Precautions required for construction units to enter gas stations and safety requirements for constr

Updated on society 2024-08-03
9 answers
  1. Anonymous users2024-02-15

    First, the construction site:

    Employees must wear safety helmets, work clothes and safety shoes when entering the construction site.

    Employees are strictly prohibited from smoking, drinking, chasing and teasing at the construction site.

    Protective glasses, gloves, etc. must be worn when welding, grinding, chiseling the ground, porcelain tiles, and other work that generates spatter. Protective equipment.

    About. Safety belts must be worn when working at heights above meters.

    Check the status of employees, it is strictly forbidden to take alcohol during work, and those with mental malaise caused by taking drugs due to illness are not suitable for on-site work.

    Night construction must have sufficient light illumination, and set up reflective and eye-catching signs, and set up warning lights if necessary.

    Safety warning signs must be hung at relevant locations on the construction site.

    The materials on the entire construction site must be placed neatly, and the site garbage, wood chips and other flammable materials must be cleaned up in time.

    The construction site must have a special place for stacking paint and mixing paint, and it must be covered with colored striped cloth when stacked in the open air.

    Workers participating in the construction should be familiar with the safety operation procedures of this type of work. Stick to your post during operation.

    Electricians, welders and other special operations personnel must have relevant qualifications before they can operate independently;

    Scaffolding, protective facilities, safety signs, and warning signs at the construction site shall not be dismantled without authorization. It needs to be disassembled, it must.

    Consent must be obtained from the person in charge of site safety;

    Holes, pits, ditches, lifting ports, wells and other dangerous places at the construction site should have fences and other protective facilities and obvious signs;

    The construction site must be set up with a cordon, fence, fire extinguisher, etc., and the cordon is generally required to be close to the construction personnel and scaffolding.

    racks and other operating equipment.

    meters can play a role in safety protection.

    The construction personnel must be able to use the fire-fighting equipment correctly and be familiar with the escape routes on the construction site.

    It is strictly forbidden to engage in all operations with open flames, such as the use of hand grinders and cutting.

    sparks generated by machines, welding machines, oxygen cutting and other tools.

    meters away. Fuel unloader.

    meters, aerial work in.

    Meters up to the limit are considered dangerous.

    area) to engage in all operations where sparks are generated. If there are special circumstances that must start a fire, the on-site construction safety responsibility.

    The person in charge of the project must apply to the person in charge of the project or the person in charge of the company's safety, and the above person in charge must be responsible for the safety of the gas station.

    Appoint someone to inspect and guide the relevant safety precautions on site to ensure that nothing goes wrong before the operation can be carried out. As.

    Hot work in the dangerous area of the gas station must be approved by the person in charge of Party A or Party A's safety department.

    It is strictly forbidden to use mobile phones in the dangerous area of the petrol station.

    Smoking and carrying fire into dangerous areas are strictly prohibited in the petrol station.

  2. Anonymous users2024-02-14

    I understand that you are talking about entering the area of construction.

    2. Sign a safety management contract, clarify responsibilities, and distinguish the safety management responsibilities borne by each other, so as to reduce risks.

    3. According to the characteristics of your construction operation, refer to the corresponding safety operation procedures, comprehensively consider the fire prevention requirements, and avoid fire accidents to the greatest extent.

    4. Equipped with necessary fire extinguishing equipment and emergency rescue facilities for emergency use. Note that your fire extinguishing equipment must be a fire extinguisher capable of extinguishing the combustion of oily substances.

  3. Anonymous users2024-02-13

    Pressure pipingProfessional qualifications, chemical and petroleum equipment installation qualifications. SpecificConstruction qualifications.

    Generally, spherical tank gas stations need to have the ability to install pressure pipes above GC3 (spherical tanks can be installed). Among them, the engineering design unit of the inter-provincial homework must hold Grade A design qualifications.

    The industry is divided into two types, such as oil and gas, chemical and petrochemical medicine, and all those with one of the above two contents can be engaged in the engineering design of hazardous chemicals. There are two kinds of engineering design certificates: Class A and Class B.

    All are issued by the Ministry of Construction.

    Nowadays, everywhere you go, you can see the large Sinopec.

    and PetroChina's gas station Li Zhichang. However, it is not so simple to open a gas station, you need to have a certain talent, so how can you build a gas station? Next, the safe transportation platform of Wei Luobang refined oil products will explain it to you.

