How to write a roof leak report just delivered

Updated on society 2024-04-30
4 answers
  1. Anonymous users2024-02-08

    1. If the decoration of the downstairs residents involves serious damage to the parts that need to be compensated, generally speaking, the problem of deformation and discoloration of the ceiling and ceiling takes a long time to be displayed, and it cannot be displayed at that time.

    2. It is right for the property management staff to turn off the faucet in your home, but they should inform you in time that this is their negligence. However, the main cause of water leakage in the house is caused by your unintentional fault, and the property side is only secondary responsibility. The point is that your undoubted fault caused the loss of the downstairs owner.

    3. Your house is a 01-year-old house, but your problem does not involve the problems related to the warranty contract such as breakage, water seepage, high-frequency water and power outages, etc., so your house should be fine, if there are the above related problems, it is the problem that the property management needs to solve.

    4. It is best to communicate with the owner downstairs in a timely manner for such a problem, and let the property management do mediation work in the middle. If it can be repaired, if it is damaged because it cannot be repaired, it will be compensated, after all, it is your own fault that causes the loss of the other party.

  2. Anonymous users2024-02-07

    The water pipe on the roof of the building was broken due to ———, and the maintenance team of the ——— was hired to carry out ——— repairs, and it was repaired at (time).

  3. Anonymous users2024-02-06

    You can contact them first to see how to solve it! Generally speaking, if it is within the 5-year warranty period, the developer is responsible for repairing! After 5 years, the roof belongs to the public area, and the maintenance cost is shared upstairs!

    Public repairs** are not very easy to apply! Hope that helps! Provide free professional technical consultation on concrete waterproof leakage water repair, and eliminate the trouble of repairing leakage every year!

  4. Anonymous users2024-02-05

    Roof leakage:

    1.It is necessary to remove the previous waterproofing, such as paint, membrane, etc., if it is made of mortar waterproofing, it can be removed without shoveling.

    2.Fix the cracks. After the repaired cracks are dry and firm, start waterproofing.

    3.The first layer is made of flexible waterproofing, such as: K11 waterproof slurry (flexible type).

    4.The second layer is made of mortar waterproofing (mortar waterproofing agent), which can protect the flexible waterproofing of the bottom layer while waterproofing.

    Roof waterproofing can not use a single waterproof material, must be rigid and flexible construction, flexible waterproof stretch is good, a little settlement or deformation will not destroy the waterproof layer. Rigid waterproofing (i.e., mortar waterproofing agent) can play a protective role while waterproofing, and the waterproof layer is not easy to be damaged.

Related questions
18 answers2024-04-30

There was no way to rework, so I had to continue the construction on the original basis.

4 answers2024-04-30

2.Opening Title: Honorable Text.

4.Ending: In the hope of a solution. >>>More

7 answers2024-04-30

The following format is for reference:

Summary of work in 2011. >>>More

5 answers2024-04-30

What kind of resignation report should you write, if you have a labor contract, you can submit it to the labor arbitration department for compensation. >>>More

6 answers2024-04-30

Samples are provided below:

1) Basic information of liquidation work: >>>More