-
1. The director (director) of the Housing and Urban-Rural Development Bureau (Housing and Construction Committee) of prefecture-level cities is a department-level cadre, some places are called bureaus, some are called committees, but the functions and powers are the same.
2. The level of director (director) of the Housing and Urban-Rural Development Bureau (Housing and Construction Committee) of prefecture-level cities is: cadres at the department level.
3. The Construction Committee and the Urban Construction Bureau are the administrative departments in charge of regional construction, responsible for the planning, examination and approval, and project supervision of the region's capital construction.
-
The director of the urban construction bureau at the municipal level is a cadre at the department level. Urban construction is based on planning, through construction projects to transform the urban living environment, and to build various material facilities in the urban system.
The content of urban construction includes the physical behavior of various material facilities in the urban system, which is the basic and phased work to create good conditions for the management of the city, and is a special economic work with obvious process and periodicity.
The main responsibilities of the Urban Renewal Authority are:
A) the implementation of national and provincial policies and laws and regulations on the construction and management of urban municipal facilities, landscape landscaping, city appearance, environmental sanitation, urban patriotic health, public facilities and other infrastructure; Research and formulate relevant policies and normative documents in our city, and organize the implementation and supervision and inspection.
2) Formulate and improve the medium and long-term development plans and annual plans for the construction of urban infrastructure, public facilities, landscape landscaping and city appearance, and organize the implementation and supervision and inspection.
3) Responsible for municipal engineering, landscape engineering, environmental engineering, public utilities project construction bidding, supervision, quality, completion acceptance, safety and other construction administrative work; Responsible for the use of urban construction funds, in conjunction with the financial, price and other departments to study and formulate the charging policies and standards of urban construction funds; Participate in the site selection and fixed-point work of major construction projects.
4) Responsible for the maintenance and management of urban roads, bridges, street lights, greening, drainage, drainage, sewage treatment and other municipal facilities, landscape architecture, environmental sanitation and public utilities, and urban public passenger transport.
5) Responsible for the management of municipal construction, public utilities construction, landscaping.
Construction market, the city's municipal construction and landscaping design, construction units for qualification review, responsible for guiding the management of urban construction files.
6) Responsible for the review, approval and protection supervision of historical and cultural cities and national and provincial scenic spots.
7) in conjunction with the relevant departments to review the urban infrastructure project proposals and public, public facilities construction, urban municipal engineering design scheme, and organize the implementation and supervision and inspection.
8) To study and formulate a scientific and technological development plan for urban construction and management, organize scientific and technological research and transformation of achievements, and promote the application of new technologies, new materials and new processes.
9) Responsible for the construction of the leadership group of the directly subordinate units according to the cadre management authority; Responsible for the ideological, organizational, work style construction and spiritual civilization construction of the Party in the system.
10) Complete other tasks assigned by the city.
The division of labor with the Municipal Water Conservancy Bureau in the urban flood control work is: the Water Conservancy Bureau is responsible for formulating the overall plan for urban flood control, liaising and coordinating the work of relevant departments, handling the daily work of the flood prevention and drought relief headquarters, and reinforcing the river embankment;
The Urban Renewal Bureau is responsible for the dredging of drainage channels and mountain flood ditches in the urban area; Handle the daily work of the Chaoyang Urban Flood Control Office, and complete the relevant work assigned by the Flood Control and Drought Relief Headquarters.
-
It should be a department-level cadre, equivalent to the deputy county magistrate, deputy secretary or the like of a county.
Urban construction, as the name suggests, refers to the work of urban construction.
-
The director of a prefecture-level city is at the department level.
The director of a county-level city is at the level of deputy director.
-
Zhengke, deputy director level, is responsible for the development of the city, the planning and construction of the city.
-
Divisional level, urban planning. Construction.
-
It's a big fat piece of meat, and the oil and water are too big.
-
It belongs to the positive game level. It's a difference in oil and water. Whoever does it gets rich!
Urban. City building!
-
The director of the construction bureau is higher than the director of the construction committee of the prefecture-level city. The director of the housing and urban-rural development commission of a prefecture-level city is at the department level, and the administrative level of a prefecture-level city is at the department level.
The main responsibility of the Construction Committee is to implement the laws, regulations, decrees and related strategies, industrial policies and reform plans formulated by the state and the city on urban and rural construction, engineering construction, construction, real estate development and building materials industry, and formulate corresponding measures in combination with the actual situation of the district to promote the development of various undertakings above the district.
-
The director of the prefecture-level municipal construction committee is the division level, the county and district generally set up the urban construction bureau, which is the section level, and the construction committee and the urban construction bureau are the regional construction administrative departments, responsible for the capital construction planning, examination and approval, project supervision and other matters in the region.
-
The sub-provincial city district level is the deputy department level.
-
1. The construction bureau is not the standard configuration of the first class, and the general standard configuration is only the housing and urban-rural development committee (department, bureau);
2. Therefore, it is impossible to determine the level without determining which level of the ** subordinate to the construction bureau. For example, the urban construction bureau of a prefecture-level city is generally at the level of the county department or the level of the deputy county department.
1.Surprise "Sun Tzu's Strategy": Attack it unprepared, surprise. 〉 >>>More
Let's talk about the easiest way to do this: use WinRAR encryption, right-click on the file or folder, add or compress (A), Advanced, set the password, then enter the password, put the checkmark in front of the encrypted file, click OK, OK! Third-party software can also be borrowed >>>More
A TV series with the theme of **post-life, unraveling the memory of history and self-esteem in the lives of post-generations, although sad, is a good medicine. >>>More
First of all, you have enough bandwidth; Then you should have the speed limit of the tree; After that, mark the packets of this IP address, and let the packets of this IP address pass first when the rate is limited. This is my idea, there is no experiment.
<>I think it is clearer to understand according to the above diagram, the international sponge city is also called "low-impact development stormwater system", which mainly includes 7 aspects: >>>More