Clear water room decoration steps and processes, clear water room decoration process

Updated on home 2024-06-29
6 answers
  1. Anonymous users2024-02-12

    When renovating a clear water house, the first thing that needs to be carried out is the design stage. This phase includes the layout of the entire house, as well as the functional orientation of the individual areas. The designer will work out a detailed decoration plan according to the needs and preferences of the owner.

    In the Chinese market, the cost of this stage ranges from about 50-200 yuan per square meter.

    If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].

    Once the design is complete, the next step is the construction phase. The first is the demolition and renovation works, which include the removal of unwanted walls, doors and windows, and the addition of new partitions. Then there is the hydropower retrofit, including the laying of new electrical wiring, water pipes, and the installation of switches and sockets.

    This is followed by the masonry stage, which includes the leveling of walls and floors, as well as the laying of tiles and floors. Finally, there is the carpentry stage, which includes the fabrication and installation of custom furniture such as cabinets, wardrobes, etc. The cost of the construction phase ranges from 300 to 800 yuan per square meter.

    After the construction is completed, it is the soft furnishing stage. This stage is mainly based on the design plan, the purchase and installation of furniture, lamps, curtains and other decorative items. The cost of the soft furnishing stage ranges from 100-500 yuan per square meter.

    Finally, what needs to be done is the acceptance phase. This stage is mainly to check the quality of the decoration project, including the completion of each process, as well as the installation and use of furniture, electrical appliances and other equipment. After passing the acceptance, the decoration project will be officially completed.

    When renovating a clear water house, it is recommended that the owner first clarify his needs and budget, and then find a reputable renovation company and sign a detailed renovation contract to protect his rights and interests. At the same time, it is also necessary to actively participate in the decoration process, communicate with the designer and the construction team in a timely manner to ensure the smooth progress of the decoration project.

    Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget, want to find a good company, learn more about decoration knowledge on Tuba Rabbit, click here, free 1 to 1 for your home decoration services: [Tuba Rabbit ** official website].

  2. Anonymous users2024-02-11

    After determining the plan, the main body transformation, hydropower construction, wood construction, foundation and installation works will be carried out.

    The specific steps and processes are as follows: 1. Preliminary work: First of all, it is necessary to determine the relevant design plan and budget with the decoration company, and only after confirming that it is correct, can the decoration contract be signed.

    2. Main body transformation: Generally speaking, the main frame of the house needs to be rectified before decoration, such as removing some low walls, and designing the overall frame of the house in advance, which will be helpful to the next decoration, but after the construction, you must remember to tidy up the house.

    3. Hydropower construction: In the process of construction, it is necessary to keep a certain distance between the lines Wiring should be horizontal and vertical, in addition, it is necessary to determine the approximate placement of spare electrical appliances and switches and sockets and the selection of products.

    4. Basic project: This mainly includes the mud and wood steps and the painting stage. For example, mud is the first process, which includes tile and floor drain construction, then carpentry, and finally painting construction projects.

    5. Installation engineering: There are many indispensable items in the installation project, such as cabinets, floors, switches and sockets, lamps, etc., which need to be installed in this link.

  3. Anonymous users2024-02-10

    The steps and methods of water and electricity decoration of the blank room are as follows:

    1. Circuit installation.

    1. Before the installation of hydropower, there must be strong and weak electricity, and the design and construction drawings of water supply and drainage.

    2. It is forbidden to set the wires without any protection directly in the wall, in the floor, under the floor or on the ceiling.

    3. Lines with different voltages, different circuits, and different signals are strictly forbidden to wear in the same pipe.

    4. The installation of lamps and lanterns should be completed after the paint construction, and the switchgear should be installed on the phase line, otherwise after the switch is off, the lights will still be charged and the electrical equipment will be electrified, which is easy to cause electric shock. If the luminaire uses a screw head, the reed tongue of the screw head should be connected to the control phase wire.

    5. Remember not to connect the wire in the conduit, that is, if the length of the wire is not enough to be wired, the connector of the wire cannot be in the conduit, and it should generally be wired in the junction box such as switches, sockets, lamp head boxes, etc.

    6. The power system should take appropriate protective measures, grounding protection and zero protection, generally take grounding protection, and it is strictly forbidden to use two protection measures at the same time.

    7. The interface of the line should be smooth, the connecting plate should be firm, and it is strictly forbidden to block the wire to block the conduit.

    Second, the installation of waterways.

    1. The hot water faucet in the cold and hot water faucet should be installed on the left side. The electric water heater should have a grounding protection device, which can remove the air in the bile when it is first used, and it can be energized after being filled with water.

    2. The horizontal pipe of the drainage pipe should have a certain slope, and the socket connection should be tight to ensure that there is no leakage. Fixed pipe brackets, elevator spacing reasonable, firm.

    3. The installation of the waterway must be firm and accurate, and the installation position of toilet appliances must also be accurate and firm.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose.

    Villa Master.

  4. Anonymous users2024-02-09

    With the development of society and the continuous improvement of economic living standards, many people have purchased a clear water house, and the decoration of the clear water room must have a certain imitation of the design scheme in order to achieve the expected effectSteps and processes for the decoration of the clear water roomFirst, the decoration steps and processes of the clear water room.

    1.The decoration steps and process of the clear water room are to clarify the decoration area and understand the size of the wall. It is extremely important to clarify the decoration area, especially the wall paint area, tile area, floor area, wallpaper area, etc.

    To clarify the main wall size, it is necessary to estimate the furniture area, design the placement size, and accurately lay out.

    2.The second step and process of the decoration of the clear water room is reasonable demolition and modification, and the space is skillfully used. The clever use of space, including wall masonry, wall demolition, heating removal, shoveling wall skin, plastic replacement steel windows and many other contents, will remove garbage in time, ensure indoor cleanliness, and facilitate construction.

