Now there are many houses that are not done well when they are being built, so we need to do a waterproofing at this time, but when we do waterproofing, we don't know what the construction plans are, and what are the materials, so we don't know much about these, soWaterproofing construction schemeOne. What are the waterproof construction schemes.
1.The waterproof construction party chain template has an overview of the project, but this part briefly describes the basic situation of the project object, such as the name of the project, geographical location, structural form, the specific location of the waterproof project, the area, the fortification requirements, the selection of materials and construction technology, whether it is a new project or a renovation project, etc. In the case of renovation work, it is necessary to explain the location of the leakage, the cause of the leakage, and the treatment method.
2.Waterproof construction plan, as well as construction organization, but according to the scale and characteristics of the project, set up a project management team, determine the management structure candidates, and prepare relevant engineering technical specifications, drawings, construction and other technical documents.
3.There is a construction plan for the waterproof construction plan, but according to the overall plan progress of the civil engineering, the construction plan of the waterproof sub-project is listed, including the number of construction personnel, man-days, and the amount of work completed, which can be expressed in the form of a cross-section diagram. When it is difficult to represent it in a diagram, the construction plan can be listed in the form of **.
However, some large-scale civil works need to be constructed in sections, so the waterproof layer should also be considered to cooperate with the construction in sections, and not only the planned cooperation, but also to take certain technical measures, such as the temporary protection of the closing position of each section, the connection treatment of the old and new mouths, etc.
Two. Building waterproofing construction materials are recommended.
1.First of all, asphalt materials. However, the main raw materials of asphalt are natural asphalt, petroleum asphalt and coal asphalt and other materials as the main raw materials, and there are many waterproof materials made of asphalt linoleum, so that there are also paper tire asphalt linoleum products, there are solvent-based products, as well as water-emulsion asphalt and other waterproof products, which have very good water resistance and durability.
2.There are also polyethylene polypropylene materials, but this kind of material is a coil processed by adding anti-aging agents, stabilizers and other adhesives to linear low-density polyethylene resin through hot melt direct pressing composite process, which has strong impermeability, high tensile strength, good low temperature flexibility, small linear expansion coefficient, good stability, non-toxic, strong deformation adaptability, wide temperature range, long service life and other good comprehensive technical properties.
3.Next, rubber-plastic materials. Raw materials such as neoprene, butyl rubber, EPDM, polyvinyl chloride, polyisobutylene and polyurethane, but can be made into elastic tireless waterproof membrane, waterproof film, waterproof coating, coating film material and ointment, cement, waterstop and other sealing materials, with high tensile strength, elasticity and elongation, good adhesion, water resistance and gas resistance, etc., can be used cold, and the service life is long.
At the time of waterproof construction, we don't know what construction plans there are, and what are the building materials under construction.
-
The waterproofing construction process of the bathroom is as follows:
1.Before construction, make sure that the base surface is clean and dry. Apply waterproof paint for the first time. Ensure that the coating is full and does not leak, can be tightly integrated with the base layer, will not crack, blister, fall off, and the thickness and height must also meet the standard.
2.Apply a second pass of waterproof paint. In practice, it should be separated from the first pass for a period of time to ensure that the first layer is completely dry, and then implement it after the coating is completely dry. The specific time should be judged according to the actual situation. The time is too short for the waterproof effect to be guaranteed.
Bathroom waterproofing measures:
It is best to find the leak point. During the inspection, the problem of the water pipe is the waterproof layer or some defects in the construction, such as the key leakage parts are not done; whether the thickness and height of the waterproofing layer are in place; Whether the waterproof layer is damaged by the later pipeline transformation, or the durability of the materials used is poor and cracks appear.
Once a leak is found, it is necessary to remediate the problem accordingly. If there is a problem with the pipeline, replace the pipeline in time; If the waterproofing layer is not in place, the waterproofing layer should be repaired. You can choose to repair the brick joint leak or redo the waterproofing layer with a paint product.
Master Villa provides you with local building policies, architectural drawings, villa design drawings;
1. The waterproof membrane should be paved first, and the treatment should be straightened, and then the two ends of the membrane should be rolled up, and then the prepared cement mortar binder should be poured onto the base layer, and the waterproof membrane should be scraped evenly with a scraper, and finally the waterproof membrane should be pushed forward, and the air inside the membrane should be discharged in time, and the excess binder should be scraped out to ensure that the bonding rate of the waterproof membrane and the base layer is more than 85%. >>>More
The main terms of the construction contract, also known as the construction and installation contract, are: (1) the name and location of the construction project; (2) the scope and content of the construction project; (3) The date of commencement and completion of the construction of the construction project and the date of commencement and completion of the intermediate delivery project; (4) The quality warranty period and warranty conditions of the construction project of the construction project; (5) the cost of the construction project; (6) Methods for payment, settlement and acceptance of the construction price of construction projects; (7) The date on which the construction design documents and estimates, budgets and technical data of the construction projects are provided; (8) Construction materials and equipment for construction projects and the deadline for entering the site; (9) Matters of mutual cooperation between the two parties; (10) Liability for breach of contract in the construction of construction projects.
In the case of a part-time construction site, it is generally charged according to the completed area, and the specific amount of money per square depends on the area.
First, first enter the venue to prepare:
1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More
Approval by the construction department and the communications management department.