What is the procedure for the completion and acceptance of the project?

Updated on society 2024-07-28
5 answers
  1. Anonymous users2024-02-13

    1. The inspection batch and sub-project should be accepted by the supervising engineer (the technical person in charge of the project of the construction unit) and the person in charge of the professional quality (technology) of the project of the construction unit.

    2. The division project should be accepted by the chief engineer (the project leader of the construction unit) to organize the project leader of the construction unit and the person in charge of technology and quality. The survey of the foundation and foundation, the main structure division project, the project leader of the design unit and the technical and quality person in charge of the construction unit are accepted.

    3. After the completion of the project, the construction unit shall organize relevant personnel to conduct inspection and evaluation, and submit the project acceptance report to the construction unit.

    4. After the construction unit receives the project acceptance report, the person in charge of the construction unit (project) shall organize the person in charge of the construction (including subcontracting), design, supervision and other units to carry out the project acceptance of the unit.

    5. After the quality acceptance of the unit's project, the construction unit shall submit the completion report and relevant documents to the construction administrative department for the record within the specified time (15 days).

    Article 7 of the Interim Provisions on the Completion and Acceptance of Housing Construction Projects and Municipal Infrastructure Projects After the completion and acceptance of the project, the construction unit shall submit the project completion acceptance report in a timely manner. The project completion acceptance report mainly includes the general situation of the project, the implementation of the capital construction procedures by the construction unit, the evaluation of the engineering survey, design, construction, supervision, etc., the time, procedure, content and organizational form of the project completion acceptance, and the project completion acceptance opinions.

  2. Anonymous users2024-02-12

    What is the project completion acceptance procedure? How long does the project completion acceptance process take? 1. Necessary conditions for the completion and acceptance of the project 1. Complete the project design and the contents agreed in the contract.

    2. "Construction Project Completion Acceptance Report". 3. "Project Quality Assessment Report". 4. Quality inspection report of survey unit and design unit.

  3. Anonymous users2024-02-11

    Legal analysis: 1. The construction unit shall organize the completion acceptance of the project and preside over the acceptance meeting.

    2. The engineering survey, design, construction and supervision units shall report on the performance of the project contract and the implementation of laws, regulations and mandatory standards for engineering construction in all aspects of the project construction.

    3. The acceptance team reviews the project archives of the construction, survey, design, construction and supervision units.

    4. The acceptance team and the professional group (composed of survey, design, construction, supervision units, supervision stations and other relevant special families organized by the construction unit) inspect the quality of the project on the spot.

    5. The professional group and the acceptance team expressed their opinions and made a comprehensive evaluation of the engineering survey, design, construction, equipment installation quality and various management links; The acceptance team forms the project completion acceptance opinion, fills in the "Construction Project Completion Acceptance Report" and signs it (with the official seal).

    Legal basis: "Regulations on the Quality Management of Construction Projects" Article 16 After the construction unit receives the completion report of the construction project, it shall organize the design, construction, engineering supervision and other relevant units to carry out the completion acceptance. The following conditions shall be met for the completion and acceptance of construction projects:

    1) Complete the construction project design and the contents agreed in the contract; (B) have a complete technical file and construction management information; (C) the main building materials, building accessories and equipment used in the project approach test report; (D) survey, design, construction, engineering supervision and other units signed by the quality of the documents; (5) There is a project warranty signed by the construction unit. The construction project can be delivered only if the experience is qualified.

  4. Anonymous users2024-02-10

    First, the acceptance procedure 1 construction unit to submit the acceptance application report construction unit decided to formally submit the acceptance application report to the supervision unit should be sent to the supervision unit after receiving the acceptance application report, the supervision engineer should refer to the requirements of the engineering contract, acceptance standards and so on for careful review. 2 according to the application report for the initial inspection of the site after the supervision engineer reviews the acceptance application report, if it is considered that the acceptance can be carried out, the supervision personnel should form an acceptance team to carry out the initial inspection of the completed project, and the quality problems found in the initial inspection should be promptly notified in writing or in the form of a memorandum to tell the pure construction unit, and make it press the key to correct the relevant quality requirements for repair or even rework. 1. Led by the supervising engineer, the owner, the design unit, the construction unit, etc. are organized to participate in the formal acceptance.

    Second, the content of acceptance.

    1. The acceptance content of construction engineering is mainly how to use relevant information for review and acceptance, mainly including:

    1) Whether the location, elevation and axis of the building meet the design requirements;

    2) the review of the earthwork, cushion engineering, masonry engineering and other materials in the foundation engineering, because these projects have been accepted at the time of "delivery and acceptance";

    3) Review and acceptance of brick and wood structures, brick-concrete structures, internal pouring and external masonry structures, and reinforced concrete structures in structural engineering;

    4) Review and acceptance of the wood foundation, linoleum, roof tile, insulation layer, waterproof layer, etc. of the roofing project;

    5) Review and acceptance of door and window projects;

    6) Review and acceptance of decoration projects (plastering, painting and other projects).

