Entering the construction stage, according to the design drawings to do addition and subtraction, in addition to the load-bearing wall, the natural gas pipeline should also be bypassed as much as possible, if you have to change, you must go to the gas company in advance to apply. At this time, you can also book a long delivery cycle, finished doors, customized cabinets, etc. After laying the bricks, all that's left is for us to start the oil process!
The oiler is dealing with the wall as well as the top surface! The most common practice is putty leveling, wall nib leveling, and then start with latex paint.
<> bricklayer mainly refers to building walls and laying tiles. There's nothing to say about building walls, do it according to your needs. The focus is on ceramic tiles, it is very important to find a master with good craftsmanship, although the bricks laid by professionals are generally not empty, but the craftsmanship is still good or bad from the overall effect of the wall will be included in the kitchen and bathroom and balcony water pipes (some decoration companies will be calculated according to how much money is a piece), so when signing the contract, you must ask clearly, which is also a small part of the "hidden addition".
After the completion of the ceiling carpenter's work, the cabinet can be installed, and the installation details of the gas stove and sink should be considered, especially the natural gas pipeline should be communicated with the property in advance, and the gas test should be carried out. The fourth step, carpentry, including custom wardrobes, integrated kitchens, integrated ceilings, integrated kitchen and bathroom, etc. The sixth step is to install curtains, furniture and other soft decorations.
I wish everyone can afford to buy a house and live in a comfortable house.
Mechanical and electrical construction is aimed at the sorting of air conditioning or fresh air systems to avoid conflicts between the circuit and the ceiling in the later stage. Waterproofing: After the water and electricity renovation is completed, the kitchen, bathroom and balcony can be waterproofed.
Remember, waterproofing is very important, and be sure to supervise the workers every step of the way! The closed water test must check that there is no water leakage, otherwise there will be water leakage in the later stage, and the plan will be very designed, and tell the designer his own ideas, so that the designer can make the most suitable plan for himself under the guidance of professional knowledge. After the plane plan is determined, the decoration company will provide you with renderings to display, and through the renderings, you can see the decoration more intuitively.
-
The decoration of the rough house should first be connected to water and electricity, and then start the decoration from the wall, the ceiling, and finally to the floor.
-
Some plumbing should be done for underfloor heating first, and then floor tiles should be laid. Then the decoration of various places will be carried out. When decorating, you must pay attention to protect your own safety, but also pay attention to every detail, so as not to leak.
-
Clause. First, the overall planning and design of the rough house Simply put, this step is to measure the room, measure and record the various areas and dimensions of the rough house, and then carry out the overall planning and design according to these measurement results, to see how the effect of the house should be better, and then produce a decoration renderings, if you are satisfied, you can carry out the construction; Clause.
Second, the overall demolition and modification of the rough house In the construction, the first step is to dismantle and modify the structure of the house itself according to the design of the house, aiming at the differences in the structure and design of the house itself, and the conflicting places need to be changed; Clause.
Third, the concealed project after the completion of the demolition and reconstruction, it is necessary to carry out the construction of the concealed project of the house, this part mainly includes the hydropower transformation and waterproof engineering, the hydropower transformation should be for the location of all the socket switches, first determined, and then wiring, as much as possible a little socket, it is not good to increase in the future, and then waterproof is mainly for the kitchen and bathroom, this must still be done, must not be leakage;
-
What do you need to pay attention to in the decoration of the rough house? What should I do first?
1.Rough house decoration needs to pay attention to the structure you can not change. For friends who decorate for the first time, they don't understand the structure of the house, and in order to better make the structure conform to their own design, they will tear down some bad patterns of the house.
However, in general, it is necessary to avoid remodeling the original house structure as much as possible. If you need to renovate, you must ask professionals to design and go through the relevant procedures. The improved wall must be safe, and the structure can be reinforced in some way.
2.The advantage of the rough house is that the owner can design each room according to the actual needs of himself and his family, and the function of each room needs to be realized. At this time, the owner must consider the plugs, sockets, water lines, network cable ports and so on in each space when planning.
It is best to find a qualified renovation company for water and electricity renovation. They have professional hydropower renovation personnel and professional processes to carry out the transformation, so as to ensure the efficient implementation and reasonable layout of the project. If the water and electricity arrangements in the early stage are unreasonable, it will be very troublesome and a waste of money to add them in the later stage.
