The normal situation is to paste the tile first, because now basically the door needs to be customized, if the tile does not have a store sticker, its size can not be determined, so it needs to be tiled first. If the size of the door is measured without the tiles being paved, there will be a gap after waiting for the door to be installed, and it is easy to make mistakes in the size, which will affect the construction schedule.
The correct order is that after the tiles are good, the wooden door manufacturer should confirm the size measurement, and then customize the wooden door that suits you, because of good tiles, the height of the ground will rise accordingly, if it is still a wall tile, the thickness of the wall will change, so it can only be attached to the floor tile.
And wall tiles, wooden door manufacturers to stand up, and finally to determine the specific size of the door, from the response ruler to the wooden door has been made, it takes about two weeks, at this time the painter is doing the work at home, and so after the painter is finished, the wooden door has also been made, and then arrange the installation of the wooden door is very accurate.
<> the whole process of decoration of a family should be demolished and modified, water, electricity, wood, oil, and installation, so the decoration of this family is in, first of all, we must do a good job in the transformation of water and electricity, then the play of bricklayers, then waterproof wall tiles and floor tiles, then carpenters, and finally painters, and the installation is in the final stage, which includes the installation of wooden doors. For owners who don't know much about renovation, it's best to choose a renovation company with a good reputation in the local area.
Then develop a set of renovation plans. If the funds are limited, you can find a designer to make a design plan alone, and then find the construction team to decorate according to this design plan.
When decorating, install the door first or put the tile first? This is because after the floor tiles are pasted, the floor of the home has a clear elevation, and the thickness of the wall is also determined, and the size of the doorway is also determined. At this time, the wooden door manufacturer also needs to re-measure the site called the double ruler, the purpose of the compound ruler is to get the accurate size, so that the material production, so that it takes about two weeks, the wooden door can be produced, until the end of the decorative oil, the wooden door manufacturer can come to install the wooden door.
-
When decorating, install the door first, and the decoration procedure of the house must be the first water and electricity in the white, and finally the interior design.
-
The overall process of decoration is the first water and electricity renovation work, bricklayers, waterproof wall tiles and floor tiles, carpentry, and finally painters, and the installation is in the final stage, which includes the installation of wooden doors.
-
When decorating, the door is installed first. After the door is installed to clean the floor, then install the tiles, so that the tiles are not easy to break.
-
Whether it is tooling or home decoration, it needs to be constructed in accordance with a certain decoration order, otherwise it will have a certain impact on the decoration, and it will have to be reworked!
The reason why it is said that before installing the door cover and door, the tiles should be pasted first, because it is beneficial to follow such a decoration order.
Advantage 1 because after the tile is pasted first, the size of the door sleeve and the door can be ensured in advance, and the position of the door sleeve can be set out, so that it is more convenient to install, and the decoration process will become very orderly.
Advantage 2: Paste tiles first, and then install door sets and doors, which will be more conducive to edge closing; And after the tile is completely pasted, you can also choose which door cover according to the style and thickness of the tile, so that the overall appearance will be more beautiful.
The installer said that there is indeed such a situation, but all the interior wooden doors in my house must be tiled before installing the door cover and door.
The situation of installing the door first and then tiling it is: it should be a plastic steel door or an aluminum alloy door.
Because this kind of door is relatively simple, only the door frame has no door cover, so if you paste the tile first and then install the door, you can't close the edge, so after installation, the aesthetics will be greatly reduced!
It turns out that this first paste tiles or first install the door cover, the door, in the decoration order is really particular, in the end the first tile or the first door cover, but also to see the material of the door, now see my master on-site construction and explanation to understand, almost installed the wrong rework! I don't know if everyone is clear? If you want to decorate the home master professionally, look at the order of tiling and door covering, many people are easy to do in this regard.
-
Hello.
First, accuracy in this regard, the first tile is the best, because this can better ensure the size of the door cover, the position of the door cover in advance, and then according to the thickness and style of the tile to choose the door cover, different thickness of the tile to choose different door covers. It's very convenient to do so. On the other hand, during the installation process, there will be some small gaps in the middle, which will affect the aesthetics.
Second, the order of entry The normal decoration of the order of entry for electricians, bricklayers, carpenters, painters, so according to common sense to say that the tile is behind the door cover, of course, some people will say that the two can enter the site together, but have you ever thought that if you enter the site together, the whole site will become very messy, and the two types of work will affect each other.
