-
The installation time of the door is an important factor to consider during the renovation process. In general, the installation of the door should be carried out at a later stage of the renovation. This is because in the early stages of renovation, work such as plumbing and electrical renovations, wall painting, floor laying, etc., can cause damage to the door.
In addition, if the door is installed in the early stage of the renovation, it may cause inconvenience to the entry and exit of the construction personnel and affect the progress of the renovation.
With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tuba Rabbit Big Platform Counts**].
No longer worry about the company's price increase, omission and price increase.
In the local market, the range of doors is larger, mainly depending on the material, brand and design of the door. Generally speaking, ordinary solid wood doors** are between 1000-3000 yuan, high-end solid wood doors** are between 3000-6000 yuan, and luxury solid wood doors** may exceed 10000 yuan. If you choose aluminum alloy doors or steel and wood doors, the ** will be relatively low, generally between 500-2000 yuan.
When choosing a door, in addition to considering, you also need to consider the quality of the door, the matching degree of design and decoration style. Generally speaking, solid wood doors are of better quality and durable, but **higher. Aluminum alloy doors or steel and wood doors are lower, but may be slightly inferior in quality and durability.
Therefore, it is recommended that when choosing a door, you should consider the quality, quality and design of the door according to your budget and decoration style.
In general, the installation of the door should be carried out at a later stage of the renovation to avoid damage to the door during the renovation process. When choosing a door, you should consider the quality, quality and design of the door according to your budget and decoration style.
-
Paint first, then install the door; The real thing is that the carpentry door is done and installed, and the oilman removes the door to wrap the lock and handle in order to paint it well, and then paints it again. Paint first and then Anmen, Xiananmen can also be, but it is easy to rub the paint, so you can only do a good job of covering and then paint. I think Nippon is good.
After laying the floor, it is OK to install it. After installation, you can use putty to make up for it.
-
Home decoration should be installed after the basic work is done, otherwise, the installation floor near the door of the kicking line can not be closed, if you do not install the baseboard, it does not matter whether the door is installed first or later.
-
Decoration, first do the floor, paste the floor, and then install the door, do the paint,
-
First, the reason for installing the door first and then laying the floor.
From the point of view of finished product installation, it will be less difficult to install the baseboard after installing the door cover, and the baseboard can be cut and fixed against the door cover, so that the installation is more tightly fitted, and there will be no problem of the baseboard finishing.
From the perspective of finished product protection, installing the door first will cause problems such as styrofoam dripping and glass glue pollution, but dripping directly on the cement floor is much stronger than dripping on the wooden floor, so the protection of the finished product is easier.
Second, the reason for laying the floor first and then installing the door.
After laying the floor and then installing the door, you can accurately ensure the gap between the door and the floor, and will not cause friction between the door and the floor.
Laying the floor first avoids the various installation difficulties that come with installing the door first, such as the inability to install due to special angles. Of course, the rear door is not happy for the installation worker, after all, the installation difficulty will increase.
Laying the floor first can also ensure that the door frame is pressed to the floor, so that the gap between the door frame and the floor is covered with glass glue, which will cause elastic contact, which can not only ensure that the moisture will not seep out and deform the door, but also avoid the difficulty of closing the door.
-
When decorating, the door is generally installed last. But this is the case except for the security door. Security doors should be replaced before renovations. The door at home needs to be renovated after other places are finally installed.
-
In practice, the walls are painted first, and the doors are installed after the floors are laid. If the door is installed early, it will affect the construction.
-
When it comes to decoration, the door is installed last. Generally, the floor is laid after the treatment is completed, and then the door is installed.
-
Generally, doors and windows are installed first, and then bathrooms and hardware are installed.
decoration in general order.
1) Alteration and demolition of the main body.
2) Hydropower transformation.
3) Package pipes.
4) Tiling. 5) Carpentry (passes, etc.).
6) Brush the oil. 7) Paint the wall or paste wallpaper (8) Install the socket panel (9) Kitchen and bathroom ceiling.
10) Cabinets.
11) Install the finished door.
12) Install lamps, sanitary ware, and bathroom hardware.
13) Install drying racks and window rails.
14) Flooring (15) Clearing and cleaning.
16) Furniture and home appliances (17) Curtains and bedding.
-
If you don't consider installing a bathtub, you can install the door first, because the bathtub is relatively large, and it is generally not easy to enter if the door is installed.
-
If a new home is equipped with natural gas, it is very reasonable to require the kitchen to be opened. Because this is not only responsible for the personal safety of users, but also, in terms of the use of natural gas, there are also obvious regulations. Gas can only be requested to be installed in a non-residential room.
If the kitchen is not open, then the kitchen will be connected to the living room and bedroom, and once there is a natural gas leak, the gas will be directly and slowly circulated into the bedroom, which will be a great safety hazard. <>
And if people, too, forget to turn off the gas while cooking, then a lot of carbon monoxide will be produced. If excessive carbon monoxide is absorbed, it will not only cause people to go into shock, but also seriously threaten people's lives. Moreover, in the process of cooking, a lot of oil smoke will be generated, and after the gas stove is turned on, the noise will be relatively large.
