How to start a small mineral water plant: What are the procedures and how much money is required?

Updated on Financial 2024-02-09
16 answers
  1. Anonymous users2024-02-05

    Bottled water cost analysis.

    Initially, it will be based on Nissan.

    The sales volume is 50,000 barrels, and the direct production cost per barrel of water is as follows:

    Electricity: 28kw hours 10 hours yuan kw 1224 yuan days.

    Rent: 80,000 yuan a year 1,365,216 yuan a day, decoration: 20,000 yuan a year 1,365 55 yuan a day, water bill:

    0 yuan day, barrel cover: yuan 50000 days 10000 yuan day, barrel lid sticker: yuan 50000 days 2500 yuan day, barrel bag:

    Yuan 50,000 days 3,000 yuan a day, heat shrink parafilm: 50,000 yuan a day 2,500 yuan a day, tax (fixed tax): 3,200 yuan a year 1 365 yuan a day, total cost:

    yuan, comprehensive cost per barrel: 50,000 yuan barrels.

    The materials required are:

    1. Water source exploitation certificate: For natural spring water, you must first go to the land department and the forestry department to apply for the water source exploitation certificate (whether the water body is qualified must have a two-year verification period).

    2. The production plant places equipment workshop, air purification workshop, quality laboratory, auxiliary site, and equipment for more than 6 people.

    3. Production equipment.

    4. Inspection equipment and product standard inspection report, health standard license, environmental protection license.

    5. Go to the local industrial and commercial bureau to apply for a business license.

    Tax registration. 6. After the production equipment and inspection equipment are complete, when it can be in the state of trial production, go to the local Bureau of Quality and Technical Supervision.

    The food department applies for a "production license", that is, a "QS certificate".

    7. Recruit workers (personnel health certificates), purchase product packaging containers, and register trademarks.

    Wait a minute. Pure water production enterprises need to apply for a business license, "water intake permit".

    Application materials: 1. The basis documents of the construction project (one copy);

    2. Application report for water intake permit (one original);

    3. Application report for acceptance of water intake project or facility (one original);

    4. Approval document for water intake permit application (one original);

    5. Construction and trial operation of water intake projects or facilities (one original);

    6. Measurement certification of water metering facilities (one copy);

    7. Construction and trial operation of water-saving facilities (one original);

    8. Implementation of sewage treatment measures (one original);

    9. During the trial operation, the water quality test report (one copy) issued by the corresponding qualified unit;

    10. Barrage and other water storage projects also need to submit a water storage dispatching operation plan (one original);

    11. The groundwater intake project should also submit a comprehensive result map of the well pumping test and a water quality analysis report (a copy).

  2. Anonymous users2024-02-04

    No matter how small the mineral water plant is to have a water source well, maybe you have it, I don't count, the new well investment is quite large, the filling production line is required, you can't fill the bottle manually, if the bottled water investment is a little less, if the bottled water filling line investment will be 400,000, the bottled water filling line 8 to 120,000. The procedure is to first go to the local ** Geology and Mining Bureau to handle the mineral water identification, obtain the appraisal certificate, and then go to the Geology and Mining Bureau to apply for a mining license, you can go to the Industrial and Commercial Bureau to apply for a business license, to the health and epidemic prevention station to handle the health license, and finally to the tax bureau for tax registration, you can start a business.

  3. Anonymous users2024-02-03

    First of all, a big premise is that you have to have water resources, if you don't have resources you can't do a water plant, so the first step is to test the water source.

    Second, the plant area is not less than 100 square meters, which is the minimum.

    Third, a full set of equipment is needed, and one equipment can not be less: mineral water production equipment, filling machine, inkjet printer, labeling machine, packaging machine, what else is ozone, air shower, air purifier, lamp inspection, bottle cap sterilizer.

    Fourth, if you want to make a small bottle of water, it should be about 200,000, or about 2,000 per hour, so it's not so simple to make a small bottle. To contact me, please click on my profile picture.

  4. Anonymous users2024-02-02

    I have a small bottling plant of my own, with an investment of at least 1.4 million. How much big flicker to sell equipment. There is too much money for other unseen.

  5. Anonymous users2024-02-01

    How can you start a small mineral water plant?

  6. Anonymous users2024-01-31

    Raise the reward to 500 and I can tell you all about the guarantee in one step, legally recognized, and the lowest cost.

  7. Anonymous users2024-01-30

    The equipment of the mineral water plant is only 70,000 or 80,000 yuan per hour, which is enough for one person, and the main thing is that the person who delivers the water depends on the situation.

  8. Anonymous users2024-01-29

    How to open a water plant, what do you need to prepare? It is best to rent a warehouse in a place with drainage location, and then decide the size of the warehouse according to your own capital budget.

    All kinds of documents required for processing, (production license is the most important), health certificate, etc.

    When leasing factory land, it is necessary to reasonably plan the utilization rate, such as equipment floor area, other office area, etc.

    Equipment selection and installation. Of course, the water quality of the water plant should be the best, and the good water quality must be equipped with a certain quality of equipment.

    You can decide according to your actual situation.

  9. Anonymous users2024-01-28

    At least one million, the factory, the canning production line, the approval of all kinds of certificates, do marketing expenses.