Decoration process: 1. Appearance, demolition of the wall, building of the wall, installation of sanitary ware. 2. Toilet and kitchen floor do 24-hour closed water test.
3. Chisel the trunking, hydropower transformation and acceptance. 4. Seal and bury the hidden hydropower renovation project of the trunking, and start the waterproof project without leakage in the closed water test. 5. Bathroom, kitchen with wall magnets.
6. Carpentry appearance, hanging ceiling, gypsum corners. 7. Cover door sets and window covers. Create a wooden cabinet frame.
8. Synchronous creation of various wooden doors, modeling doors and flat pressing. 9. Brush the wooden panel with dustproof paint (clear oil). 10. The marble countertop of the window sill is leveled and laid.
11. The wood veneer is pasted, and the lines are created and finely installed. 12. The wall base is engaged in, polished and leveled. 13. Household goods, stickers (protective edges) are pasted at the seams of the door.
14. The wall oil ici is at least three times. 15. Furniture paint, nail holes, paint. 16. Engaged in corners, laying floor tiles, solid wood or composite wood flooring, waterproof marble strips, baseboards.
17. Installation and debugging of lamps, sanitary ware, handles, and door locks. 18. Clean up and sanitize, repair the floor tiles, and withdraw from the site. 19. The internal acceptance of the decoration company.
20. The three parties will be formally accepted and delivered to the owner at the scheduled time. When you start to paint the wall, you need to batch putty, and the so-called putty is made of 108 glue, cooked rubber powder and double fly powder. The correct construction should be brushed with clean oil in the frame material profile, and then a layer of moisture-proof cotton should be laid on the wall in contact with the door frame.
This is especially true for kitchen and bathroom doors). If there is a wooden cabinet against the wall of the bathroom, moisture-proof cotton should also be placed. The height of the wall waterproofing can be differentiated, and the proper height is:
Bathroom to, kitchen to.
Third, aesthetics we install the door cover or tiles, in order to be aesthetical, after the first tile, we can design the size of the door cover according to the size of the site, and the installation can also be designed with ceramic tiles, even if there are some gaps, it is very small, does not affect the aesthetics.
-
According to the construction procedures of the decoration, the layout and water and electricity renovation is the first step to complete the workload, followed by ordinary wall and floor tiles, but the floor tiles need to be covered and protected. For interior doors, in addition to furniture installation, it is the last process. In other words, the installation of interior doors is a procedure after the decoration of the interior wall roof and ground is completed.
-
Thanks to the bricks, the bricks will be able to install the door frame in the future.
-
I said that the renovation is very laborious and time-consuming, and no one should refute it, right? If there is, it must be something that has not been experienced. It's a simple decoration procedure, what to do first and then what to do, and it has already made people in a fog.
There are countless regrets after renovation, and when you think about it carefully, the problems in the renovation process account for more than half. So,Install the door first or tile it first?What is the renovation procedure for the house?
Install the door first or tile it first?It is better to secure the door first and then apply the tiles.
Install the door first or tile it first?From the point of view of installation adjustment, after installing the door cover, install the floor socket wire, the door cover is cut and fixed, and the adjustment is tighter, so you don't need to worry about completing the baseboard.
Install the door first or tile it first?From the point of view of finished product protection, the first door can better protect the floor, styrofoam, glue glass, power tools and packaging chisels will not damage the tiles.
1. Pre-design.
The previous design is a very important step before the renovation. It is best to find a professional designer, talk to the designer about your ideas, communicate and improve, and design a satisfactory solution.
2. The main body is dismantled.
The renovation of the main body is a great project for home decoration. It must be remembered that loading walls and important structures can not be arbitrarily changed, as long as they are dismantled and rationalized to prepare for future decoration.
3. Hydropower transformation.
Then there is the transition to hydropower. It is very important to renew the water and electricity at home. It is necessary to prepare all kinds of cables, switch sockets, sinks and other materials, and you must choose high-quality ones.
4. Carpentry, masonry and wall painting.
The decoration of the house is the dirtiest, the carpentry, masonry and painted walls are dirty. Bricklayer is what people usually call clay brick projects. Everyone must prepare the materials for the tiles in advance. The painted wall project is to make the surface of the wall, putty and waterproof paint as well as the finishing layer ready.
