    The method of hydropower transformation and displacement is very simple:

    1. Specifically, depending on the distance to be moved, if the distance is very close, you can draw a wire from a nearby socket to save money, and the effect is the same.

    2. There is also a specific look at the function of the socket, whether it is a refrigerator or a washing machine, or an air conditioner, which mainly involves high-power lines, and it is recommended to start from the distribution box.

    Re-pull the wire, thread the pipe, and move because of the high power breakpoint.

    If there is a problem, the later maintenance is a big problem, with certain safety hazards.

    It is not standardized in the construction standards, unless it is a contract foreman.

    In order to cut corners, this is also relatively common, because it is difficult for you to find this point just after the decoration, and you will only find it when there is continuous tripping after you use it later.

    3. If the normal weakness is shifted or the mobile phone is charged with low power, it will not be affected, and the way of breaking point continuation can also be used to save money.

    4. If the waterway is close, it can be converted and connected through the ball valve, and it will not affect the size of the water pressure.

    5. During construction, those who can walk the ground should go to the ground, try not to go to the top surface, unless it is a line problem, the waterway can go low as much as possible, because the management of the waterway PVC is under pressure in the air, and in time in the ceiling, it will greatly reduce the service life, because the manufacturer of the pipe is tested in the case of ground cement cover when making standards, not in the form of suspension. Moreover, the waterway will form water entanglement, and there is also a certain risk for the top surface, so this is why large developers, when handing over the house, take the ground.

    6. Tin foil must be used when using weak points and strong electricity.

    Parcel isolation to avoid electromagnetic interference in the later stage.

    The formation of a network instability situation, at the same time, the strong current line should be based on the use of electrical appliances to determine the thickness of the cable, not all thin, not all thick.

  2. Anonymous users2024-02-11

    It is time to do hydropower transformation, at this time, through the connection between the circuits, responsible for a direction of the problem, and then go to some professionals, the effect will be better.

  3. Anonymous users2024-02-10

    To make a plan in advance, to look at the socket wire, but also to pay attention to the power, but also to do a good job of waterproof and moisture-proof in advance, pay attention to the distance moved.

  4. Anonymous users2024-02-09

    According to the user's needs, determine the position of the switch socket of the whole house and the position of the waterway interface, and then implement, pay attention to safety when shifting.

  5. Anonymous users2024-02-08

    1. Hydropower sockets are best installed in **Second, the advantages and disadvantages of switch sockets

  6. Anonymous users2024-02-07

    If the distance is very close, then it is enough to lead out a wire, and then redesign the position of the socket, which is more convenient.

  7. Anonymous users2024-02-06

    It is necessary to re-groove and re-wire the hydro for installation, because in doing so, the hydro will be durable.

  8. Anonymous users2024-02-05

    This depends on the size of your house and the location of the original water and electricity.

  9. Anonymous users2024-02-04

    Hot on the left and cold on the right. The water pipe passes through the top surface, so in the unlikely event of a leak in the pipeline, it will not affect the residents downstairs. The place where the pipeline passes should be waterproofed.

    Home decoration generally uses two specifications of water pipes D25 (six points) and D20 (four points), which are used for the main pipe and the main pipe respectively. The water supply riser and horizontal pipe are treated with moisture and noise reduction, and special rubber and plastic plates need to be wrapped and bundled and fixed.

    There is only one consequence of not doing hydropower transformation, and that is inconvenience! In fact, the wires and water pipes provided to us by the developer can meet the qualified standards in terms of product quality and construction level - and even reach the middle and lower level. It's better than some users who have been cheated or are reluctant to spend money.

    What developers provide, whether it is the number of outlets or the number of sockets – and even more so weak current sockets – can hardly meet the normal needs of today's users. This requires users to redesign, or increase the number of pipes and lines on the basis of raw water circuits.