  10. Anonymous users2024-01-27

    How big is the minimum plant to get a production and operation license?

  11. Anonymous users2024-01-26

    Useful certificates, as well as QS certification, business license and tax registration are required.

  12. Anonymous users2024-01-25

    Starting at 200,000 yuan, the rest rely on loans.

  13. Anonymous users2024-01-24

    I seem to need a health permit.

  14. Anonymous users2024-01-23

    Summary. The following conditions and procedures need to be met for a mineral water plant: Mineral water production qualification:

    The following conditions and procedures need to be met for the mineral water plant: with the qualification of sedan mineral water production: it is necessary to apply for the mineral water production license issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China.

    It is necessary to obtain relevant licenses such as industrial and commercial business licenses, tax registration certificates, and organization certificates.

    What approval procedures are required for bottled water production?

    The following approval procedures are required for bottled water production: Industrial and commercial business license: You need to go to the local industrial and commercial administrative department to apply and obtain an industrial and commercial business license.

    Tax registration certificate: You need to go to the local tax bureau to apply for a tax registration certificate. Organization ** Certificate:

    You need to go to the local administrative department for industry and commerce to apply and obtain the organization certificate. Bottled drinking water production license: You need to go to the local health administration department to apply for a bottled drinking water production license.

    For example, safe production is allowed to hold the dust chain, etc.

    Specific handling procedures.

    The specific procedures for handling bottled water production are as follows: First, go to the local industrial and commercial administrative department to apply for business licenses, organization certificates and other relevant licenses. Next, go to the local tax office to apply for a tax registration certificate.

    Thirdly, go to the local health administration to apply for a bottled drinking water production license. When applying, it is necessary to raise the relevant information such as the production equipment, production workshop, and production process of Yinxian bottled water, and accept the on-site slag inspection. In the process of applying for a bottled drinking water production license, environmental protection procedures need to be approved.

    It needs to comply with the relevant regulations of the national environmental protection department, such as emission standards. After all the relevant licenses are completed, the safety production license needs to be approved. It needs to comply with relevant national safety production regulations.

    After the most exciting, the equipment installation, commissioning, acceptance and other work are carried out. Once this is done, the production of bottled water can begin. The above are the specific procedures for the production of bottled water, and the specific situation also needs to be operated according to the relevant local regulations.

  15. Anonymous users2024-01-22

    1. The QS certification of the production license should be handled by the Quality and Technical Supervision Bureau.

    2. The health license is handled by the Food and Drug Administration.

    3. The health certificate of the employee is handled at the Health Bureau.

    After the above three certificates are approved, you can apply for the following documents: 1. The business license shall be handled at the Industrial and Commercial Bureau. 2. The tax registration certificate shall be handled by the tax bureau.

    Limited Liability Company Application Materials:

    1. Application for Company Registration (Filing) signed by the legal representative of the company.

    2. The "Certificate of Designated Representative or Co-Entrusted Person" signed by all shareholders and a copy of the ID card of the designated representative or entrusting **person; The matters to be handled, the authority, and the authorization period of the designated representative or the co-entrusting person shall be indicated.

    3. Articles of association signed by all shareholders.

    4. A copy of the shareholder's qualification certificate or the identity certificate of the natural person.

    5. Appointment documents of directors, supervisors and managers (the resolution of the shareholders' meeting shall be signed by the shareholders, and the resolution of the board of directors shall be signed by the directors of the company) and a copy of the identity certificate.

    6. The appointment documents of the legal representative (the resolution of the shareholders' meeting shall be signed by the shareholders, and the resolution of the board of directors shall be signed by the directors of the company) and a copy of the identity certificate.

    7. Notice of Pre-approval of Enterprise Name.

    8. If laws, administrative regulations and decisions stipulate that the establishment of a limited liability company must be submitted for approval, a copy of the relevant approval documents or license shall be submitted.

    9. The business scope of the company applying for registration has laws, administrative regulations and decisions that must be submitted for approval before registration, and the relevant approval documents or copies of the license or license certificates are submitted.

    10. Letter of Commitment.

    11. Proof of residence use.

  16. Anonymous users2024-01-21

    What procedures and procedures do I need to open a mineral water factory?

Related questions
5 answers2024-02-09

First of all, the site, how large and large the plant, such as 2000 bottles of drinks or water per hour, the minimum plant requirement is 800 square meters, and there is really no 500 square meters. >>>More

11 answers2024-02-09

Establish rules and regulations first, let yourself win at the starting line, so that you will save a lot of trouble in the future, and what will save you more trouble is that there are rules and regulations made by experts for your situation, so that you can use them, so that you can use them 100% worry-free and rest assured, and you don't have to write it yourself. Under the "Introduction to Labor Contracts", you can find this collection of management systems that allow you to do it once and for all.

4 answers2024-02-09

Experimental equipment: 2 glass rods with equal parts of water and juice. >>>More

35 answers2024-02-09

To understand a person, the first thing is to observe his words, observe his deeds, understand his subtleties, and understand his meaning. >>>More

14 answers2024-02-09

In general, patients can protect their kidney function through diet, exercise, lifestyle, and not taking medicine indiscriminately. >>>More