-
The qualification of general contracting of electricity is supervised by the Department of Housing and Urban-Rural Development. However, when you declare, you are declared by the local Housing and Urban-Rural Development Bureau, and the Housing and Urban-Rural Development Bureau will report to the Housing and Urban-Rural Development Department for review.
-
Provincial Department of Housing and Urban-Rural Development.
Streamline and optimize the approval process.
1. The engineering survey and engineering design qualifications that are examined and approved by our department. If the applicant enterprise submits a new application for engineering survey and engineering design qualifications, as well as the approval, upgrade, addition and renewal application, it can fill in the qualification declaration data in the "E-government Platform of the Department of Housing and Urban-Rural Development of Henan Province" or the "Construction Industry Management Information System (Survey and Design Enterprise Edition)" and print and generate the "Application Form for Engineering Survey and Engineering Design Qualification", "Information Collection Form for Acceptance of Construction Engineering Enterprise Qualification Application" and "Personal Performance Verification Summary Form for Construction Engineering Enterprise Qualification Declaration" with bar-shaped identification code After stamping the official seal of the enterprise, it will be directly accepted and verified in the government service hall of our department together with the attached materials. If the application materials are incomplete or do not conform to the statutory form, our office will inform the applicant of all the contents that need to be supplemented and corrected within 5 days.
-
Turn into a cup to catch the mountain spring and drink the spring water in the mountain stream.
The ground is flowing clearly, and the bottom is clear, and I take a sip of the cold.
If you are hungry, you can pick the fruit.
The big translucent wild strawberry eats the summer vacation small.
The friends wore their own twigs to weave the cool.
-
Qualifications related to highways: general contracting qualification for highway engineering construction, professional contracting qualification for highway pavement engineering, professional contracting qualification for highway subgrade engineering, and professional contracting qualification for highway traffic engineering.
Qualifications related to water transportation: general contracting qualification for port and waterway engineering construction, professional contracting qualification for port and coastal engineering, professional contracting qualification for waterway engineering, professional contracting qualification for navigable building engineering, professional contracting qualification for port and shipping equipment installation and water traffic management engineering.
Qualifications related to water conservancy: general contracting qualification for water conservancy and hydropower project construction, professional contracting qualification for hydraulic metal structure production and installation engineering, professional contracting qualification for river and lake improvement engineering, and professional contracting qualification for water conservancy, hydropower and mechanical and electrical installation engineering.
-
Hello: The local people's ** education administrative department at or above the county level that accepts applications for teacher qualification certification in accordance with the law is the teacher qualification certification body.
Kindergarten, primary school and junior high school teacher qualifications shall be determined by the district and county-level people's ** education administrative departments where the applicant's household registration is located or the work unit (teaching school) where the personnel file is located. However, the authority of individual provinces to recognize teacher qualifications has been adjusted, such as in Hebei Province, these three types of teacher qualifications have been changed to be recognized by the people's ** education administrative department of prefecture-level cities. Therefore, the authority to determine is subject to the regulations of each province.
Senior high school teacher qualifications, secondary vocational school teacher qualifications and secondary vocational school internship instructor qualifications shall be determined by the people's education administrative department at the prefecture-level city (Disunshen District, Autonomous Prefecture, League) level where the applicant's household registration is located or where the work unit (teaching school) where the personnel file is located. However, in the four municipalities directly under the central government of Beijing, Tianjin, Shanghai and Chongqing, these three types of teacher qualifications are recognized by the municipal people's education administrative department.
The qualifications of teachers in institutions of higher learning shall be determined by the provincial-level people's education administrative department where the school is located.
Ordinary full-time fresh graduates shall, in the last semester before graduation, apply for recognition to the corresponding district, county or municipal teacher qualification accreditation agency in Lu Kainian, where the school is located, with the ideological and moral appraisal, academic transcript and other application materials issued by the school (this method does not apply to those who have already graduated). First-year and second-year graduate students (including doctoral students) shall apply in accordance with the relevant regulations of this province.
