What are the items generally included in the annexes of the project completion inspection form

Updated on healthy 2024-03-25
13 answers
  1. Anonymous users2024-02-07

    That is separate from the G01 form The project completion inspection form, the general situation is provided to you by the supervisor, right? After you fill out the form. The attachment is mainly the acceptance of each inspection batch in your sub-project **. Both.

  2. Anonymous users2024-02-06

    To: We have completed the project according to the requirements of the contract, and passed the self-inspection, please check and accept.

    Contractor (Chapter):

    Project Manager: Date: YYYYYYYYYYYYYYYYYYYYYYYYYYY

    Review opinion: after preliminary acceptance, the project.

    1) Comply with the requirements of current laws and regulations in China.

    2) Conform to the current engineering construction standards in China.

    3) Conform to the requirements of the design documents.

    4) Comply with the requirements of the construction contract.

    To sum up, the preliminary acceptance of the project is unqualified or not, and it is not possible to organize formal acceptance.

    Project Supervision Agency (Chapter):

    Supervising Engineer:

    Date: YYYYYYYYYYYYYYYYYYYYYYYY

  3. Anonymous users2024-02-05

    Don't understand what you're saying? Be detailed!

  4. Anonymous users2024-02-04

    The attachments to the inspection form of engineering materials include factory quality certification documents, inspection records, entry test reports, and sample entrustment forms.

  5. Anonymous users2024-02-03

    Answer]: a, b, d

    The project completion acceptance report should also be accompanied by the following documents: (1) construction permit. (2) Review opinions on construction drawing design documents.

    3) The acceptance team searches for the project completion acceptance opinions signed by the virtual staff. (4) Municipal infrastructure projects should be accompanied by quality inspection and functional test data. (5) The construction unit signed the project quality assurance book.

    6) Other relevant documents stipulated by laws and regulations.

  6. Anonymous users2024-02-02

    Answer]: B2022 Textbook P294 2021 Textbook P288 2020 Textbook P287.

    The completion report refers to the document that the construction unit reports to the construction unit after the project meets the completion conditions, and submits it to the construction unit to organize the completion acceptance. The condition for submitting the completion report is that the construction unit has completed all the contents of the contracted project stipulated in the contract, and organized relevant personnel to carry out inspection and acceptance by itself, and all of them meet the requirements and quality standards of the project. The production department of the construction unit shall fill in the completion report, and the project management department of the construction unit shall organize the relevant personnel to review and confirm that the completion conditions are met, and the legal representative shall sign and the legal person shall seal and submit it to the supervision and construction unit for approval.

  7. Anonymous users2024-02-01

    1. The project completion inspection form.

    It shall be filled in by the construction party and handed over to the supervision unit. After the completion of the project, together with the "completion report" submitted to the supervision for inspection. The three pieces of information in the annex must be filled in after the completion of the project, and they are also the information to be verified by the quality supervision station. One copy for the construction unit and one copy for the supervision unit.

    Project completion inspection form.

    Project Name: Number:

    To: (Supervision company) we have completed the project according to the requirements of the contract, passed the self-inspection, please check and accept.

    Attachment: 1. "Unit (Sub-unit) Project Quality Control Data Verification Record".

    2. "Unit (Sub-unit) Engineering Safety and Function Inspection Data Verification and Main Function Spot Check Record".

    3. "Unit (Sub-unit) Project Perception Quality Inspection Record".

    Contractor (Chapter):

    Project manager. Date.

    Review opinion: after preliminary acceptance, the project.

    1) Comply with the requirements of current laws and regulations in China.

    2) Conform to the current engineering construction standards in China.

    3) Conform to the requirements of the design documents.

    4) Comply with the requirements of the construction contract.

    Based on the above, the preliminary acceptance of the project is unqualified, and it is not possible to organize formal acceptance.

    Project Supervision Agency.

    Chief Professional Supervision Engineer.

    Date. I saw it clearly, and the attachment was 123 in total

  8. Anonymous users2024-01-31

    What is not written in the attachment? The attachment is to attach the information you must submit to the back of the inspection form, and indicate the content, name and quantity of the attachment on the inspection form. Then submit the inspection form together.

  9. Anonymous users2024-01-30

    1. Unit (sub-unit) project quality control data verification record 2, unit (sub-unit) project safety and function inspection data verification and main function spot check record 3, unit (sub-unit) project perception quality inspection record.

    4. Project quality assessment report.

    5. Survey document quality inspection report.

    6. Quality inspection report of design documents.

    7. Construction safety assessment of the unit's project.

    8. The quality acceptance record of the elevator installation division.

    9. Fire protection acceptance documents or approval documents.

    10. Acceptance documents for gas projects.

    11. Quality warranty for housing construction projects.

    12. "Residential Quality Assurance" and "Residential Instruction Manual" for commercial housing

    13. Unit (sub-unit) project quality acceptance record, minutes 14, construction project quality supervision and acceptance opinion.

