-
In the process of house renovation, water and electricity construction should take precedence over heating installation. Because hydropower construction is the basis of decoration, involving the layout of wires and water pipes of the whole house, if the heating is installed first, it may have an impact on the hydropower construction, and even the heating needs to be removed for construction, which increases unnecessary trouble and costs.
If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].
In the local market, the ** of hydropower construction is usually between 50-100 yuan per square meter, depending on the difficulty of construction and the choice of materials. The heating installation is between 100-200 yuan per square meter, and it will also vary depending on the type and brand of heating chosen.
Therefore, it is recommended to plan the layout of water, electricity and heating at the beginning of the renovation to avoid later modifications and adjustments. After the completion of the hydropower construction, the installation of heating can ensure the sequence and quality of the construction, and also effectively control the decoration budget. At the same time, choosing an experienced and reputable construction team can ensure the quality and efficiency of construction and avoid decoration delays and increased costs caused by construction problems.
Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget, want to find a good company, learn more about decoration knowledge on Tuba Rabbit, click here, free 1 to 1 for your home decoration services: [Tuba Rabbit ** official website].
-
Introduction: In the cold winter, if there is heating in the home, it is very comfortable, and in the decoration process, many people do not know whether to install water and electricity or heating first. There are also some people who directly consider installing heating after the installation of water and electricity, in fact, this will cause a lot of inconvenience to the decoration company and heating company.
For the installation of underfloor heating, the radiator sequence is not the same. Let me tell you whether you should install heating or water and electricity construction first when decorating?
First, the radiator installation sequence.
During the renovation process, when the indoor structural wall is built, the radiator installation pipe can enter the site for construction. The premise is that it is necessary to hand over with the decoration company to determine the location of the wall-hung boiler, the reserved location of the gas pipeline, the location of the radiator, etc. Therefore, the construction time of the radiator installation is earlier than the installation time of the water and electricity.
After the heating pipe is installed, the renovation company will enter the site again. The main reason is that the HVAC company uses a gusset to protect the construction pipeline after slotting, and the decoration company uses cement backfill to protect the pipeline. The gusset of the HVAC company can be picked up directly.
The cement backfill used by the decoration company is easy to damage the water and electricity lines if the heating is installed in the later stage of construction.
Second, the installation sequence of floor heating.
In order to facilitate maintenance, do floor heating first, level above and then pave water and electricity, even if there is a problem with floor heating in the later stage, you can still smash the ground, without hurting the water and electricity above, because hydropower has real drawings if you do hydropower first, and then do floor heating, floor heating pipes are densely spread all over the house, after moving in, the waterway and circuit are different loads, the probability of problems is the greatest, once there is a problem, how can it be through the dense pipes of floor heating, smash the ground open, find the problem of water pipes or circuits? Floor heating is basically done in the north, rarely done in the south, when buying a house, the developer will first do all the floor heating, and backfill. Therefore, when buying a house, you still have to keep your eyes open and choose carefully.
In fact, these are not all absolute, even after the house is renovated, it is possible to install heating, at this time you can take the installation of heating. It can also play a role in heating.
-
Radiator. The installation can be divided into two forms: surface installation and concealed installation, surface installation radiator is more convenient, even after the decoration can be entered at any time. Generally speaking, everyone chooses concealed clothing. There are various steps such as grooving, laying pipes and installing water separators.
The pipeline should be done in advance, but as for the radiator installation time, it should be arranged after all the procedures on the wall of the house have been processed, so as to create a good installation effect, which will not affect the painting work of the wall and will not cause damage to the floor.
What exactly is science? It can be divided into the following steps:
The first step is to conduct a field survey. Before the installation of the radiator, have a preliminary understanding of the user's home, measure the area of the house, select the installation location, survey the water quality, etc., design the installation plan, and select the appropriate radiator installation according to the design plan.
The second step is to locate the groove and lay the pipeline. Grooves are made in the walls and floors to bury exposed pipelines, and the depth or width of the grooves needs to be handled by specialized installers according to the actual situation. The heating pipes are laid one by one along the slotted part, and a card groove is set in the laying.
Here is a special reminder that the pipes must be properly insulated, and some installation teams cut corners, resulting in poor heat insulation in the room.
The third step is the water collector.
Installation. The arranged pipelines are connected, welded, and the manifolds are installed. When installing the water separator, pay attention to keep it parallel to the ground, and remember to wipe the water separator dry when finished.
