    The explanation of the completion acceptance is as follows:

    1. Completion acceptance is the last procedure of project construction, and the requirements of the engineering design documents and the content agreed in the contract are completed;

    2. The construction unit obtains the relevant competent departments and entrusting agencies, and after receiving the documents or license documents, it organizes the completion and acceptance of the project, and the construction project can be delivered only after the completion and acceptance of the project.

    Finish? The processes of each stage are as follows:

    1. Open? Do you need to do it before? License, License? Organizational design, open? Reports, ?Cheng geological exploration report, Shi? On-site quality management inspection records, quality? Employee qualification certificate, special? Kind of work permit, measurement and pay-off;

    2. What is the foundation? The stage requires the rebar approach sampling 、??excavation, cushioning; Clan.

    3. The main body is implemented? Stage Required? Layer structure? Table;

    4. Floor tiles, ceiling materials, and ceiling materials are required in the decoration stageDecoration such as windows and paints should be entered in advance? Retest, after the test report comes out and is submitted to the supervisor for review? Can be applied;

    5. House? Give? Stage need to be protected by the nuclear shirt? The main materials such as coils should be retested in advance, and the retest report should be submitted to the supervision for review and approval. Enterable? House? Give? Stage.

    Legal basis] Regulations on the Quality Management of Construction Projects

    Article 16 After receiving the report on the completion of the construction project, the construction unit shall organize the design, construction, project supervision and other relevant units to carry out the completion acceptance. The following conditions shall be met for the completion and acceptance of construction projects:

    1) Complete the construction project design and the contents agreed in the contract;

    2) Have complete technical files and construction management materials;

    3) There is an approach test report of the main building materials, building accessories and equipment used in the engineering slide cavity;

    4) There are survey, design, construction, engineering supervision and other units signed by the quality of the documents;

    5) There is a project warranty signed by the construction unit. If the construction project experience is qualified, it can be delivered.

  6. Anonymous users2024-02-10

    1. What is the difference between completion acceptance and delivery acceptance?

    1. The time is different, the delivery acceptance is in the front, and the completion acceptance is in the back. The content of the work is different, the main work of the delivery is to check the implementation of the construction contract, evaluate the quality of the project, conduct a preliminary evaluation of the work of the participating units, and the main work of the completion is to conduct a comprehensive evaluation of the project quality, the participating units and the construction project, and make an overall comprehensive evaluation of the engineering construction project.

    2. Legal basis: Article 61 of the Construction Law of the People's Republic of China.

    The construction project delivered for completion and acceptance must meet the specified construction project quality standards, have complete engineering technical and economic information and a signed project warranty, and have other completion conditions stipulated by national regulations. The construction project can only be delivered after the completion experience is qualified; If it is not accepted or inspected and unqualified, it shall not be delivered.

    2. What information is required for completion acceptance.

    1. Record form for project completion acceptance.

    2. Project completion acceptance report. The completion acceptance report shall include the date of the project application, the construction permit number, the review opinions of the construction drawing design documents, the quality of the survey, design, construction, engineering supervision and other units signed by the quality documents and the original documents signed by the acceptance personnel, the relevant quality inspection and functional test data of the municipal infrastructure and the relevant information that the filing authority considers necessary to provide.

    3. Laws and administrative regulations shall be issued by the planning, environmental protection and other departments of the approval document or permission to use the document.

    4. The law shall be issued by the public security and fire department for the acceptance of large-scale crowded places and other special construction projects.

    5. The warranty letter signed by the construction unit for the quality of the project.

    6. Other documents that must be provided according to laws and regulations.

  7. Anonymous users2024-02-09

    Completion acceptance refers to the process of obtaining qualified materials, data and vouchers for completion of the construction project after the completion of the construction project by the construction unit, together with the design, construction, equipment unit and engineering quality supervision and other departments, to conduct a comprehensive inspection of whether the project meets the planning and design requirements and the quality of construction and equipment installation. Completion acceptance is an important part of the comprehensive assessment of the construction work, checking whether it meets the requirements of the design and the quality of the project, and plays an important role in promoting the timely commissioning of the construction project (project), giving full play to the investment effect, and summarizing the construction experience.

    1. What are the types of contracts in construction contracts?

    Construction contracts include survey, design contracts and construction contracts. Article 794 of the Civil Code [Content of Survey and Design Contracts] The content of survey and design contracts generally includes clauses such as the time limit, quality requirements, fees and other conditions for cooperation of documents related to basic materials and budget estimates. Article 795 [Content of the Construction Contract] The content of the construction contract generally includes the scope of the project, the construction period, the commencement and completion time of the intermediate delivery project, the quality of the project, the cost of the project, the time of delivery of technical materials, the responsibility for materials and equipment, the appropriation and settlement, the completion acceptance, the scope of the quality warranty and the quality assurance period, and mutual cooperation.

    2. Does the Quality Supervision Bureau want to accept the acceptance report?

    1.The completion acceptance is organized by the construction unit, and the participating units are: the construction unit, the geological unit, the supervision unit, and the construction unit;

    2.When the completion is accepted, the construction unit shall provide the completion report, the supervision unit shall provide the quality assessment report, and the construction unit shall provide the completion acceptance report;

    3.Completion acceptance should be in the entity inspection or review after qualified, the local quality supervision department (i.e., the quality supervision station) and the participating units back to the conference room, the representative of the construction unit presided over the meeting, first by the geological unit to describe the quality of the unit project completed, followed by the design unit, the construction unit, the supervision unit, the construction unit, and finally the quality supervision department to summarize, the completion of the acceptance completed;

    The completion summary of the supervision generally says that the structure of the project is safe and reliable, meets the use function, meets the requirements of the specification, conforms to the provisions of the contract documents and design documents, meets the provisions of the mandatory standards, completes the technical information of the archives, and agrees with the completion and acceptance of the project (this sentence must be said).

    Article 61 of the Construction Law stipulates that the construction project delivered for completion and acceptance must meet the specified construction project quality standards, have complete engineering technical and economic information and a signed project warranty, and have other completion conditions stipulated by the state. The completion experience of the construction project can be delivered only after the friend is qualified; If it has not been accepted or the acceptance is unqualified, it shall not be delivered.

Related questions
8 answers2024-08-10

All the branch acceptance is qualified and the testing data is complete.

5 answers2024-08-10

1. The inspection batch and sub-project should be accepted by the supervising engineer (the technical person in charge of the project of the construction unit) and the person in charge of the professional quality (technology) of the project of the construction unit. >>>More

31 answers2024-08-10

In the process of completion, Hikvision's acceptance materials mainly include project quality evaluation, supervision report and acceptance party's consent application.

5 answers2024-08-10

1) After the completion of the project, the construction unit shall submit the project completion report to the construction unit and apply for the completion acceptance of the project. For the project to be supervised, the project completion report shall be signed by the chief engineer. >>>More

8 answers2024-08-10

The completion acceptance stage is the final overall quality acceptance stage, and I am afraid that you may be involved in the information that happened before, so basically all the information during the construction period should be prepared, including: >>>More