    15. Approval of construction project completion acceptance file.

    16. Approval documents for construction project planning acceptance.

    17. Environmental protection acceptance documents or approval documents.

    18. Completion and acceptance report of construction project.

    19. Record form for completion acceptance of housing construction projects and municipal infrastructure projects.

  10. Anonymous users2024-01-29

    The project inspection form is also called the engineering inspection application approval form The contractor applies in writing for the form used by the supervisor to inspect the quality of the project on site, and the contractor fills in the column of "the contractor's submission date, time and signature". In general, a written declaration must be made in the following cases:

    1) After the completion of the project that needs to be metered and paid;

    2) Before concealed engineering coverage;

    3) Phased acceptance;

    4) After the completion of the project or process that the supervising engineer instructs or notifies the contractor, it is required to declare in writing.

    5) After the contractor completes the field lofting, it shall apply for supervision to use this form when inspecting the site.

    Do you see if it works for you?".

  11. Anonymous users2024-01-28

    Need. As long as it is in the construction of the project, after the completion of each construction procedure and each construction process, the inspection of each sub-project must be carried out. After the supervision or the owner's representative inspects and accepts the sub-project, the construction of the next process can be carried out.

    However, it is necessary to fill in the project inspection form for each sub-project. Examples:

  12. Anonymous users2024-01-27

    No, you don't. The inspection form is only a procedure between the construction unit and the supervision unit, and it is not filed as engineering data. Acceptance materials include:

    Unit project acceptance record - branch project acceptance record - sub-division project acceptance record - sub-project acceptance record - inspection batch acceptance record can be. After the completion of all parts of an inspection batch, it is necessary to summarize the acceptance of the sub-project, and fill in the inspection form to report to the supervisor for inspection.

    According to the Construction Law of the People's Republic of China, the quality acceptance of the sub-project shall comply with the following provisions:

    1.The quality of the main control project has been qualified by sampling inspection;

    2.The pass rate of sampling inspection of the measured (allowable deviation) items in general projects should reach 80%, and the maximum deviation value of the over-deviation point should be within the range of times of the allowable deviation value;

    3.The main engineering materials are qualified for acceptance and re-inspection, and the test blocks and specimens are qualified;

    4.The quality assurance data of the main engineering materials and the relevant test and testing data are complete and correct; It has a complete construction operation basis and quality inspection records.

    Extended information: What should be the conditions for the acceptance of the unit project?

    1.Complete the construction project design and the content stipulated in the contract;

    2.There are complete technical data and construction management data;

    3.There is a test report on the entry of the main building materials, building accessories and equipment used in the project;

    4.There are quality qualification documents signed by survey, design, construction and supervision units;

    5.It is completed according to the design content, and the project quality and use function meet the design requirements specified in the specification.

    What is the acceptance procedure for the organization of the unit project?

    1.After the construction unit receives the acceptance report, the project leader of the construction unit organizes the construction, and the project leader of the design, supervision and other units carries out the acceptance of the unit project.

    2.If the construction unit contracts part of the project separately, the construction unit does not consider the subcontracting matters, and only includes the subcontract into the work content of the construction unit for unified acceptance.

    3.If the construction unit directly bids for a sub-project or sub-project, the general contractor shall accept the application, and Party A shall subcontract and pay a certain coordination fee.

    4.After the quality acceptance of the unit project, the construction unit shall generally submit the completion acceptance report and related technical information documents to the construction administrative department for the record within 15 days.

  13. Anonymous users2024-01-26

    Yes, complete the summary and acceptance of the relevant units! ~~

Related questions
10 answers2024-03-25

Operating costs are also known as operating costs, operating costs. It refers to the cost of goods sold or services provided by an enterprise. It generally includes rent, utilities, materials, labor, ......The operating costs of industrial enterprises include cost of sales, sales tax, and period expenses.

10 answers2024-03-25

I just asked an anonymous question, I don't know if it's you. I'm from Huazhong University of Science and Technology, but I'm not a graduate student in telecommunications. In order to ensure the quality of graduate enrollment and the smooth progress of the enrollment work, the 2009 master's enrollment interview plan of the Department of Telecommunications is specially formulated according to the basic requirements and admission principles of the Ministry of Education and the school for the preliminary examination results of candidates participating in the re-examination >>>More

7 answers2024-03-25

1.Contrast

The basic idea of contrast is to avoid the elements on the page being too similar. If the elements (font, color, size, line weight, shape, space, etc.) are different, simply make them very different. Comparison can make the message more accurate, and the content is easier to find and remember. >>>More

6 answers2024-03-25

1) "The name or name and domicile of the parties" refers to the name and domicile of natural persons and the names and domiciles of legal persons and other organizations. The name of a natural person refers to the official name approved and registered by the household registration management authority, and the domicile of a natural person refers to the main place where a natural person lives and activities for a long time. The name of a legal person or other organization refers to the name that has been approved and registered by the competent registration authority, and the domicile refers to the place where their main office is located. >>>More

13 answers2024-03-25

Plastering and scraping putty.

It is a process or step to treat the wall, and they can also make the wall more beautiful or stable. Some people think that plastering and putty scraping are the same type of thing, so it is natural to compare them and want to understand the difference between plastering and putty scraping before deciding to decorate on their own. >>>More