After the wall is demolished, can the bricks be used? How to use it well?

Updated on technology 2024-07-17
7 answers
  1. Anonymous users2024-02-12

    Of course, it can be used, scrape the mortar on the whole piece clean, water and moisten it before building, and it can be used, the effect is the same as the new bricks, there is absolutely no problem, and the old bricks we use on the construction site.

  2. Anonymous users2024-02-11

    Generally dismantled bricks are not recommended, but according to the reality. Many places are still buying second-hand bricks. There is one point, second-hand bricks can never be used in load-bearing parts, bricks with less corners and serious edges are not used, and relatively intact bricks can be used in non-load-bearing parts.

    The removed bricks need to be knocked off from the plastering cement, etc. on the top. Spray with water before masonry.

  3. Anonymous users2024-02-10

    Yes, the bricks of my house are used to build the walls.

  4. Anonymous users2024-02-09

    The old house wants to be renovated and wants to save money. So you can do some demolition work yourself, like removing those tiles from the old walls. Usually, we are kitchen and bathroom using wall tiles, and there are not many areas of the cause tiles, these jobs themselves can be completely disassembled and solved.

    How do you remove tiles from the wall? Let's take a look at the specifics.

    How to remove wall tiles.

    Methods & Steps:

    1.Prepare the deletion tool.

    Start by preparing disassembled tools, gloves, slings, trailers, etc. You need some tools to understand the situation. Men operate better, and men have a lot of power. It's weird to use the trailer and then look down as follows.

    2.Remove the utensils from the tiled walls.

    There should also be something else on the wall, such as shelves for hanging towels, shelves for kitchen utensils, etc. First, carefully remove these items and restore clean walls so that they can be disassembled.

    How to remove wall tiles.

    3.Remove from the bottom of the wall.

    When you remove it, first remove it from the first lower wall tile. If you remove it directly from the top, it will block the tiles below and remove the tiles below.

    How to remove wall tiles.

    4.Hit the bricks and release the tiles.

    Once you have completed all the preparations, start your work. Start by hitting the bottom brick with a tap and loosen the tile. After childbirth, the tiles are removed with gloved hands, carefully breaking the tiles.

    5.Pay attention to the various pipes within the walls.

    Some places on the wall need pipes, gas pipes, electrical pipes, water pipes, network cables, etc. Pay attention to these pipes and do not destroy them inside the walls or remove the tiles and cause new problems.

    How to remove wall tiles.

    6.When tapping the tiles, clean the width of the area.

    The disadvantage is that the removed tiles accumulate on the ground and a lot of things need to be removed. At this time, the cars mentioned above are useful. Use a cart to move the tiles, clean the site and continue dismantling until the entire wall tile is completely removed.

    You can get it for free

  5. Anonymous users2024-02-08

    Whether it is for those who buy a second-hand house or a new house, the demolition of the brick wall is an indispensable project to transform the spatial layout of the house, and for those who are about to carry out the project of demolishing the brick wall, everything should be based on safety issues. So what exactly should Qin Min accompany when carrying out the project? Here are the main points from the following:

    Planning work before demolition, specific work during demolition, and treatment work after demolition.

    Before the demolition of the brick wall, it is necessary to prepare a brick wall demolition work plan, according to the overall layout of the house, after contacting and discussing with the demolition team, under the condition of ensuring safety, design a qualified and feasible demolition plan design book, and purchase the required tools.

    In the process of demolition of the brick wall, first of all, remove the corresponding brick wall as needed, carefully avoid the load-bearing wall and water pipeline lines, etc., when demolition, all personnel who enter the house need to wear protective helmets to ensure safety, and the staff who carry out the demolition work should be carried out reasonably in accordance with the work steps. The house should have lighting tools with appropriate brightness to ensure the smooth progress of the demolition work when hitting the wall, it is worth noting that due to the demolition process, there is a lot of dust, so it is necessary to get the water in advance. When demolishing a wall with a connected brick wall, it is necessary to prepare the work with professional instruments before carrying out the demolition work, so as to avoid unnecessary losses.

    The demolished brick walls should be transported out in time to avoid the danger of accumulation and hinder the process. It is recommended to prepare more thick wooden planks to lay on the ground, because in the process of brick wall demolition, some waste falling to the ground will produce a lot of vibration and noise, affecting the brick wall demolition work and the normal life of other residents, thick wooden planks can reduce the sound and vibration caused by falling objects. Take it.

    After the completion of the brick wall demolition work, the first thing to do is to put the materials generated after the demolition to the specified accumulation place according to the local demolition waste disposal matters, and then remove the utensils in the house, and the fine dust generated is packed in bags for formal disposal.

    Brick wall demolition is a very dangerous project, which is stupid, and it must be planned in detail and carefully to minimize the risk factor.

    You can get it for free

  6. Anonymous users2024-02-07

    When the brick wall is removed, it should be done well. In daily life, the houses that were built before were built with red bricks, but after long-term use, the bricks are easily damaged, and we may want to demolish and build a new house. In fact, the removal of cement bricks is very slow, because such walls are relatively strong and difficult to remove, so it is necessary to find the right way.

    Before the demolition of the brick wall, the construction site was complex, and a special safety construction plan was studied. Provide complete safety protection products for demolition workers. Obvious warning signs must be set up in the construction area where the brick wall is removed, and non-construction personnel are not allowed to enter the construction area.

    When the demolition of brick wall works poses a danger to the safety of state facilities, corresponding protective measures must be taken. The construction site must set up obvious warning signs, take preventive measures, and set up a special person to be responsible. Non-staff are not allowed to enter the construction site without authorization.

