  1. Anonymous users2024-02-06

    Traditional methods. The building body leaks, it means that the waterproof layer treatment problem, the waterproof layer has hard tiles on the surface, according to the traditional method is to pry the outside tiles open, and then dig up the waterproof layer, redo a new waterproof layer, and then re-lay the tiles. Among them, the cost of labor, materials, and time used is very large.

    The latest method. Waterproof leakage, the traditional concept is to fill the leakage. The latest waterproof leakage method is to abandon this traditional concept, waterproof layer leakage, do a good job of waterproof and leakage prevention outside the tile, as long as the outside tile surface layer is waterproof, the waterproof effect is the same.

    Waterproof leakage repair construction method: use a knife to remove the waterproof cement or solid glue between the tiles and the tiles, dry the ground with a dryer for a day, and then fill the gully with cement of the same color as the floor (the ground is white, fill it with white cement, and if the floor is black, fill it with black cement, this is for indoor Micron. Then use a special CPC waterproofing agent to slowly inject into the cement, after 1-2 days, the waterproofing agent and cement will be firmly adsorbed on the tile, effectively forming a stable waterproof layer.

    Detailed steps: 1. When the weather is fine, ensure the dryness of the building itself. (Not if it's raining, and if the building itself isn't very dry, you can use a hair dryer to blow on a wet area.) )

    2. Check whether there are obvious gaps in the leakage place, if there is, fill it with cement and wait for it to dry! If not, don't care.

    3. Use a brush to apply directly to the leaky part of the building, one time, and you can't splash water to the painted position within 12 hours. After 12 hours, the water leakage problem was completely solved.

  2. Anonymous users2024-02-05

    The best way to repair leaks is as follows

    1. Traditional methods From the traditional aspect, this situation is generally a problem with the waterproof layer, so the outer layer of tiles is usually pried open, and then the waterproof layer is dug up, and the waterproofing is redone, and then the tiles are laid.

    2. The latest traditional method is to make up for the leakage, and the current new method is to abandon this concept, and do a good job of waterproof and leakage prevention directly on the outer layer of the tile, in fact, as long as the surface layer of the outside tile is waterproof, the waterproof effect is the same.

    3. For new or modified users, when waterproofing the surface of the bathroom, it is recommended to level the ground with cement mortar first, and then do waterproof treatment, which can effectively prevent leakage caused by uneven thickness of waterproof coating.

    4. During construction, the relevant personnel should be carefully urged to deal with the corners and some inconspicuous places, and all the waterproof coatings must be applied in place, so as to avoid the emergence of problems.

    5. After the construction is completed, the waterproof test must be carried out, and the specific operation method is to block all the lower hand mouths of the bathroom and pile up a 25 cm high"Kan"Then fill the bathroom with 20 cm of water and check for leaks after 24 hours.

  3. Anonymous users2024-02-04

    Summary. Hello, the best way to repair waterproof leaks is the combination of inner and outer waterproofing. Usually, during construction, the outer layer of the building is waterproofed, and then the second waterproofing is carried out inside the building.

    Hello, the best way to repair this file is the combination of inner and outer waterproofing. During construction, the exterior of the building is waterproofed first, and then the interior of the building is waterproofed.

    Hello, you can also use elastic and tough polymer materials to fill the gaps or cracks near the building, which can achieve a good waterproof leakage repair effect.

  4. Anonymous users2024-02-03

    1.The method of waterproofing and repairing leaks in the roof is not particularly complicated. We should first find the leak and then clean everything around the leak to keep the leak dry.

    2.Then choose the right quality waterproofing coating. If the leakage is not serious, we can lay waterproofing membrane directly on the roof.

    If the roof is very wet, the waterproofing membrane can also be repaired with the corresponding waterproofing coating if the waterproofing membrane is laid without digging scales. 3.If the roof leakage is very serious and there are cracks, I shout that the scattered stalls need to cut the cement mortar around it, fill it with a little waterproof paint, and then fill it with a layer of waterproof cement to ensure that the brush is even.

    4.If the roof leakage area is large and the exact leakage point cannot be found, it is recommended to clean the roof surface and do another layer of waterproofing.

  5. Anonymous users2024-02-02

    Dear, the best way to repair waterproof leaks is as follows:1Inspect the roof regularly:

    Inspect the roof regularly to identify and repair any damage. 2.Use high-quality waterproof materials:

    Choose high-quality waterproofing materials, such as elastic waterproof coatings, waterproof tapes, waterproof light films, etc. 3.Take precautions:

    When waterproofing buildings or roofs, natural factors such as flood control, drainage and wind should be considered, and corresponding preventive measures should be taken. 4.Choose a professional waterproof company:

    Choose a professional waterproofing company for waterproofing construction to ensure waterproof quality. 5.Follow the proper waterproofing method:

    When carrying out waterproof construction, it is necessary to follow the correct waterproof method, including layer, material and construction technology.

Related questions
12 answers2024-03-10

Bathroom leakage is a very troublesome thing, not only to bring trouble to yourself, but also to the people downstairs also bring trouble to life, a great waste of money. Bathroom leakage generally needs to smash the tiles, and then repair the pipe leakage, which is really expensive. In fact, the bathroom can also not smash bricks, but also can be waterproof leakage, the following is an introduction to the bathroom without smashing bricks waterproof leakage method. >>>More

8 answers2024-03-10

Yes. Due to the variety of waterproof leakage repair enterprises on the market, many consumers do not know how to choose a professional leakage repair company, whether it is family waterproof leakage, or building waterproof leakage, it is very important to choose a qualified waterproof leakage repair enterprise for construction, so how to choose a good waterproof leakage repair enterprise for leakage repair operations, you can have the following points to choose: >>>More

8 answers2024-03-10

Toilet paints with RPM lipper microphones. In the bathroom, it is necessary not only to consider mildew prevention and inhibit algae growth, but also to be able to resist water pressure. >>>More

13 answers2024-03-10

The roof of the farmer's uncle is cracked and leaking, and the new waterproof material is used to paint, the construction is simple, and the effect is good.

9 answers2024-03-10

First of all, you need to pay attention to the right waterproof material: >>>More