The fourth step is the stress test.
It is a particularly important step to install the radiator, close the main connection valve before the test, and then open the radiator inlet valve with pressure test equipment to test, the experimental pressure should be times of the normal use pressure, and can not be less than the test pressure of the whole community, there is no leakage within 3-5 minutes.
The fifth step is to install the radiator. Place the radiator smoothly, connect the valve connector and the inlet and outlet valves together, check whether the radiator is straight, ensure that there are no special circumstances in the pipeline installation, and then strengthen the screws at the connection point.
After that, check and accept. After the installation is completed, the stamping test is carried out, and there is no water leakage, water leakage, and water running, that is, the acceptance is qualified. The radiator system is only now fully installed.
Whether it is laying pipes or installing radiators, you must find a professional team, so as to avoid a lot of unnecessary trouble. In addition, after-sales is also an important consideration for ten minutes, we should try to choose a big brand manufacturer, although the ** will be slightly higher, but the later stage will save you a lot of time and labor costs.
-
Although the installation of radiators is not too complicated, for ordinary home users, it is better to ask a professional installation team to install radiators. If there is no preparation in the early stage of installation, it is likely to affect the use effect of the heating season, so what preparations do we need to do in the early stage of installing radiators?
The installation of radiators precedes the renovation.
Renovation or installation of radiators first? It is estimated that many renovation owners will have this question. Correct is:
Install the radiators first. For newly renovated families, the installation of radiators involves pipeline transformation, so it is good to make a good choice at the beginning of the decoration design, but because the home decoration project has "non-repeatability", no matter when the decoration is made, the installation and replacement of the radiator must be taken into account. Remember, after the radiator is installed, it must be pressed and tested.
Where to install the radiators.
There are three ways of heat dissipation of radiators: conduction, convection, and radiation, and steel radiators are mainly radiation, and copper-aluminum composites, aluminum alloy radiators have two forms of convection and radiation. The location of the radiator should be installed well, and the specific placement should vary from person to person, and the decoration style and furniture placement should also be considered. General principles of radiator installation location:
Under the window, by the window, out of the way, put inward.
Because the heat of the radiator is dissipated, the installation position is generally suitable for installation under the window sill. This has two benefits:,1Because the radiator is close to the ground, it can convection all the air in the room, so the room temperature is balanced;
2.As soon as the cold air comes in through the cracks in the window, the radiator heats it up, which acts as an anti-cold barrier and forms a certain barrier against the cold air.
If the room has no windows, the living room is more placed on the narrow walls on both sides of the sunny side, which is more space-saving and relatively reasonable and economical. If you use a radiator in meters, you can put it on the side wall in the bedroom, as in the case of a radiatorA 5-meter high radiator can be considered for placing on the side wall of the bedroom with a window.
It is necessary to pay attention to the radiator not to be too close to the bed, because the surface temperature of the radiator is high, the heat emitted is large, and it is easy to dry out, which affects the quality of sleep. At the same time, the installation of radiators needs to match the decoration style, whether it is an old house or a new house, the installation position of radiators are particular.
-
During the renovation, the water and electricity construction was carried out first, and then the heating was installed.
People's quality of life is constantly improving, many people have moved from the countryside to the city, and after buying a new house, they will face the big problem of decoration. For the first installation of heating or hydropower construction, most people will choose hydropower construction first, because this can better avoid decoration accidents, but it should be noted that before the hydropower construction, we must first learn to reserve sockets, draw a circuit diagram in advance, can better protect our lives from being affected.
1. Which should start the heating or hydropower construction first?
Living in a heated house allows us to feel warm all around, which is one of the benefits of residents nowadays, but it should be noted that water and electricity must be installed before installation, and floor heating must be installed. The installation of hydropower and the overall installation of the cable are not the same, and hydropower is a hidden project, and some places need to dig up the ground, which has a certain degree of concealment, so we must know the decoration sequence in life to avoid affecting their normal life because of operation errors.
2. What things need to be paid attention to in home decoration?
Before the decoration, most families will choose to use the wall-hung boiler, be sure to communicate with the water and electricity master in advance, according to the requirements of floor heating, the hot and cold water pipes are embedded in the designated position so as not to affect our normal use. For hot water circulation, it is best to use the circulation pipe to meet our requirements, and at the same time, it is necessary to reserve enough power sockets, which can better reduce the danger of users using the drag line board.