In this way, it will have a great impact on people's sense of living experience. <>
If you don't have a door in the kitchen, it will also affect people's sleep. It will make the whole room smoky, and it will also affect people's mood. If the kitchen is not open, it cannot be considered a confined space and does not meet the standards for the use of natural gas.
On top of that, if there is a gas leak and there is no door in the kitchen, the gas will slowly drift into the living room or bedroom. If there are smokers in the home, once the natural gas meets the open flame, it may also lead to the emergence of ** phenomenon. <>
Therefore, the scope of safety caused by this is a bit large, and it will even affect the safety of others. So in order to be responsible for your own personal safety, if you install natural gas, then you have to install a door in the kitchen. And when installing natural gas, it is best to install a matching alarm in the kitchen, so that once a natural gas leak occurs, the alarm can be alarmed in time.
It can also remind people of some safety awareness, which can well avoid accidents.
-
When to install the door?When many friends are renovating their homes, they don't know when to install the door. In fact, for the installation of the door, most of the time is done at a later stage.
Then, about the best time to decorate the door, let's take a look and hopefully help everyone.
Different people pairWhen to install the doorThere are different opinions. In home renovation, the door installation is completed at a later stage, that is, after the completion of the foundation works, the door is installed after the wallpaper is installed and the floor is installed, which is conducive to the maintenance of the floor line or door cover line.
However, many people who install doors will recommend that you install the door before installing the floor. Because the connection after installing the door must be connected by floor wires, etc.
When we buy a door, in addition to looking good, the door must match our decoration style so that it looks beautiful. For example, your home is decorated in a Chinese style. The door of this house must be made of Chinese wooden doors.
You can't opt for European doors. This is absolutely incompatible. The final appearance is also very ugly.
Once we have chosen the door, we definitely need to install it. So how should we install the door properly? First of all, you need to hire an experienced master, as the master can guarantee that the door will not be damaged.
Secondly, after the installation of the wooden door is completed, the protection and maintenance of the wooden door is also very important. Kicking when switching is very bad. It is necessary to avoid this approach.
1. Visual inspection. Look to see if the door is broken or whole.
2. Size check. Carefully inspect the door frame for non-square and no warping, and perform quality pre-control before installation.
3.Check the components. This is mainly to check whether the metal surface such as the hardware fixed to the door has been treated with anti-corrosion. If some doors are secured by fixtures, the surface needs to be checked for galvanization.
The above is brought to everyoneWhen to install the door, you can get it for free
-
Decoration is a very complex and huge project, and many owners are very blind and clueless when decorating, and do not know where to start. So is it better to paint first or install the door first? What is the order of house decoration? Let's take a look!
It is better to install the door first and then paint it, so that the workers can fill in all the gaps and form a whole. However, it is important to wrap the door well during construction to prevent the door frame from being soiled when painting.
The order of house decoration is how to link back:
1. Main body demolition and renovation: This is the first project of new house decoration, mainly including: wall demolition, wall building, shoveling wall skin and window replacement, etc.
2. Hydropower transformation: This is the most time-consuming and laborious project in decoration, and the quality of its construction will directly affect the comfort of living. In addition, if problems are found during construction, they should be raised and solved in time to avoid potential safety hazards.
3. Wrap riser: The sewer pipe should be packaged to increase the aesthetics.
4. Bricklayering: It is an indispensable process in masonry engineering, mainly including the wall and floor paving of living room, kitchen, balcony and bathroom.
5. Oilers brush wall paint: during construction, it is necessary to strictly follow the standards of the shed, otherwise it is easy to cause drumming or falling off.
6. Doors, cabinets, and hanging grinding ceiling installation: During operation, the ceiling should be installed first, and then the cabinet and door should be installed.
7. Floor installation: Keep the ground dry and clean when paving the floor.
8. Paving wallpaper: After the wallpaper is pasted, you can not open the window for ventilation immediately, and wait for 48 hours, otherwise it is easy to absorb moisture and reduce the adhesion between the wallpaper and the wall.
9. Install switch socket: leave a socket at the location of the socket in case of emergency.
10. Installation of lamps and hardware sanitary ware: lamps, bathroom pendants, toilets, and clothes rods should be installed in order.
11. Cleaning of wasteland: This is the first time to clean the new house after it is renovated, and it must be done carefully and carefully.
12. Furniture entry: After the above steps are completed, as long as the furniture is moved.
Article summary: Okay, about the first painting or the first door installation and what is the order of house decoration is introduced here, friends who need more information, please continue to pay attention to Qeeka Home, we will have better and more exciting content for you in the future.
There are no hard and fast rules, according to the conventional construction process, if the home is to pave the floor tiles, then it is necessary to lay the bricks first, if the door is installed first and then the floor tiles are pasted with the water used to print the door cover. >>>More
<> case of buying doors and floors, you may consult the ** business, and the reply you get is all human factors, and your own goods should be installed first. Regarding this problem, we can analyze it together and see what advantages and disadvantages there are in the first door installation and first installation flooring. >>>More
The decoration is to install the floor first, and there is a specific basis for theory and practice. >>>More
Generally, the door is installed after laying tiles first, and if the order is wrong, the installed door may not be easy to open.
In the later stage of general decoration, the problem of who installs the wooden door and floor first appears. Many people don't know who comes first and who comes after the renovation is finished, so let's judge it together today. >>>More