  4. Anonymous users2024-02-12

    Need petrochemical qualifications pipeline quality housing construction qualifications steel structure qualifications, specific needs to see the requirements of the bidding documents, complete qualifications, the company's gas station transformation performance is more, can provide ruler cleaning and disturbance qualifications to support the group.

  5. Anonymous users2024-02-11

    Unified Standard for Construction Quality Acceptance of Construction Engineering (GB50300-2001)Acceptance Regulations for Construction Quality of Construction Foundations of Construction Projects (GB50202-2002)Code for Construction Quality Acceptance of Concrete Silver Acacia Branch Soil Structure Engineering (GB50204-2002)Code for Welding and Acceptance of Steel Bars (JGJ18-2003)Code for Construction Quality Acceptance of Masonry Engineering (GB50203-2002)Code for Construction Quality Acceptance of Building Ground Engineering (GB50209— 2002) building decoration engineering quality acceptance code (GB50210-2002), steel structure engineering construction quality acceptance code (GB50205-2001), as well as mechanical and electrical installation of the standard Feng Minfan.

  6. Anonymous users2024-02-10

    Hello, the construction of gas stations needs special information and good quality: pressure pipeline professional qualification, chemical and petroleum equipment installation qualification. The specific construction qualification depends on the scale of the gas station and the grade of the storage tank.

    Generally, spherical tank gas stations need GC3 or above pressure pipe installation qualification (spherical storage tanks can be installed). According to the Ministry of Construction's "Engineering Design Qualification Grading Standards" (Jianshe [2001] No. 22), the design qualification of the hazardous chemicals industry is only divided into two types: A and B. Among them, the engineering design unit of inter-provincial operation must hold a Class A design qualification, and the design unit of Class B qualification shall not engage in inter-provincial operation.

    In the business scope of designing gas stations, the hazardous chemicals industry is divided into two types: oil and gas, chemical, petrochemical, pharmaceutical, etc., and anyone with one of the above two contents can be engaged in hazardous chemical engineering design. Grade A and Grade B engineering design certificates are issued by the Ministry of Construction. Additional Information:

    Gas station construction specifications: 1. The location of the gas station 1. The gas station should be located in a place where vehicles can enter and exit conveniently and easily. 2. Gas stations can generally be divided into gas stations serving transit vehicles and gas stations serving vehicles in the city (residential, commercial, and industrial areas).

    The former should be located near the entrance and exit of the city and open to the Hucha line; The latter should be located near parking lots, shopping malls or city centers, and there should be buffer sections for cars entering and exiting gas stations. Second, the layout of the gas station 1, the gas station is only allowed to have one entrance and one exit; Under special circumstances, an entrance and exit can be set up under fire safety conditions; In the case of ensuring the internal passage of the gas station and not interfering with the nearby road traffic, an additional entrance or exit can be added. 2. Close to the gas station meter, a vacant space for the vehicle should be reserved.

    There should be a waiting space of 4 parking spaces between the entrance and the gas station. When there are lubricants and other service facilities, there should be a parking section with a length of 4 parking spaces, but the vehicles at the gas station should be separated from each other and should not interfere with each other. 3. The length of the front of the gas station shall not be less than 25m, and the depth of the gas station shall be 15m (including the sidewalk); For example, in the gas station used for container transport vehicles, the length of the front of the street shall not be less than 40m, the depth shall not be less than 15m, the width of the lane shall not be less than, and there shall be a sidewalk 3m wide.

    4. The service radius of the gas station should be 900 1200m. 3. The environment and fire safety of gas stations 1. The location of urban public gas stations should comply with the relevant provisions of the current national standard "Code for Design and Construction of Automobile Refueling and Gas Stations" (GB 50156-2002). 2. The sewage of the gas station should be discharged into the urban sewer void system after the oil interception facilities (the interception of wastewater, grease and residues), and when the conditions for discharging into the urban sewer are not available, a separate treatment pool and seepage system should be set up.

  7. Anonymous users2024-02-09

    <> safety management during the construction of the gas station is mainly responsible for the construction unit, but the construction party must cooperate closely and supervise the inspection. The construction party must stop the phenomenon that affects the quality and safety of the project. It should be recognized that the unsafe construction of the project will bring incalculable adverse effects to the project itself; It will bring hidden dangers to the safe operation of gas stations in the future.

    First, the basic requirements of the construction site with the town of Sui safety production management, the construction site safety management is to use the scientific knowledge of modern management in the on-site construction process to prevent dangers, accidents, losses and the jurisdiction, control and treatment of safety objectives. Construction site safety management mainly includes three aspects: construction site operation management, facility and equipment management and working environment safety management.

