    DLT 5218-2012 220kV 750kV substation design technical specification 2, when the 330kV 750kV substation is constructed according to the operation management mode of manned or less people on duty, the main control room, computer room and relay chamber can be set up respectively, and the relay cab can be arranged in the vicinity of the power distribution device or set up according to the electrical unit.

    3. When the 330kV 750kv substation is constructed according to the unmanned operation management mode, the computer room and the relay room can be set up respectively, and the computer console can be set up, and the relay room can be arranged in the vicinity of the power distribution device or set up according to the electrical unit.

    KV substation should be built according to the unmanned operation management mode, and computer monitoring system equipment and relay protection equipment should be arranged in the same room; When the relay protection equipment is decentralized, the protection equipment should be combined with the type of power distribution device to adopt a centralized or decentralized layout.

  2. Anonymous users2024-02-05

    1. All work carried out at a height of 2 meters or more shall be regarded as work at height. All work that can be done in advance on the ground must be done on the ground, and work at height should be minimized.

    2. Personnel who work at height must be in good health, and those who suffer from mental illness, epilepsy, high blood pressure, heart disease, and other diseases that are not suitable for working at height are not allowed to participate in work at height. When it is found that the staff has drunk alcohol or is not energetic, it is forbidden to climb the height.

    3. Work at height must first build scaffolding or take measures to prevent the team from falling.

    4. Work on the crest of the dam, steep slope, roof, cliff, tower, suspension bridge and other dangerous edges, and the empty side should be equipped with safety nets or protective railings, otherwise the staff must use safety belts.

    5. Ice, snow, gravel and mud on cliffs, steep slopes or sidewalks must be cleaned frequently, and a 1-meter-high railing must be set up on the outside side. Set up 18 cm high side panels or mounds on the inside of the railing to prevent falling objects from injuring people.

    6. When working on scaffolding without scaffolding or without railings, with a height of more than one meter, safety belts must be used, or other reliable safety measures must be taken.

    7. The seat belt should be inspected before use, and the static load test should be carried out regularly (every 6 months), the test load is 225 kg, the test time is 5 minutes, check whether there is deformation, rupture, etc. after the test, and make a test record. Unqualified seat belts should be dealt with promptly.

    8. The hook or rope of the safety belt should be hung on a strong and firm member or a wire rope specially used for hanging the safety belt. It is forbidden to hang on moving or unstable objects.

    9. Tool bags should be used for work at height. Larger tools should be tied to a firm member with a rope and are not allowed to be placed randomly to prevent accidents from falling from a height.

    10. When carrying out work at height, except for the relevant personnel, no one else is allowed to walk or stay under the work place, and fences or other protective devices should be installed under the work place to prevent falling objects from injuring people. If working on a grating platform, planks should be laid to prevent tools and equipment from falling.

    Ten. 1. Tools and materials are not allowed to be thrown up and down, and they should be tied down or up with ropes to avoid injuring the staff below or destroying the scaffolding.

    Ten. 2. When the upper and lower floors are working at the same time, a tight and firm protective partition, canopy or other isolation facilities must be erected in the middle, and the staff must wear safety helmets.

    Ten. 3. In winter, work at open air heights below minus 10 degrees, and if necessary, there should be a heating rest place near the construction area, and the heating equipment should be managed by a special person, and attention should be paid to fire prevention.

    Ten. 4. In strong winds of level 6 and above, as well as bad weather such as heavy rain, thunder, and fog, open-air high-altitude operations should be stopped.

    Ten. 5. It is forbidden to work on unstable structures (such as asbestos tile roofs). In order to prevent false boarding, warning signs should be hung at the necessary points of such structures.

  3. Anonymous users2024-02-04

    It can be divided into:

    Feasibility study stage, system scheme stage, design implementation - design stage, design solid line - manufacturing joint test stage, trial operation stage, maintenance stage.

    At each stage, data can be established to standardize; For details, see pmpbok

  4. Anonymous users2024-02-03

    Article 286 of the Criminal Law of the People's Republic of China stipulates that those who violate state provisions by deleting, modifying, adding, or interfering with the functions of computer information systems in violation of state regulations, causing the computer information system to be unable to operate normally, and the consequences are serious, shall be sentenced to up to five years imprisonment or short-term detention; where the consequences are especially serious, the sentence is to be five or more years imprisonment.