    Before the hydropower transformation, it is necessary to carry out detailed measurements on the doors and walls, and determine the rectification plan, including the transformation plan of wires and waterways. Household appliances, such as water heaters, air conditioners, range hoods, etc., need to ask someone to come forward to measure and determine the location of the power supply. After the hydropower transformation, it is not advisable to regret it, and after building it in all aspects, it is necessary to determine the exact location of each electrical appliance to facilitate installation.

    The locations that need to be determined are "water heaters, air conditioners, range hoods, washing machines, TVs, lamps, decoration traps and evasions, etc."

    3.Process 3: Optimize the appearance of the pipeline and strengthen the decorative effect. The complexity of the pipes will affect the appearance of the whole design, especially the plumbing system of the bathroom decoration is larger, so how to keep the key to make it dry and non-slip, and beautiful?

    This necessitates optimizing the pipeline to make it work as it should.

    2. Precautions for the decoration of the clear water room.

    1.Comprehensively check whether the cement wall that needs to be painted in the clear water room is solid and smooth. If the plastering layer on the wall is not strong enough or there are large cracks and holes, it is advisable to complain to the developer or property and ask it to be redone. Individual holes can be filled with plaster if repaired by yourself.

    2.Inspection of all exterior finishes, including balconies, rain covers. Morph fiber.

    3.Inspection of common parts, public facilities, electrical equipment, etc.

    4.Inspection of water flow, pressure test, ball test and heating thermal commissioning of various pipelines.

    5.The roofing project carries out water storage and water drenching tests.

    6.Each room within the door is inspected with prefabricated floor slabs or cast-in-place slab roofs.

    7.The floor of the room with waterproof requirements should be planned in strict accordance with the building requirements of the waterproof layer and the protective layer, and two water storage tests should be carried out during the acceptance to achieve no leakage.

    8.The floor drain and flashing slope meet the design requirements, so that there is no flooding, and the joint is tight and smooth, and there is no leakage.

    Through some detailed introductions to the steps and processes of the decoration of the clear water room, and a series of related issues to be taken into account when the clear water room, I believe we all have a certain understanding, and I hope that after the above introduction, it will be helpful to you.

  5. Anonymous users2024-02-08

    <> the decoration steps of the clear water room include clarifying the decoration area, reasonable demolition and modification, and optimizing the appearance of the pipeline. 1. Clearly sell the decoration area: the first thing to do in the decoration of the clear water room is to clarify how large the area that needs to be decorated, which is the most important aspect, especially the paint area of the wall, the area of the tile, the area of the floor, etc.

    The size of the wall should be confirmed first, so that the furniture placement area can be designed. 2. Reasonable demolition and modification: In the demolition and renovation of the house, it is necessary to make reasonable or seepage use of space, and after the construction of the wall and the demolition of the wall, the garbage should be cleaned up in time to keep the interior clean and tidy for construction.

    Before the water and electricity renovation, the door and shirt should be carefully measured, and then the plan should be determined. After all aspects are transformed, the location of the electrical appliances is determined so that they can be installed later. 3. Optimize the appearance of the pipeline

    The complexity of the pipes in the decoration will directly affect the design of the whole house, especially the pipes in the bathroom decoration are very many, so the pipes should be optimized.

  6. Anonymous users2024-02-07

    The decoration process of the clear water room is as follows:

    Material preparation: tools for measuring bridges, wallpaper, wall paint, door and window covers, wall panels, gypsum board ceilings, bath bombs, wallpaper, sanitary ware, hardware accessories, exhaust fans and household items, etc.

    1. It is very important to pay attention to the design of the clear water room in the early stage of decoration, and then to understand the area involving the pants blindness, so as to determine the area of paving bricks and wallpaper and wall paint, and clearly placing some wall dimensions of furniture.

    2. The next step is to do a good job in the flatness of the wall, ground and top surface, and design the water supply pipeline. Communicate with the decoration company to do a good job in the construction time and construction period, and then carry out the demolition of the work. For example, some non-load-bearing walls can be removed, and the garbage should be removed in time.

    3. The next thing is to do concealed engineering, which includes doors and windows, including water and electricity renovation, and some carpentry foundation work. Then the masons have to enter the site, smooth the walls, do a good job of brushing, and the carpenters will make door and window covers, including wainscoting, gypsum board ceilings, and bath bomb installation. The painter has to paint the wall, paste the wallpaper, or decorate the soft decoration.

    4. Then install the floor, sanitary ware, hardware accessories, exhaust fans, etc., and finally clean the decorated house as a whole, and carry out acceptance and rectification in accordance with the requirements of the contract.

    5. Buy household items and arrange them according to your preferences.

Related questions
11 answers2024-06-29

1. Prepare the tools required for the decoration of the blank room. >>>More

32 answers2024-06-29

It is better to use a single strand because it is easy to operate when wiring; The wiring of multiple strands needs to be tinned, which is generally inconvenient to operate at home; Joints without tinning are easy to heat up and have poor contact; >>>More

10 answers2024-06-29

1.Determine the decoration style and layout, that is, find a decoration company to do a good job of interior layout planning. >>>More

5 answers2024-06-29

The steps and methods of water and electricity decoration of the blank room are as follows: >>>More

8 answers2024-06-29

In recent years, the state has gradually accelerated the process of renovating old houses in urban areas, and has introduced some encouraging policies to encourage the renovation of old houses in the community, and the majority of owners are also willing to renovate the old houses, so the decoration of the old houses in these communities has been put on the agenda. How to decorate the old houses in the community is just right, and how to realize the new appearance of the old has become a new topic, which needs to be taken seriously in order to be solved. >>>More