    Construction safety runs through all the time of production and life on site, from beginning to end. At every moment of the construction process, unsafe factors can arise and jeopardize safety. Construction safety runs through every construction process, every sub-operation, every type of work, and every member's production activities in the construction, involving all aspects of all spaces.

    Every production-related activity on the construction site may produce unsafe factors, so the safety management of travel on the construction site must run through the whole process of construction and all-round. 1. The principle of construction site safety management requires that the construction site fence, road construction, temporary power line installation, drainage, water supply facilities, sheds, offices and other temporary facilities, all kinds of construction equipment and facilities, safety publicity signs, safety protection facilities and other facilities and use should be in accordance with the premise of safety, fire protection, sanitation and environmental protection, and strengthen control in accordance with relevant national and local regulations and requirements, so as to be reasonable and orderly and facilitate construction. 2. The task of construction site safety production management (1) Correctly implement the national labor protection safety production policies, regulations and the requirements and instructions of superiors for safety work, so that the construction site safety production work can achieve clear goals, organization and implementation, implementation of training systems, and implementation of measures, so as to ensure on-site construction safety.

    2) Establish and improve the labor protection and safety production management system of the site; Formulate and collect various construction safety requirements related to construction and production at the construction site. (3) Publicize and organize safety education, improve employees' understanding of labor protection and safety production, and urge employees to master production technology knowledge and abide by rules and disciplines. (4) Strive to use the scientific knowledge, technology and methods of modern management to control the realization of safety objectives on the construction site.

    5) Properly handle the accident according to the principle of "four don't let go" and report to the superior.

  8. Anonymous users2024-02-08

    It is necessary to look at the scale of operation of the gas station and the level of the storage tank for the construction qualification of the practical project. Among them, the construction engineering design enterprises working across regions must have first-class design scheme qualifications, and the design scheme enterprises with Grade A qualifications are not allowed to engage in cross-regional work. The site where the gas station was built.

    The necessary special qualifications for the construction of gas station engineering include: professional qualification for second-class pressure vessel skills and petroleum equipment installation qualification for chemical plants. It is necessary to look at the scale of operation of the gas station and the level of the storage tank for the construction qualification of the practical project.

    Among them, the construction engineering design enterprise that works across regions must have the qualification of a first-class leakage meter scheme, and the design scheme enterprise with a grade A qualification cannot work across regions. The site where the gas station was built.

    The special qualifications required for the construction of gas stations are: professional qualifications for pressure pipelines and installation qualifications for chemical and petroleum equipment. The specific construction qualification needs to look at the scale of the refueling ridge and the level of the storage tank.

  9. Anonymous users2024-02-07

    Generally, spherical tank gas stations need to have the qualification of g3 or more for the installation of limb punch pipes (spherical tanks can be installed). Legal basis: Article 7 of the Construction Law of the People's Republic of China Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the State, apply to the people's ** construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department.

    Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit. Eighth application for a construction permit, shall meet the following conditions: (A) has been through the building of the hue hu project land approval procedures; (B) shall be handled in accordance with the law for construction project planning permits, has obtained construction project planning permits; (3) Where demolition is required, the demolition progress meets the construction requirements; (4) The construction enterprise has been determined; (E) to meet the needs of the construction of financial arrangements, construction drawings and technical information; (6) Specific measures for project quality control and safety.

    Construction administrative departments shall, within seven days from the date of receipt of the application, issue a construction permit to eligible applications.

Related questions
5 answers2024-08-03

The name of the construction document.

1. Checklist of statutory construction procedures in the early stage of project construction. >>>More

10 answers2024-08-03

The constructor is the technical organization and management personnel at the grassroots level. The main work content is to go deep into the construction site under the leadership of the project manager. >>>More

5 answers2024-08-03

The supervision of the archival documents and the construction unit are different, they will collect their own, even if you give him a copy is useless, the archiving materials must be the original, and like the application form and the inspection form, you have reported during the construction process, he must also have it. >>>More

7 answers2024-08-03

Answer: Construction qualifications are divided into three categories: 12 general contracting qualifications, 36 professional contracting qualifications, and 1 labor service qualification. There are multiple levels for each qualification.

9 answers2024-08-03

Comment one by one, write affirmation if you need to affirm, write some improvement opinions if you need to improve, and put forward good suggestions if you need to improve. This should be commented on according to the specific situation, such as: equipment condition, personnel status, environmental status, emphasis on safety precautions, etc.