Roof leak repair agreement, how to write the letter of commitment after the house leak repair

Updated on society 2024-06-15
3 answers
  1. Anonymous users2024-02-12

    Entrusting unit (Party A):

    Undertaking unit (Party B):

    Project location: project content: roof leakage.

    The parties A and B have reached the following agreement through friendly negotiation:

    1. Party A agrees to entrust the leakage repair project to Party B for construction. Party B shall carry out leakage repair construction on the leakage filling project in accordance with the national construction specifications and relevant construction requirements. The load-bearing structure of the house shall not be damaged, and if there is any damage, you shall be liable for compensation.

    2. The amount of waterproof construction contractor and material project is: RMB whole ( ).

    3. The warranty period is one year, during the warranty period, if there is water leakage in the part constructed by Party B, Party B will re-carry out waterproof treatment free of charge. The warranty period for the redone parts has been extended.

    4. Project payment method: After the project completion experience is qualified, observe for one month to ensure that there is no leakage, and Party A will pay Party B the project payment in one lump sum.

    5. Both parties shall strictly abide by the responsibility of performing the agreement, and when one party breaches the contract and fails to perform the agreement, the breaching party shall compensate the other party for economic losses: 25% of the total price of the project

    6. During the construction process, it is necessary to contact the residents of each unit, and Party A will cooperate with the required floor plan.

    7. Party B is responsible for the safety responsibility during the construction, and the insurance cost is included in the project payment.

    8. Construction period: Party B shall be completed before XX-XX, and Party A shall have the right to deduct 20% of the project price as liquidated damages if the completion is delayed.

    9. This agreement is valid from the date of signing to the end of the warranty period.

    10. This Agreement shall be executed in duplicate by both parties, and shall have the same legal effect.

    Party A: Party B:

    Signature of the Representative: Signature of the Representative:

    Date: Date:

  2. Anonymous users2024-02-11

    Agreement on waterproofing and repairing leaks in the house.

    Party A: Lv Jinshan ID number: 360124196501294816 Party B: Wan Xiping ID number: 360124196501294816

    Party A has a seventh-floor house located on Jinxian Avenue and Jingwei Road, and the roof is fully waterproof and leakage-filling, and it is contracted to Party B.

    1. Party B's contracted labor and materials, the total ** is three thousand hundred yuan (3,800 yuan).

    Second, after waterproof leakage, the insulation layer should be kept in place.

    3. Party B promises to rework unconditionally within one year. Party B is responsible for its own safety, and Party A has nothing to do with it.

    Fourth, after the completion, Party A paid three thousand yuan in cash, and the balance was paid in one lump sum after the Dragon Boat Festival in 2013.

    5. This agreement shall be executed in duplicate, one copy for each party, and shall take effect immediately after being signed by both parties.

    Signature of Party A: Signature of Party B:

  3. Anonymous users2024-02-10

    Friends who live on the roof often meet the problem of roof waterproof quality, once there is a problem, you need to carry out waterproof leakage repair project, you obviously can't do it, you need to find a professional team to complete, and this requires a formal contract to protect the interests of both parties, thenWaterproof leak repair projectWhat are the contents of the contract? Below we will bring you a professional waterproof leak repair project contract model, I hope to help you.

    Model contract for waterproofing and leakage repair works

    Party A: Party B:

    Party A will contract the waterproof leakage repair project to Party B for construction. In order to clarify the responsibilities of both parties, in line with the principle of mutual benefit, the two parties have agreed as follows:

    First, the name of the project: waterproof leakage repair project.

    Second, the content of the contract: according to the drawings of the construction scope and Party A's review of the project list of contractors and materials (large package).

    Third, the total cost of the project: yuan (capital: positive, tax included), with the audit ** table and drawings in duplicate, both sides hold a copy.

    Fourth, the construction period: from YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY

    5. Quality requirements: Party B shall carry out standardized construction in strict accordance with the construction technology to ensure the quality of the project.

    6. Payment method: The project will be paid in two installments. For the first payment, Party B shall pay 40% of the total amount of the project after entering the site for construction; For the second payment, 55% of the total amount of the project will be paid after the project is completed and accepted, and the remaining 5% will be retained as a guarantee money.

    7. Project shelf life: The shelf life of this project is one year (from the date of completion and acceptance of the project). During the warranty period, if there is leakage, Party B will rework and repair it free of charge until there is no leakage.

    8. Responsibilities of both parties:

    Party A is responsible for sending construction personnel to the site to supervise the construction quality and guide the on-site traffic.

    Party B must ensure the personal safety of the construction personnel during the construction process, and Party B shall be responsible for any liability accidents.

    9. The final matters shall be resolved through negotiation between the two parties.

    10. This contract shall come into force on the date of signing and shall be jointly complied with and executed by both parties.

    Ten. 1. This contract shall be executed in duplicate, and both parties A and B shall hold one copy each.

    Signature of Party A: Signature of Party B:

    YYYYYYYYYYYYYYYYYYYYYYY

    The above is all the content of the professional waterproof leakage repair project contract waterproof leak repair project contract template brought to you.

Related questions
13 answers2024-06-15

The roof of the farmer's uncle is cracked and leaking, and the new waterproof material is used to paint, the construction is simple, and the effect is good.

5 answers2024-06-15

Traditional methods. The building body leaks, it means that the waterproof layer treatment problem, the waterproof layer has hard tiles on the surface, according to the traditional method is to pry the outside tiles open, and then dig up the waterproof layer, redo a new waterproof layer, and then re-lay the tiles. Among them, the cost of labor, materials, and time used is very large. >>>More

7 answers2024-06-15

Waterproof leakage, as small as hundreds, as large as tens of thousands of yuan, mainly to see the leakage and the cause of the leakage and the way to deal with the leakage. >>>More

9 answers2024-06-15

The best way is to cover the color tile, other methods have been tried, such as asphalt, which can only be piped for a year.

11 answers2024-06-15

If you can't make up for the detected vulnerabilities, you can turn on the phone and press F8 to enter safe mode, and then use the Rising Card Safe Internet Assistant to patch it. >>>More