3.The decoration of the rough house needs to pay attention to beautifying the appearance of the pipe. There are lots of plumbing in the bathroom and kitchen.
When decorating, the pipes should be properly beautified and decorated. In addition, you should pay attention to the sound insulation of the pipes, otherwise you will always be disturbed as a downstairs resident when the upstairs neighbor flushes the water. There are many steps to go through from blank to hardcover.
After the basic installation of water and electricity is completed, there are also hard installations such as walls and floor tiles, and some units also need home decoration layout. If you want to do personalized decoration, you need to put more effort into soft decoration. While ensuring the beauty of the furniture, we should also pay attention to practicality and convenience.
4.It is necessary to pay attention to the decoration of the rough room, and the unnecessary decoration can be simplified or omitted, such as the carpentry ceiling, TV background wall, and sofa background wall, which does not affect the occupancy. A simple plaster line can also be very decorative.
TV backdrops or sofa backdrops can also be decorated with simple latex paint. Sometimes simple things are unlikely to go out of style.
-
When inspecting the house, we need to check whether there is electricity in each room, and we need to check whether they are working properly in each room of the rough house. The sockets in each room cannot be forgotten either.
-
When decorating, you need to determine the design plan with the decoration company, and then start the decoration after confirming that it is correct; First of all, we should do the work of hydropower first, and during the construction process, we must keep a certain distance from the line, and we must ensure safety and reduce potential safety hazards.
-
When decorating a rough house, you should first measure the actual area of your house, and then level the walls and floors, and then design and construct.
-
The decoration process and precautions of the rough room are as follows:
First, inspect the house, design and planning first of all to carry out a thorough inspection of the house, check the original wall and ground conditions, check the original waterproofing situation, etc., and then no problem after the house can be planned and designed as a whole, and the decoration plan can be better carried out after the construction.
Second, the demolition and renovation project includes the need to dismantle the wall, windows, stairs, etc., in this link is mainly to pay attention to safety issues, can not be demolished randomly, to avoid the demolition of the load-bearing wall, and then other demolition should also be carried out under the premise of safety, otherwise it is easy to cause potential safety hazards.
Third, the concealed project is then to do hydropower transformation, to determine the location of the socket switch at home in advance, arrange the use of each space, the socket is not too much, it is best to arrange a few more than the preset, to facilitate future life, do a good job of hydropower transformation, followed by the kitchen and bathroom waterproofing, this must also be done, waterproof materials to be evenly coated, but also to do a 24-hour closed water test, to avoid leakage.
Fourth, the hydraulic engineering mainly on the ground, wall, bathroom, kitchen, etc. packaging, that is, laying floor tiles, porcelain tiles, here need to pay attention to the inspection of the hollowing phenomenon of floor tiles and porcelain tiles.
Fifth, carpentry, painter carpentry is mainly to work on the site of customized furniture, such as doors, door covers, backgrounds, ceilings, etc., painters are to polish the wall, oil, paint the furniture, pay attention to the aesthetics.
Sixth, the last link of laying the floor is to lay the floor, before laying the floor, the ground is leveled, and then paved, pay attention to the gap between the floor.
-
<> many people are very happy to get their new house, so the next step is to decorate, so what is its decoration process? First of all, we have to do a clean and a design of the rough house, so first of all, we should make a design, and then buy materials to scrape the wall white, at this time some materials will be selected, and finally when people design the materials can be decorated, this time the decoration is to choose some furniture or do some of their own happy style, so we must design some ** single in advance to make some preparations, so that the decoration is better.
And also to measure their own house, according to the ideas of some designers, combined with their own acres of Zheng ideas for comprehensive consideration, this circle will have some design direction and drawings, can change some of the shortcomings and space in the family, so many people will choose to redo some partition walls to change some style. At this time, we can change some of the layout of our home, so the wallpaper on the wall and scraping some examples are the last thing, and we can only use it when the renovation is almost over.
One of the things we are most concerned about is the style of decoration, the choice of wallpaper and furniture and the choice of home decoration are very important, so we must understand that the color matching of the decoration is very important, so that the overall style looks better. And when you want to change the layout of your home, you must understand that some load-bearing walls at home cannot be dismantled, because it is carrying a lot of weight, so you must understand the importance of load-bearing walls, which cannot be replaced and disassembled. Therefore, when we usually design our own house, we can make some collocations and choices from the appearance or furniture, which are more important aspects.