5. Ceiling installation.
The installation on the ceiling must be very serious, otherwise it will affect all the effects of the home decoration, but also pay attention to the installation of lighting and fan exhaust to prevent future changes.
6. Install lamps and lanterns.
Lamps must be fully equipped when they are purchased. Downlights and wall lamps should be chosen according to the interior design to avoid improper installation.
7. Install the hardware.
The quality of the hardware that everyone buys must be good, because the bad purchase of hardware directly affects our daily life.
8. Pioneer cleaning.
Once the improvement of the house is complete, cleaning and pioneer work must be carried out. If you don't have time, you can ask a professional cleaning aunt to clean the dead corners of the house.
9. Bring furniture and electrical appliances in.
When buying home appliances, you should choose according to the decoration style of home decoration, and the effect is better.
10. Soft decoration.
Finally, arrange the dust curtains and tablecloths, as well as some accessories, in the room.
You can get it for free
-
When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps:
Week 1: Commencement procedures, self-measurement, pre-design and budgeting.
The second week: the main body is demolished, the wooden door manufacturer comes to measure, and the cabinet is measured for the first time.
Week 3: Plumbing renovation, waterproofing of toilets.
Week 4: Carpentry of the main ingredients.
Week 5: Tiling (installation of window sills, floor drains), installation of sleeve hood machine cabinets for the second measurement.
Week 6: Painting the walls and ceilings in the kitchen and bathroom.
Week 7: Gas and cabinet installation (sink and gas stove installed at the same time).
Week 8: Wooden door installation, floor installation, wallpaper installation (radiator installation).
Week 9: Switch and socket installation, lamp installation, hardware and sanitary ware installation, window pole installation, pioneer cleaning.
Week 10: Furniture Arrival, Home Appliance Installation, Home Accessories, Moving.
Door installation must be planned and measured in advance, because it can take up to a month to customize the door. Follow the steps above to install the door and tile the floor at the eighth week, so as to avoid damage and contamination of the tiles. There are several issues that need to be paid attention to in floor installation:
1. Before the floor is installed, let the manufacturer come to the door to survey whether the ground needs to be leveled or partially leveled.
2. Before the floor is installed, the ground should be cleaned and dry. On the second day of floor installation, you can make an appointment with wallpaper to pave. It is recommended that on the day of wallpapering, the floor should be protected first.
-
In general, it is recommendedTile first and then install the door。Here's why:
Convenient construction: When the tiles are not laid, there are no obstacles on the ground or wall, and the construction personnel can lay the tiles more conveniently.
Determine the height of the floor or wall: The final height of the floor or wall can be determined by tiling first, so as to ensure that the door frame and door leaf are properly fit, and that the door installation cavity will not be uneven or unsuitable due to changes in tile thickness.
Avoid damaging the door leaf: If the door leaf is installed first, and then the tile is laid, it may cause damage to the door leaf in the process of tile cutting, grinding, etc., which will affect the appearance and use.
It should be noted that when tiling, you need to consider the position and size of the door frame and leave enough space for the installation of the door leaf. At the same time, before installing the door leaf, it is also necessary to ensure that the tile is completely dry to avoid moisture deformation caused by excessive humidity.
-
Paste the tiles first and then install the door, so as to facilitate the construction.
When carrying out interior decoration, we usually carry out the construction of the ceiling first, and then the tiling is laid. This sequence is mainly based on the convenience of construction and the consideration of the overall effect. >>>More
When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps: >>>More
Bathroom decoration is good with tiles first; If the toilet is installed first, it will affect the laying of tiles, which will also cause waste of materials, if the tiles are then laid, so that the tiles can be cut according to the size of the toilet, and it will not affect the appearance and will not cause waste.
For bathroom decoration, first paste the wall tiles, pave the tiles, confirm that the tiles are cured and dry, and level the tile gaps to the waterproof and beautiful joints according to the process order, and then install them in the toilet. >>>More
In the process of renovating the bathroom and kitchen, in general, we will first lay the bricks and then install the door. This order is based on several reasons. First of all, the installation of the door needs to be carried out under the condition of a flat wall, and the paving of bricks can make the wall more flat, which is conducive to the installation of the door. >>>More