How many years does the renovation waterproof warranty last? The warranty period of waterproof works

Updated on home 2024-07-04
8 answers
  1. Anonymous users2024-02-12

    Waterproofing generally comes with a 5-year warranty.

    Within 5 years, if there is a water leak, you can go to the construction party to redo it for you. But hard installation, once done, the cost of rework is very high, and the repair is infinitely troublesome, it is best to do it when you do it, and prevent it from happening. Therefore, you should pay more attention to waterproof materials and specific waterproof construction, choose the best waterproof products, and then choose waterproof materials according to different waterproof construction parts.

    If it's a renovation company.

    If you choose the material, then you must pay attention to see if they are the brand products you choose, and also look at the position and height of the painting. If you choose your own materials, then you have to do a little more homework, and the decoration master to communicate more, set almost, look at what products they usually use, we use a lot of old stubborn mortar waterproofing agent and flexible crack resistance waterproof, one rigid and one flexible, basically the home is almost enough, waterproof performance is infinitely good, it is a very old brand for many years. If you have other waterproof needs, such as kitchen and bathroom, you can also communicate with the master, they generally know better, and you can master a little waterproof acceptance standard yourself.

  2. Anonymous users2024-02-11

    Measures for the Administration of Residential Interior Decoration and Decoration (March 5, 2002 Ministry of Construction Order No. 110 promulgated as of May 1, 2002) Article 32: "Under normal use conditions, the minimum warranty period for residential interior decoration and decoration projects is two years, and the leakage prevention of kitchens, bathrooms and exterior walls with waterproof requirements is five years. The warranty period shall be calculated from the date of completion and acceptance of the residential interior decoration project. ”

  3. Anonymous users2024-02-10

    What you are asking is how long is the warranty period of waterproof engineering?

    Under normal circumstances, it shall be determined through negotiation between the contractor and the custom-made person, that is, the owner of the house, or the warranty period agreed in the project contract. The warranty period of building waterproofing is mainly based on the contract between the construction unit and the construction unit.

    1. Warranty coverage of waterproof engineering.

    1) Roof waterproofing project.

    2) Toilets with waterproof requirements.

    3) Leakage prevention of rooms and exterior walls, etc.

    Second, the warranty basis of waterproof engineering.

    When the construction project contractor submits the project completion acceptance report to the construction unit, it shall issue a quality warranty certificate to the construction unit. The warranty certificate, the warranty scope, warranty period and warranty responsibility of the construction project shall be clearly stated.

    Article 40 of the Regulations on the Quality Management of Construction Projects Under normal use conditions, the minimum warranty period of construction projects is:

    A) infrastructure engineering, housing construction foundation engineering and main structure engineering, for the design documents specified in the reasonable service life of the project.

    2) Roof waterproofing works, toilets with waterproof requirements, rooms and external walls of leakage prevention, for 5 years.

    3) Heating and cooling system, for 2 heating periods and cooling periods.

    4) Electrical pipelines, water supply and drainage pipelines, equipment installation and decoration projects, for 2 years.

    The warranty period for other items shall be agreed between the employer and the contractor.

    The warranty period of the construction project shall be calculated from the date of acceptance of the completion of the project.

    Article 41 If a quality problem occurs within the scope of the warranty and the warranty period of the construction project, the construction unit shall perform the warranty obligation and bear the responsibility for compensation for the losses caused.

    Article 42 If a construction project needs to continue to be used after the reasonable service life has expired, the property owner shall entrust a survey and design unit with the corresponding qualification level to conduct an appraisal, and take measures such as reinforcement and maintenance according to the appraisal results to redefine the service period.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose.

    Villa Master.

  4. Anonymous users2024-02-09

    Legal Analysis: Under normal conditions of use, the minimum warranty period for waterproofing is five years.

    Legal basis: Article 7 of the "Measures for the Quality Warranty of Housing Construction Projects" Under normal use, the minimum warranty period of housing construction projects is: roof waterproofing projects, toilets with waterproof requirements, rooms and external walls of leakage prevention, for 5 years.

    Article 40 (2) of the Regulations on the Quality Management of Construction Projects Under normal use conditions, the minimum warranty period for construction projects is: 5 years for roof waterproofing projects, toilets with waterproof requirements, leakage prevention of rooms and exterior walls.

  5. Anonymous users2024-02-08

    The waterproof warranty is five years.

    The warranty period of waterproofing engineering is at least five years, and the relevant regulations indicate that under normal use conditions, the minimum warranty period for roofing waterproofing projects is five years, and the minimum period for leakage prevention in toilets, exterior walls and other areas with relevant waterproof requirements is also five years.

    Attention should be paid to waterproof construction:

    1. Main basic treatment. The first step in waterproof construction is to deal with the regional base with waterproof requirements, including removing the original decorative materials, dust, floating soil, cement, etc., all of which must be cleaned up.

    2. Pay attention to special parts. It is best to lay a layer of glass cloth on it, which can enhance the adhesion of waterproof coating and improve the waterproof effect.

    3. The closed water test cannot be less. After the waterproof construction, the closed water test must be carried out, it can check the quality of the waterproof construction, the waterproof project is completed and the sewer is sealed, and then the area of the construction waterproof layer is filled with water, wait for 24 hours, if the water level does not change significantly, it is qualified.

  6. Anonymous users2024-02-07

    The defect liability period arises because of the project warranty. If the waterproof warranty period is five years, it is very unfavorable to the contractor, so the defect liability period is established, and the defect liability period shall not exceed 24 months, and all payments will be paid at the end of the liability period, but the warranty period will continue to be performed. The specific differences between the two are as follows:

    1. The starting date of the warranty period shall be calculated from the date when the owner's engineer issues the project completion certificate;

    2. The defect liability period is calculated from the date when the project passes the completion (delivery) acceptance; If the project cannot be completed (delivered) and accepted within the prescribed time limit due to reasons attributable to the employer, the project will automatically enter the defect liability period 90 days after the contractor submits the completion (delivery) acceptance report.