    Where state provisions are violated by deleting, modifying, or adding to data or applications stored, processed, or transmitted in computer information systems, and the consequences are serious, punishment is to be given in accordance with the provisions of the preceding paragraph.

    Where computer viruses or other destructive programs are intentionally created or disseminated, impacting the normal operation of computer systems, and the consequences are serious, punishment is to be given in accordance with the provisions of the first paragraph.

  5. Anonymous users2024-02-02

    Generally, an interface document of a specification contains at least three parts of information, namely basic information, request parameters, and response.

    The basic part includes the interface name, interface URL, request method, and description information.

    The request parameters section mainly includes the request header and request body parts, which are mainly the description and explanation of the definition of each field in these two parts.

    The response section mainly includes the type of data returned by the response, and the meaning of each field in the response data.

    In the past, after the training of dark horse programmers, I would also buy the books they published, and this is directly from the books. Now that many universities use their textbooks, I will have nothing to read. Anyway, it's quite detailed.

  6. Anonymous users2024-02-01

    In order to strengthen the safety supervision and management of construction lifting machinery, prevent and reduce safety production accidents, and ensure the safety of people's lives and property, the Ministry of Construction has issued the "Regulations on the Safety Supervision and Management of Construction Lifting Machinery", which clarifies the specific matters of leasing, installation, disassembly, use and supervision and management of construction lifting machinery. The "Provisions" came into force on June 1 this year.

    The "Regulations" require that the construction lifting machinery leased by the rental unit and the construction lifting machinery purchased, leased and used by the user shall have a special equipment manufacturing license, product qualification certificate, and manufacturing supervision and inspection certificate. It is forbidden to install standard sections and attachment devices that are not manufactured by the original manufacturer on the construction lifting machinery without authorization. The "Regulations" make it clear that the five types of construction lifting machinery that are eliminated or prohibited by the state, exceed the safety technical standards or the service life specified by the manufacturer, fail to meet the safety technical standards after inspection, do not have complete safety technical files and do not have complete and effective safety protection devices, shall not be rented or used.

  7. Anonymous users2024-01-31

    As far as I know, there is generally no national standard for equipment, because the equipment involves patented technology, generally speaking, if the equipment room is produced by company A, then there are different equipment models for company A. But one thing that needs to be emphasized is: although there is no fixed national standard for this equipment, some of the parts, screws and so on used on the equipment have standard parts, which is what you call the standard!

Related questions
3 answers2024-03-15

1.All the people together VBA-Teacher Yang class all the people together VBA improvement - 38 class hours all the people together VBA actual combat - 56 class hours all the people together VBA basic - 23 class hours 22 Closing Message Manual processing has gradually become a wind in the past, ** recruits are no longer Wuxia Ameng. FLV 21 Episode 21 The public object you sing and I appear, the real boss hides behind the scenes and laughs. >>>More

15 answers2024-03-15

The mobile phone comes with wireless screen projection.

Today's smartphones basically have a wireless screen projection function, which can be used as long as the mobile phone and TV are on the same network. This method has a disadvantage, that is, when the network is unstable, there will be a lag, but if the network at home is very stable, you don't need to worry about this.1Make sure your phone and TV are connected to the same wifi. >>>More

8 answers2024-03-15

Transformation of IT outsourcing model Management outsourcing model has become a trend. >>>More

7 answers2024-03-15

Only some high-speed trains have WiFi networks.

Train WiFi has been in pilot operation since 2012. The original Jiangsu Jinghai Boyuan Company has trial-run its wireless Internet access system on more than 60 trains in Guangzhou Bureau, Hohhot Bureau, Kunming Bureau, Zhengzhou Bureau, Beijing Bureau and Lanzhou Bureau. Passengers can access information, movies, travel guides, and more via the Wi-Fi provided. >>>More

33 answers2024-03-15

Generally, such a feature depends on whether the wireless router you buy has a limit on the Internet time, hehe! For example, I use a JCG JHR-N835R wireless router myself, and the operation is very simple: