The excellent rate of water conservancy sub projects is considered excellent

Updated on physical education 2024-08-15
5 answers
  1. Anonymous users2024-02-16

    More than 70% of them have reached the excellent grade, and the larger the ratio, the better the quality of the completed projects of the enterprise. It is calculated as follows:

    The rate of excellent project quality = the number of unit projects or the completed area of housing buildings rated as excellent products in acceptance appraisal The number of unit projects or the completed area of housing buildings in all acceptance appraisals is 100%.

    The current statistical system stipulates that: The parent item only includes the projects that are accepted and appraised as qualified and excellent products, and does not include the projects that are identified as unqualified. In order to correctly reflect the quality of the completed projects in the reporting period, all the completed projects inspected in the reporting period can be taken as a whole, and the proportion of excellent, qualified and unqualified products can be reflected respectively.

  2. Anonymous users2024-02-15

    The quality assessment of important concealed units must all be excellent, with an excellent rate of more than 75% for unit projects and excellent for branch projects. The excellent rate of branch projects is 80%, and the unit projects are excellent.

  3. Anonymous users2024-02-14

    Legal analysis: more than 70% of them have reached the excellent grade, and the larger the ratio, the better the quality of the completed projects of the enterprise. It is calculated as follows:

    The rate of excellent project quality = the number of unit projects or the completed area of housing buildings rated as excellent products in acceptance appraisal The number of unit projects or the completed area of housing buildings in all acceptance appraisals is 100%.

    Legal basis: "Regulations of the People's Republic of China on the Administration of Acceptance of Water Conservancy Engineering Construction Projects" Article 28 The completion acceptance shall be carried out within one year after the completion of the construction project and the meeting of certain operating conditions. If the completion acceptance cannot be carried out on time, the time limit may be appropriately extended with the consent of the main friend of the completion acceptance, but the maximum shall not exceed 6 months.

    If the completion acceptance cannot be carried out within the time limit, the project legal person shall make a special report to the presiding unit for completion acceptance.

  4. Anonymous users2024-02-13

    Legal tung liquor analysis: all the main Xinshi inspection items meet the quality standards. The general inspection items are also in accordance with the standard pulley dispersion. The pass rate of the measured points of the test items is 80%.The test items are more than 0% qualified, and more than 0% are excellent.

    Legal basis: "Water Conservancy and Hydropower Capital Construction Project Unit Engineering Quality Assessment Standards" The main inspection items are all in line with the quality standards. The general inspection items are also in accordance with the standard regulations.

    The pass rate of the measured points of the test items is 80%.The test items are more than 0% qualified, and more than 0% are excellent.

  5. Anonymous users2024-02-12

    More than 70% of them have reached the excellent grade, and the larger the ratio, the better the quality of the completed projects of the enterprise. The calculation formula is: the rate of excellent project quality = the number of unit projects or the completed area of housing construction rated as excellent products in acceptance appraisal All unit projects or 100% of the completed area of housing construction.

    Legal basis: "Regulations of the People's Republic of China on the Administration of Acceptance of Water Conservancy Engineering Construction Projects" Article 28 The completion acceptance shall be carried out within one year after the completion of the construction project and the meeting of certain operating conditions. If the completion acceptance cannot be carried out on time, the time limit may be appropriately extended with the consent of the presiding unit for completion acceptance, but the maximum shall not exceed 6 months.

    If the completion acceptance cannot be carried out within the time limit, the project legal person shall make a special report to the unit that presides over the completion acceptance.

Related questions
16 answers2024-08-15

The quality acceptance of the branch engineering --- determined according to the professional nature of the construction project and the construction part; >>>More

4 answers2024-08-15

For example, if a water conservancy project is divided into 5 unit projects, the unit project codes are: 01; 02;03;04;05 >>>More

9 answers2024-08-15

A single project includes a sub-project, and a sub-project includes a sub-project, but the division of different projects is also different.

13 answers2024-08-15

One minute to understand the division standards of rail transit unit engineering, sub-engineering and sub-engineering.

8 answers2024-08-15

1. The acceptance of the quality of the sub-project and the sub-division (sub-division) shall be carried out on the basis of the self-inspection of the construction unit. The construction unit confirms that the self-inspection is qualified and submits an application for project acceptance, and the following technical documents and records shall be provided during the project acceptance: >>>More