    Second, the warranty period is different.

    1. Article 40 of the "Regulations on the Quality Management of Construction Projects" stipulates that "under the conditions of normal use, the minimum warranty period for construction projects is:

    1) Infrastructure engineering, foundation engineering of housing construction and structural engineering of the main town, the reasonable service life of the project as specified in the design documents;

    2) 5 years for roof waterproofing works, toilets with waterproof requirements, leakage prevention of rooms and exterior walls;

    3) Heating and cooling system, for 2 heating periods and cooling periods;

    4) 2 years for electrical pipelines, water supply and drainage pipelines, equipment installation and decoration projects.

    2. The defect liability period is generally 6 months, 12 months or 24 months, which is agreed by both parties in the contract management.

  7. Anonymous users2024-02-06

    Legal analysis: the warranty period for the construction of waterproof projects is 5 years. According to Article 40 of the Regulations of the People's Republic of China on the Quality Management of Construction Projects, under normal use conditions, the minimum warranty period for construction projects is:

    A) infrastructure engineering, housing construction foundation engineering and main structure engineering, for the design documents specified in the reasonable service life of the project. 2) Roof waterproofing works, toilets with waterproof requirements, rooms and external walls of leakage prevention, for 5 years. 3) Heating and cooling system, for 2 heating periods and cooling periods. 4) Electrical pipelines, water supply and drainage pipelines, equipment installation and decoration projects, for 2 years. The warranty period for other items shall be agreed between the employer and the contractor. The warranty period of the construction project shall be calculated from the date of acceptance of the completion of the project.

    Legal basis: According to Article 40 of the Regulations of the People's Republic of China on the Quality Management of Construction Projects, under normal use conditions, the minimum warranty period of construction projects is: (1) the reasonable service life of the project specified in the design documents for infrastructure projects, foundation works and main structure projects of housing construction; 2) Roof waterproofing works, toilets with waterproof requirements, rooms and external walls of leakage prevention, for 5 years. 3) Heating and cooling system, for 2 heating periods and cooling periods. 4) Electrical pipelines, water supply and drainage pipelines, equipment installation and decoration projects, for 2 years.

    The warranty period for other items shall be agreed between the employer and the contractor. The warranty period of the construction project shall be calculated from the date of acceptance of the completion of the project.

  8. Anonymous users2024-02-05

    Legal analysis: The state stipulates that under normal use conditions, the minimum warranty period for housing construction projects is: 5 years for roof waterproofing projects, toilets with waterproof requirements, leakage prevention of rooms and exterior walls; Heating and cooling system, for 2 heating periods and cooling periods; 2 years for the installation of electrical pipelines, water supply and drainage pipelines, and equipment; The renovation work will take 2 years.

    Legal basis: "Measures for the Quality Warranty of Housing Construction Projects" Article 7 Under normal use conditions, the minimum warranty period of housing construction projects is:

    A) foundation engineering and main structure engineering, for the design documents specified in the reasonable service life of the project;

    2) Roof waterproofing works, toilets with waterproof requirements, rooms and external walls of leakage prevention, for 5 years.

    3) Heating and cooling system, for 2 heating periods and cooling periods.

    4) 2 years for the installation of electrical pipelines, water supply and drainage pipelines, and equipment;

    5) The renovation project is 2 years.

    The warranty period for other items shall be agreed between the construction unit and the construction unit.

Related questions
5 answers2024-07-04

First of all, choose a waterproof material that is suitable for home decoration. It is recommended to choose the polymer cement-based waterproof coating slurry commonly used in home decoration, that is, the name on the market is: general-purpose, flexible, K11, JS, GS waterproof coating slurry, this kind of product is water-based coating, non-toxic, harmless and pollution-free, simple and fast construction, and cement substrate bonding tightly, long service life, strong waterproof effect, moderate and medium significant characteristics. >>>More

13 answers2024-07-04

The warranty period of different models and different brands is different, the warranty of the whole machine is one year and two years, and the warranty period of important components is different for several years, if you go to buy, you must ask clearly, because the gap between different brands is too big. Generally, the warranty period of big brands is relatively long, and the quality of air conditioning and maintenance services are relatively high-quality, such as Samsung's air conditioner, there is really no quality problem, and if there is a quality problem, you can contact Samsung customer service, and there is also a perfect warranty process.

7 answers2024-07-04

1. The waterproof membrane should be paved first, and the treatment should be straightened, and then the two ends of the membrane should be rolled up, and then the prepared cement mortar binder should be poured onto the base layer, and the waterproof membrane should be scraped evenly with a scraper, and finally the waterproof membrane should be pushed forward, and the air inside the membrane should be discharged in time, and the excess binder should be scraped out to ensure that the bonding rate of the waterproof membrane and the base layer is more than 85%. >>>More

2 answers2024-07-04

Now there are many houses that are not done well when they are being built, so we need to do a waterproofing at this time, but when we do waterproofing, we don't know what the construction plans are, and what are the materials, so we don't know much about these, soWaterproofing construction schemeOne. What are the waterproof construction schemes. >>>More

7 answers2024-07-04

The American permanent condensate DPS waterproof material has many advantages: water-based permeable crystalline inorganic waterproof material, completely penetrates into the concrete, and does not scree the protective layer. Do not sprinkle water for curing, do not stir, etc. >>>More