    According to the needs of the user, determine the position of the switch socket of the whole house and the position of the waterway interface. The plumber should explain the direction of the line to the user according to the location of the switch, socket and faucet according to the diagram, and finally leave a drawing to avoid opening the hole to the line or water pipe in the future. And it is necessary to pay attention to the principle of "water goes to the sky, electricity goes to the ground", the width of the groove is determined according to the material, and the slotting is guaranteed to follow three principles as much as possible

    the principle of the shortest route first; second, the principle of not destroying the original strong electricity; Thirdly, the principle of waterproofing must not be undermined. The depth and width of the slotting generally need to be at least 4mm wider than the material used.

    Hydropower renovation is based on the construction drawings for positioning and pay-off construction. The original reserved water potential deviation, if not remodeled, it is difficult to meet the requirements of the construction drawings.

  10. Anonymous users2024-02-03

    If you don't want to break the wall, then take the bright line, you are willing to line the bright line on the wall, how to deal with the original joint of the socket displacement in the decoration If it is during construction, you can also wrap it in electrical tape, bury it in the bottom box, and then directly place a whiteboard box. 3. After the decoration of the socket, can the position be re-moved, but the decorative surface between the new socket and the original socket should be destroyed, and the power supply of the new socket should be led out at the original socket position (the original socket wire joint is insulated and finished). If the new socket is located behind the original socket line (horizontally or vertically), you can carefully insert the hole in the bottom box with a percussion drill, so that the two sockets are decorated.

  11. Anonymous users2024-02-02

    When renovating hydropower, it is necessary to mark the place that needs to be renovated, then open a trench in the new place, connect the water circuit, and then abandon or make up for the location of the old place.

  12. Anonymous users2024-02-01

    The best way is to change the line, but some socket wire boxes are three directions to the line, it is not good to change the line, two directions to the line of the socket is best to change the line, and then with some insulating materials to wrap the line and then seal the box, is a better way to deal with it. It is best to install a light panel on the socket that is not good for changing wires, so that if there is a problem, it can be disassembled for maintenance

  13. Anonymous users2024-01-31

    1. Piping according to the drawings, 2. Threading according to the drawings.

    3. The location and elevation of the socket should meet the requirements of the drawing.

    4. The wiring in the socket should be standardized, and the ground wire should not be connected in series.

    5. The socket cover should be flush with the wall.

    6. The polarity of the socket should meet the requirements of the specification

Related questions
12 answers2024-06-29

The owners love to renovate their homes.

At the time, it is necessary to be in line with the fact that the place that should not be saved must not be saved, and the hydropower transformation. >>>More

19 answers2024-06-29

The procedure for remodeling the kitchen with water and electricity is relatively uncomplicated. First of all, it is necessary to find a professional hydropower retrofit company for consultation and evaluation. They'll send an engineer to visit the site to understand your needs and budget, and provide a solution. >>>More

13 answers2024-06-29

The renovation of old houses in rural areas is a key link in rural construction at present. Designers should not only consider the safety and functionality of residential renovation, but also pay attention to the overall rural ecological environment. Through comprehensive consideration, the old house renovation style with hygiene, environmental protection and characteristics is designed to promote the development of rural construction. >>>More

7 answers2024-06-29

Before the renovation, it is best to let the designer make a construction drawing, the hydropower renovation must be planned before the start of construction, otherwise you will regret it, as for how reasonable you say, this depends on the overall design of the house, the hydropower drawings and decoration drawings should be accurate and correct, how to plan the hydropower I will not talk nonsense, search a lot, and sit down with your own number.

13 answers2024-06-29

Choose IKEA's kitchen cabinet combination, according to Wanru's height configuration tailored kitchen countertop, to solve the long-standing problem of backache. The storage space of the kitchen cabinet has also been re-planned, and the cabinet under the gas stove has been changed to drawers, which can be used when cooking, and there is a storage box separating spatula and cutlery inside, which is clear at a glance and effortless to take out. Colors can be used to create highlights, the walls can be painted in warm yellow, light blue and other tones, and the floor can be pasted with wall tiles with European taste, so that the whole kitchen is full of personality.