Super difficult math problems for 6th grade! Hurry!!

Updated on educate 2024-02-12
7 answers
  1. Anonymous users2024-02-06

    Answer: After getting this kind of question, it is to add up all of them, which has become a habit, but after adding up this question, I found that the existing ones are counted 3 times, and some are 2 times, and I don't know how many times to divide it by! After careful observation, it turns out that it is actually 2,4,5 squads that are counted 2 times, but the efficiency of these three teams is known to us, so adding a 2,4,5 is not all counted 3 times?

    So the sum of the efficiency of the five squads is: (1 12 + 1 7 + 1 8 + 1 42 + 1 8) 3 = 1 6, so it takes six days for the five squads to work together to complete the project.

  2. Anonymous users2024-02-05

    A small squad x days.

    Two squads y day.

    Three squads z day.

    Four squads for M days.

    Five squads n days.

    1/x + 1/y +1/z= 1/12

    1/x + 1/z+ 1/n=1/7

    1/y+ 1/m + 1/n= 1/8

    1/x+ 1/z +1/m=1/42

    Then count again.

    1 x+1 y+1 z+1 m+1 n will do.

    You see if you have made any mistakes in your question, and I will slowly calculate it for you.

  3. Anonymous users2024-02-04

    1 (25) ton is 1 5,60 m less than 20 t 1 5,60 m less than (90) 1 3

    2 The price of a refrigerator is now 1 10 lower than the original price, here (the original) is regarded as "1", and the current price is the original (9) (10).

    3. The upper bottom of a trapezoidal shape is 1 6, the lower bottom is 1 5 meters, the height is 1 2 meters, and its area is (11 120) square meters.

    4. A section of wood is 6 meters long, the first time it was used 1 3, the second time it was used 1 3 meters, and there were (11 3) meters left.

    Second, the calculation should be simple if it can be simple.

    3. Solve the problem.

    1. A bottle of drink, the first time to pour out the total number of 1 2, the second time to pour out the total number of 1 3, there are still 50 ml left, how many ml of this bottle of drink was original? (1-1/2-1/3)*x=50 x=300

    2. The turnover of Parkson Mall in the first quarter was 52 million yuan, an increase of 1 10 in the second quarter compared with the first quarterWhat was the turnover in the second quarter? 5200*(1+1/10)=5720

    3. Build a 500-meter-long canal, which has been repaired to a total length of 2 5, how many meters are left to be repaired? 500*(1-2/5)=300

    4. The students planted trees in Qianling Mountain, 3 8 of the total number were planted on the first day, 1 3 3 were planted on the second day, 360 more trees were planted on the first day than on the second day, how many trees are there in this batch? (3/8-1/3)*x=360 x=8640

  4. Anonymous users2024-02-03

    20(1+1/5)=24 60/(1-1/3)=90

    Original price 9 10

    50 (1-1 2-1 3) = 50 (1 6) = 300 ml 5200 * (1 + 1 10) = 5200 * 11 10 = 57.2 million yuan 500 * (1-2 5) = 500 * 3 5 = 300 meters 360 (3 8-1 3) = 360 (1 24) = 8640 pieces.

  5. Anonymous users2024-02-02

    1: (24) tons, (90) meters.

    2: (original price), (9) (10).

    3: (11,120) square meters.

    4: (11 3) m.

    Two: 5 8 10 9-5 8 = 5 72

    3 4-1 2-3 8) 5 8 = (-1 5) three: 1:50 (1-1 3) (1-1 2) = 150 ml 2:

    5200 * (1 + 1 10) = 57.2 million yuan 3: 500 * (1-2 5) = 300 meters.

    4: 360 (3 8-1 3) = 8460 trees.

  6. Anonymous users2024-02-01

    The third question: 1: 50 divided by 1-half plus one-third = 300 ml 2: 5200 times 1 plus one-tenth = 57.2 million yuan.

    3: 500*(1-2 5) = 300 meters.

    4: 360 (3 8-1 3) = 8640 (tree).

  7. Anonymous users2024-01-31

    Elder brother.. Your question... It's excellent.

Related questions
23 answers2024-02-12

The area of the first square is the square of (40 4), i.e., 100 square centimeters, and the area of the second square is half the area of the first square, i.e., 1 2, therefore, the area of the sixth square is. >>>More

24 answers2024-02-12

1。A project, A alone does 10 days to complete, B alone does 15 days to complete, A first does 3 days, and the rest of the two work together, how many days does it take to complete? How many days did A work? >>>More

32 answers2024-02-12

Solution:1Let's say he made x dollars.

Solution: x=43625 >>>More

29 answers2024-02-12

You look up the format of the research report this, and the first one that will appear will appear "The format of the research report knows". >>>More

14 answers2024-02-12

Process a batch of parts, A first processes two-fifths of this batch of parts, and then. B processed the remaining nine deaths. It is known that the number of processed parts of B is 200 less than that of A, how many parts are there in this batch? >>>More