Due to the localized management of the implementation of the teacher qualification system, there are some special provisions in the teacher qualification certification policies of various provinces. Therefore, when applying for teacher qualifications, the relevant policies need to be implemented in accordance with the relevant policies of each province.
The teacher accreditation agency will also set up an on-site confirmation point for applicants to submit paper certification materials. The scope of personnel and acceptance time of the on-site confirmation point shall be specified by the accreditation body, and the applicant shall pay attention to the comparison and distinction when registering online, select the confirmation point to which he belongs, and bring the corresponding materials to the site for confirmation within the specified time.
-
If the parties want to set up an education and training institution, the procedures and qualifications required are different from the specific regulations of each country in the country, and it is recommended to consult the local education department, which is the most comprehensive and accurate information, and some information can be provided here for the parties' reference.
The education and training institutions that the parties want to run, such institutions generally belong to private non-academic education and training institutions, and the education administrative departments across the country have formulated the corresponding "Regulations on the Establishment and Management of Private Non-academic Education and Training Institutions", which clearly stipulates the procedures and qualifications for handling private non-academic education and training institutions, and the parties can consult the local education administrative departments.
-
First of all, the applicant company must go to the industrial and commercial bureau, and the property company should find the construction committee and other relevant departments! However, in general, real estate development companies generally use their own property companies directly in new communities.
-
Difference Yanmin: Scope of contracting: The general contractor of electric power can undertake the installation, generation, distribution, transmission and substation construction of power lines, and power engineering refers to the production, transmission and distribution of electric energy, including thermal power generation, hydroelectric power generation, nuclear power generation, wind power, solar energy and other energy power generation, transmission and distribution projects and their supporting projects;
Mechanical and electrical qualification can undertake the installation of building mechanical and electrical, mechanical and electrical engineering refers to the mechanical and electrical installation engineering that is not included in the port and waterway, water conservancy and hydropower, electric power, mining, metallurgy, petrochemical, communication engineering machinery, electronics, light industry, textile, aerospace, ships, weapons and other industrial projects.
Staffing: professional titles related to power engineering, including thermal power engineering, hydropower engineering, nuclear power engineering, wind power, solar energy and other energy engineering, power transmission and distribution and power engineering, power system and automation, etc.; Professional titles related to mechanical and electrical engineering, including HVAC, water supply and drainage, electrical, mechanical equipment, welding, automation control and other professional titles.
Same: Both mechanical and electrical constructors and mechanical and electrical professional engineers are required.
-
Enterprises refer to Shen Xian Zheng Ku to apply to the Grade A qualification for engineering survey, Grade A qualification for architectural engineering design, Grade A and Grade B qualification for special design (except for Grade B qualification for architectural decoration) and other engineering design Grade A and Grade B qualifications, and shall apply to the people's construction administrative department of the province, autonomous region and municipality directly under the Central Government where the enterprise is registered. Among them, the first management of the enterprise directly to the construction administrative department of the first application, its affiliated enterprises by the first management department to apply, at the same time to the province, autonomous region, municipality directly under the central government of the province, autonomous region directly under the central government of the administrative department of the construction of the record.
The materials required for the new power grade C qualification are: >>>More
The engineers required for the C-level qualification for power transmission and transformation in power design are: 1 person for registered power generation, transmission and transformation, 1 person for registered secondary structure, 1 person for estimated budget middle engineer, 1 person for communication senior engineer, 1 person for electric power senior engineer, and 1 senior engineer for general planning. >>>More
Generally speaking, UPS is also a kind of inverter, UPS is equipped with a battery, when the power supply is interrupted, the battery can continue to supply power for a certain time, so UPS is a small-capacity uninterruptible power supply. >>>More
I) the personnel with Class B qualification for power transmission and transformation? Substation. >>>More
Engineering survey is a crucial step in the whole project, therefore, most enterprises continue to carry out business by applying for relevant qualification certificates. However, due to the lack of understanding of survey and design qualification certificates, it often leads to many problems. So, what issues need to be paid attention to when handling the survey and design qualification certificate? >>>More