-
The rough house must be inspected first, and then decorated according to your own preferences and the type of room; First of all, the room should be demolished, the floor should be laid, the walls should be painted, and the furniture should be placed, and then optimized; It should be noted that it is necessary to grasp the water leakage system of the room, and consider a variety of factors when carrying out demolition and modification.
-
It is necessary to understand the layout of the house first, and first understand the overall length, width and height and the corresponding operating ratio. It is possible to lay the wall tiles first, then the floor, then the time modification, and finally the adjustment of the wiring. Then in the installation of furniture, in the installation of doors and windows.
To this decoration step, you should also pay attention to the decoration process, also pay attention to the use of some materials, pay attention to the environment of the home, and also pay attention to the formaldehyde content.
-
You need to measure and design in advance, choose the right style according to your preferences, and then hand it over to the decoration company for operation, you must pay attention to the choice of materials, pay attention to the cost.
-
Don't just look at how much the board is, now the board of the integrated ceiling has been done very well, you can choose the ordinary brand of the board, mainly on the ceiling appliances, the brand of electrical appliances is too high, you can buy ceiling appliances online, you can also save a lot of silver. Before decoration, it is necessary to clarify the area involved in the decoration process, especially the tile area, wall tile area, wall paint area, wallpaper area and floor area; Secondly, it is necessary to clarify the size of the wall, especially the size of the wall where the furniture needs to be placed. Determining the overall style of the room is only the first step in the design.
Next, every detail has to be designed. Including walls, floors, suspended ceilings, TV walls, sofa walls, window sills, furniture and even switches, sockets, faucets location, quantity, style, etc.
<> decorate according to the order of the process, and at the same time choose to purchase decoration materials according to the order of the process. In the first process of decoration, the decoration company will come to measure the ruler for free, and choose different materials and make a quantity budget according to the different uses of the room, including the first aspect of materials and so on. After the overall wall is leveled and dried, the dust is cleaned and the waterproof paint is made three times.
The first waterproof paint smooths the wall, and the last two waterproof paint walls are brushed vertically and horizontally to avoid not brushing the waterproof paint parts. The floor is uneven, and there will be a sound when stepped on after the floor is installed, which will reduce the service life of the floor. After the installation of the wooden floor, the next step is to install hardware, bathroom, curtains, lighting accessories, etc., and the hard decoration is basically over.
Next up is the soft furnishings.
Before the renovation construction, the construction site needs to be protected accordingly. Including the protection of elevators and entrance doors, the protection of strong and weak electric boxes and gas meters and water meters, the protection of wire boxes, toilets, and sewer covers, construction protection is the most basic project for decoration, and the decoration of the rough house can be divided into these steps: determine the design scheme, measure the room during the design, transform the space layout, transform the water and electricity, bricklayer project, oil project, carpentry project, sanitary ware and other installation, and clean the wasteland.
-
The second step is to change the water and electricity, then lay the bricks, scrape the putty, let the carpenter hit the cabinet, and then you can buy furniture and ceilings. When decorating, you must pay attention to the waterproofing of the bathroom, and you must buy your own materials, don't be deceived, and be sure to shop around when you buy things.
1. What is a rough house?
The so-called rough house is also known as the initial decoration house, most of such houses only have door frames, no doors, and the walls and floors are only done with foundation treatment without surface treatment. >>>More
The steps and methods of water and electricity decoration of the blank room are as follows: >>>More
First of all, it is necessary to clarify the area of the decoration of the rough house: the size of the ground, the size of the wall, the size of the doors and windows, the size of the usable area of each house, and then according to these data, the number of decoration materials that need to be used, the size of the purchased furniture and the area to be reached, and finally a reasonable overall decoration plan for the design of the blank house. >>>More
If it is a newly bought rough house, it is likely to be a rough cement wall that has not undergone any treatment. In order to decorate the wall conveniently, you may ask how to decorate the cement wall. If we force the wallpaper on the cement wall, it won't be long before it will fall off on its own. >>>More
Many people pay special attention to the education of their children in the family, because they feel that their children are the goals they want to strive for. And for themselves, if their children are in a better development situation, it will also affect their own development。But for many people, taking care of their own children is equivalent to the existence of a rough house. >>>More