    Before the demolition work, the construction unit must inspect the various pipes within the building and confirm that all pipes are ready for construction before cutting. First, use an electric hammer to knock holes on the top of the wall, pay attention to the distance between each hole is best about 1 meter, and avoid reinforcement in the wall; Put the rope into the hole and let a few people pull it hard until the wall falls, so that the wall can be removed quickly, but the damage to the wall is also relatively large. The demolition of brick walls is strongly affected by the natural climate and environment, and special attention is paid to the prevention and treatment of problems.

    At the end of each working day, engineers and technicians must visit the site to check that the object to be removed has been fenced for safety reasons. Noise is unavoidable during construction, so in order not to disturb other neighbors, try to work between 8 a.m. and 12 p.m., and do not start work at night and on weekends, so that the neighbors' wishes do not outweigh the losses.

    The brick wall was divided into sections when it was removed. The width of each section is approximately equal to the width of the moving scaffolding. Movable scaffolding must be maintained by a dedicated person, from top to bottom, kept level, and removed regularly.

    During the dismantling process, the construction personnel must stand on the platform and shall not stand on the column and wall to work. After the brick wall is removed, it must be transported to the construction dump and cleaned up on site. During construction, if you want to damage the wall slightly, you can remove the surface layer of the wall and tear it off layer by layer.

    Then slowly remove the bricks from the inside, which can effectively save costs.

  7. Anonymous users2024-02-06

    Here are the main points about the demolition of the brick wall:

    1. Preparation before dismantling the brick wall.

    1.Before the demolition of the brick wall, the construction site was complex, and a special construction plan for safety was studied.

    2.Develop a safety contingency plan.

    3..Provide complete safety protection products for demolition workers.

    4..The construction area of the demolition brick wall project must be marked with obvious warning signs, and non-construction personnel are not allowed to enter the construction area.

    5.When the demolition of the brick wall project poses a danger to the safety of Zhouguo's facilities, corresponding protective measures must be taken.

    6.Before the demolition work, the construction unit must inspect the various pipes within the building and confirm that all the pipes can be built before cutting.

    7.Define where the disassembled part is parked.

    Second, the demolition of brick wall construction methods and technical measures.

    1.Before construction, the brick wall and the surrounding area should be used appropriately to reduce the pollution of dust to the natural environment and realize the construction civilization.

    2.Depending on the actual site situation, the brick wall is demolished by manual demolition (using simple tools such as hammers, frames, shovels, tile cutters, etc.). When dismantling, it is forbidden to remove it by pushing and pulling from top to bottom.

    3.When removing a brick wall, divide the wall into sections. The width of each section is approximately equal to the width of the moving scaffolding. Movable scaffolding must be maintained by a person, from top to bottom, horizontally and removed regularly.

    4.During the dismantling process, the construction personnel must stand on the platform and it is forbidden to work on the surface of the column and the wall.

    5.After the brick wall is removed, it must be transported to the construction waste station and then cleaned up on site.

    3. Security measures.

    1.The construction site must uniformly follow the instructions of specialized technical personnel, and strictly follow the established methods and procedures.

    2.Demolition construction personnel at the construction site must obtain a qualification certificate before construction.

    3.When construction workers enter the site, they must wear safety helmets; Seat belts must be fastened while working, and seat belts must be hung low. It is strictly forbidden for workers to carry out construction work areas after drinking alcohol.

    4.Conspicuous warning signs must be set up at the construction site, and preventive measures must be taken, and a special person must be assigned to be responsible. Non-staff are not allowed to enter the construction site without authorization.

    5.In the process of demolishing the brick wall, enter the source sail in order, and it is forbidden to dismantle. When disassembling parts, prevent other parts from falling.

    6.After the demolition works are completed, there must be an acceptance process to complete and clean up the site and ensure the cleanliness of the surrounding environment and the safety of adjacent buildings and pipelines.

    7.The demolition of brick walls is strongly affected by the natural climate and environment, and special attention is paid to preventing and dealing with problems. After each working day, engineers and technicians must visit the site to check whether the removed object has been circled for safety reasons.

    In the construction process, we should adhere to the humanistic concept of "people-oriented" and take adequate safety measures. At the same time, we pay attention to the protection of the environment and follow the principle of living in harmony with the environment.

    You can get it for free

Related questions
12 answers2024-07-17

How to paint the wall, you need to treat the base wall before painting, and at the same time see if the base wall is firm. If there is a latex base that falls off when touched, it needs to be removed first, then leveled with putty, and then brushed with latex paint. >>>More

9 answers2024-07-17

You can use a soft towel or a feather duster to remove dust from the wall, in addition to using a vacuum cleaner to remove the wall polish paint and check whether the wall surface is irregular. If there are irregularities, they can be filled with cement mortar.

11 answers2024-07-17

White walls andBlack GateThe collocation is more coordinated and beautiful. If the decoration chooses black and white with this style, the larger the size of the door, the better, choose a natural color door, you can choose a color such as log, white, etc., which is not too bright, to see their preferences. Reddish-brown can also be matched, as long as the overall match is good, the home will look spacious and bright. >>>More

6 answers2024-07-17

Whether you need to scrape the wall after brushing the painted wall paper, first of all, depends on the degree of wall paint. It is best to do a simple test before pasting the wallpaper: cover the wet towel on the wall for more than ten minutes, and then gently rub the wall with your hands, if the paint does not fall down, you can paste the wallpaper directly; If the paint falls down, it means that the wall has begun to be pulverized, and if it is directly paved, it is easy to cause the base layer of putty to fall off, and the wall needs to be treated. >>>More

9 answers2024-07-17

You can still put wallpaper on uneven walls, but repair the walls before paving. Before plastering, the surface of the wall should be cleaned, including dust, loose objects, dirt, oil stains, etc. Secondly, there are obvious concave and convex parts on the surface of the masonry foundation, which should be used in advance with 1: >>>More