3. What is my personal opinion?
I think decoration is a big project, we can check the relevant information from the Internet before decoration, whether it is the installation of wall-hung boiler or floor heating to learn to predict in advance, for the installation of radiators, it is best to use the direction of synchronous construction of water and electricity, so as to better avoid the situation of pipeline crossing on site.
-
The water and electricity should be decorated first, and the heating should be decorated in the back, the decoration difficulty of the heating is higher than that of the water and electricity, and we should start from the simple to the difficult, step by step. If the order is reversed, it will increase the difficulty of decoration.
-
The heating must be installed first, because the heating should be installed before the water and electricity construction, otherwise the heating will have to be removed again.
-
Hydropower construction should be installed first, and then heating should be installed, so that the effect of the construction will not be affected, and the details can be dealt with.
-
When decorating, water and electricity construction should be carried out first, and then the heating decoration should be carried out. This is because the construction and decoration of water and electricity and heating are not the same, the first thing to do is that the laying of water and electricity is to lay water pipes and wire pipes on the ground, and then carry out the ground after the test is not a problem, and the regularity of the wall and floor heating is to install the floor after laying pipes on the ground. Moreover, if the heating is installed first, it is very easy to cause damage to the floor heating pipes and destroy the insulation board of the heating when installing water and electricity.
Heating, water and electricity work.
Hydropower is mainly a place that must be used in a family, and now the decoration is installed underground, which needs to be planned in advance and then installed, because the later stage needs to be installed with heating needs to be communicated in advance, and the floor heating is subject to the entire ground, and the installation of floor heating can make the whole house warm, so it is necessary to first water and electricity and then heating.
Renovation process. For the decoration process of the house, the main thing is that the decoration team is in the whole design scheme and material procurement of the house, and it is also necessary for the designer and plumber to enter the house site to determine the location of the water and electricity before starting the construction, if the house has a place that needs to be demolished and reorganized, it is also necessary to arrange workers to demolish the new wall at the same time, and to ensure the sewer pipes, to avoid causing damage to these pipelines and then carry out hydropower construction, because hydropower construction is very important, it is necessary to carry out wiring, Therefore, it is necessary to design well in advance, and after the construction of hydropower is completed, the hydropower will be accepted, and then the ground will be laid to install heating. After that, the walls and floors will be renovated, and if they need to be tiled, they can also be completed, and then they will be responsible for painting the walls.
Summary. Finally, the plumbing and heating works are installed when the new house starts, which is also because their system is carried out underground, so it is not suitable for renovating the house that has already been renovated.
When it comes to interior decoration, we generally do the laying of floor tiles before installing sliding doors. There are several reasons for this order. >>>More
When doing interior decoration, the order in which radiators are installed is an issue to consider. In general, the installation of radiators should be carried out before renovation. This is because the installation of radiators requires pipe laying, and if it is installed after renovation, it may destroy the finished renovation effect and increase the renovation cost. >>>More
The normal is to pave the floor tiles, gradually measure the customized cabinets, doors, door and window covers, etc., so as to gradually go on the carpentry, the carpentry is done gradually batch the wall, paint, after the customized cabinets, doors this kind of home, gradually assembled. Process: After making home furniture and carpentry, and laying bricks for interior decoration, it is necessary to gradually customize home furniture, wardrobes, kitchen cabinets, sprinkle cabinets, shoe racks, doors, door and window covers, etc. >>>More
Kitchen decoration, the procedure flow is generally: water and electricity decoration embedded parts, waterproof treatment, floor tile parquet, lighting power switch comes with it, ceiling, overall cabinet, stove kitchen appliances installation. In the case of people's decoration, the first ceiling or the first installation of the cabinet order is not necessarily, some people restaurant kitchen ceiling lamp selection is the modeling roof, that is, made of paper gypsum board, this kind of top needs to be carried out first, and more people choose the integrated ceiling, the order of installation is not certain, the pursuit of each person is not the same, kitchen decoration, not the first ceiling, not the first installation of cabinets, the first decoration of the wall and pavement, is the first paste of tiles, and then paving tiles, Below are the ceilings and cabinets. >>>More
When it comes to kitchen renovations, we usually install countertops first and then wall cabinets. The main reason for this is that the installation of the countertop needs to take into account the arrangement of the water and electricity pipelines, and the location of the wall cabinet needs to be determined according to the position of the countertop. Therefore, installing the countertop first can ensure that the position of the wall cabinet is more accurate, and avoid the poor decoration effect caused by position deviation. >>>More