    2. Acceptance of installation engineering: The acceptance of installation engineering is divided into construction equipment installation engineering, process equipment installation engineering, and power equipment installation engineering acceptance.

    1) Construction equipment installation projects (referring to the installation of water and water pipelines, heating, gas, ventilation, electrical lighting and other installation projects in civil buildings) should check whether the specifications, models, quantities and quality of these equipment meet the design requirements, check the materials, materials and materials during installation, and check the pressure test, closed water test and lighting.

    2) The process equipment installation project includes: the installation of production, lifting, transmission, experimental and other equipment, as well as the laying of auxiliary pipelines, painting, insulation, etc. Check the specifications, models, quantity, quality of equipment, equipment installation location, elevation, frame size, quality, stand-alone test, no-load linkage test, load-linked test, pipeline welding quality, cleaning, purging, pressure test, leak test, paint, insulation, etc. and various valves.

    3) Power equipment installation project refers to the project with its own power plant, or the acceptance of the substation and distribution room (institute) and power distribution line. On the basis of the initial inspection of the supervising engineer, the supervising engineer can take the lead, organize the owner, the design unit, the construction unit, etc. to participate, and carry out formal acceptance in the specified time.

  5. Anonymous users2024-02-09

    Engineering acceptance is the process of taking certain means to check whether the characteristics of engineering products meet the acceptance standards on the basis of engineering quality assessment and according to an established acceptance standard. In China, the traditional project acceptance is divided into sub-project acceptance, stage acceptance, and completion acceptance. Among them, stage acceptance refers to the acceptance carried out before the construction of the project reaches a certain critical stage, such as the interception of the project and the storage of water in the reservoir.

    Completion acceptance refers to the acceptance of the project after a period of operation after all the projects have been completed. If the completion acceptance means that the contractor has basically completed the construction content according to the requirements of the contract documents, the quality meets the requirements, and the products and application conditions are met, the project acceptance before the project handover can be formally handled.

    The procedures for the completion and acceptance of the project are equipped with the town of Sui:

    1. After the completion of the project, the construction unit shall submit the project completion report to the construction unit and apply for the completion acceptance of the project. For the project to be supervised, the project completion report must be signed by the chief engineer. (Before the completion of the project, the construction unit shall notify the quality supervision department to conduct quality supervision and inspection of the project entity in place).

    2. After receiving the completion report of the project, the construction unit shall organize the survey, design, construction, supervision and other units and other experts from other relevant parties to form an acceptance team for the project that meets the requirements of completion acceptance and formulate an acceptance plan.

    3. The construction unit shall, 7 working days before the completion and acceptance of the project, notify the engineering supervision agency responsible for supervising the transportation of the project of the time, place and list of acceptance groups.

    4. The construction unit organizes the completion and acceptance of the project.

    Construction, survey, design, construction and supervision units respectively report on the performance of the project contract and the implementation of laws, regulations and mandatory standards for project construction in all aspects of the project construction;

    Review the project dossiers provided by the construction, survey, design, construction and supervision units;

    inspect the quality of the project entity;

    Make an overall evaluation of the construction of the project, the quality of equipment installation and the management of each link, form the project completion acceptance opinion, and the acceptance personnel sign.

    When the construction, survey, design, construction, supervision and other parties involved in the completion and acceptance of the project cannot form an agreement, it shall be reported to the local construction administrative department or supervision agency for coordination, and after the agreement is reached, the project completion acceptance shall be reorganized.

    The above content is collected and sorted out by Zhongda Consulting, more information about the "procedures for project completion acceptance" and other construction knowledge, as well as construction enterprise bidding, honor, qualification, industrial and commercial information, legal proceedings, construction engineers under construction and other information, you can log in to Zhongda Consulting Industry News column to find or follow Zhongda Consulting WeChat official *** for inquiry.

Related questions
7 answers2024-07-28

If the house is not accepted, what should the buyer do? Clause. >>>More

6 answers2024-07-28

Filing and registration form of construction project completion statement. >>>More

5 answers2024-07-28

Summary. Hello, I'm glad to answer for you: Professional acceptance certificate: >>>More

9 answers2024-07-28

The paragraph of the construction contract (model text) of China's construction project stipulates that the date on which the contractor submits the completion acceptance report is the actual completion date when the project is completed and accepted. If the project passes the completion acceptance after being modified according to the requirements of the employer, the actual completion date shall be the date on which the contractor submits the project to the employer for acceptance after the modification.

10 answers2024-07-28

The preparation unit of the completion settlement is the construction unit. It is the last to ask the construction unit for money to settle the bill. >>>More