How to write the application report for the verification of the completion plan of the construction

Updated on society 2024-02-27
5 answers
  1. Anonymous users2024-02-06

    Construction Engineering.

    Application (Registration) Time:

    Name of the construction unit (applicant unit) (with official seal) address.

    Name of the legal entity **.

    Contact**.

    Construction Project (Construction Project) Project (Project) Name Address.

    Project Manager's Name **.

    Construction project planning permit number Jian Zi No.

    Design unit Name of design unit Address.

    Name of the person in charge of the design **.

    Contractor Name of contractor Address.

    Name of the person in charge of construction **.

    The construction project approved by the construction project planning permit and its annex drawings has been completed, and the application for verification of the completion plan is hereby applied

    Apply for verification of the completion plan of the construction project.

    Plot area (m2) Total construction area (square meters) Living area (square meters) Public construction area (square meters) Industrial area (square meters) Garage area (square meters) Supporting area (square meters) Other area (square meters) Number of parking spaces Remarks.

    Verification and comparison of construction project completion plans.

    Building No. Floor Living Area (m2) Public Building Area (m2) Industrial Area (m2) Garage Area (m2) Supporting Area (m2) Other Area (m2) Number of Parking Spaces Remarks.

    Licensing Surveying Licensing Surveying Licensing Surveying Licensing Surveying Surveying Licensing Surveying T

    Total Gross floor area permitted.

    sq.m.). Among them: above-ground construction area (square meters), underground construction area (square meters) and the total construction area for verification to be applied.

    sq.m.). Including: above-ground floor area (sqm), underground floor area (sqm).

    Instructions for Verification of Applying for As-built Planning:

    Name of attachment and drawing:

    Applicant Declaration:

    1.The content of this form and all materials (including copies) submitted and their contents are true, legal and valid. If the legal liability arising from the falsification is borne by the applicant, it has nothing to do with the licensing or approving authority;

    2.The paper documents of the submitted design drawings correspond to the contents of the electronic documents one-to-one, and the expression of the same content is completely consistent.

    Fill in the items one by one as required.

  2. Anonymous users2024-02-05

    How to fill out the planning application form.

  3. Anonymous users2024-02-04

    This is not clear, so ask the department in charge.

  4. Anonymous users2024-02-03

    The project completion acceptance report is generally organized and filled in by the construction unit.

    First, to meet the relevant conditions for the completion and acceptance of the project;

    Second, the project completion acceptance procedures are that the construction unit after receiving the construction unit's project quality completion report, should organize survey, design, construction, supervision and other units and other relevant aspects of the experts to form an acceptance team, the development of acceptance plan;

    3. The acceptance shall be organized by the construction unit;

    Fourth, the completion report is completed by the construction unit, mainly the construction of the project, the general situation of the project, the information on the inside page, the quality of the data statistics and analysis, but also should be attached:

    1. Construction permit 2, construction drawing design document review opinion 3, quality assessment report of relevant units 4, project quality warranty 5, planning permit 6, relevant approval documents of the fire department 7, relevant experimental data 8, residential quality specification and warranty. The concealed project record should be reported to the engineer and the supervising engineer for on-site inspection and approval before the start of the next project, and signed and stored in the data file.

  5. Anonymous users2024-02-02

    Application for planning and acceptance of construction projects.

    Urban and Rural Planning Bureau:

    The first project undertaken by my unit ("Construction Project Planning Permit" No.: Jian Zi No. **), has been completed according to the requirements of the construction project planning, and the self-inspection and proofreading of my unit are in accordance with the construction drawings of the construction of the construction is correct, and you hereby apply to your bureau for planning and acceptance of the completion of the project undertaken by our unit.

    Construction unit:**

    May 10, 2014.

Related questions
4 answers2024-02-27

1. After the completion of the unit (sub-unit) project, the contractor shall organize the relevant personnel to self-inspect according to the quality standards and design drawings, and evaluate the test results, and fill in the "Project Completion Inspection Form" after meeting the requirements and attach the project acceptance report and complete quality data to the project supervision agency to apply for completion pre-acceptance. >>>More

11 answers2024-02-27

1. Introduction to the project.

2. Project cost. >>>More

9 answers2024-02-27

There is a proportion of random inspections for the filing of fire protection design of construction projects, while the fire protection design review of construction projects is 100% checked. >>>More

7 answers2024-02-27

It is agreed that the subcontracting project of the general contractor shall be approved by the construction unit. The general contractor, Company A, subcontracts part of the non-main project to Subcontractor B with corresponding qualifications, and has obtained the consent of the construction unit. According to the Building Act. >>>More

7 answers2024-02-27

There are in the building construction quality specifications.