-
Workers install exhaust fans to check whether the ventilation duct is installed and sealed. This is because some workers skip this step in order to save trouble, and then wait until you live in it, and the house will smell every day. Bathroom pendants, whether to install glass partitions, as well as lighting, heating, exhaust requirements, these are to communicate with the decoration company, workers to make a good disclosure, otherwise it is time-consuming, laborious and expensive to modify, and it also leaves the hidden danger of destroying the waterproof layer, and the positioning of the functional area is very critical.
<>The first stage of our bathroom renovation is to accurately arrange all the water facilities in the bathroom. At this time, it is required to have an accurate positioning size and the corresponding space size to meet our decoration needs. The water and electricity involved in the bathroom, there are sewer pipes, most of the sewage pipes have been changed in the south, and there are few changes in the north, and the drains are drained, so be careful not to block them, and always check whether they are unblocked, and the circuit generally does not fall to the ground The socket next to the mirror of the bathroom cabinet is known to everyone, so I won't talk about it, but there must be a small kitchen socket under the bathroom cabinet.
You don't need to make hot water pipes, only cold water pipes. It is extremely convenient to have hot water on the faucet.
Damage to the insulating skin of the wire, it will leak after a long time, so the wire is recommended to go to the wall or go to the top, and the socket ground wire of the bathroom must be connected to the equal grounding terminal of the bathroom. Joints and latches should also not be exposed. It is best to set up the switching power supply outside the bathroom to avoid leakage caused by moisture.
If funds are sufficient, the bathroom may wish to be powered by independent wiring, and it will not affect the use of the toilet when there is a short circuit in other places.
At the same time, it is also necessary to make the form of "dark floor drain", which is also the focus of the water and electricity construction of the sunken toilet. The sunken toilet mainly has an impact on the waterway, especially on the sewerage, and there is basically no difference in the circuit method. These specific contents must be planned and determined in advance, the more detailed the better, so that the plumber will understand your intentions, the effect you want, and know the reserved location of water and electricity, to help you realize your desire for the bathroom.
-
Then it is necessary to find a special worker to lay the water circuit, and it is necessary to carry out inspections.
-
The water and electricity in the bathroom must be safe to avoid electricity connection. And there should be a water trap on the socket. Prevents water vapor from corroding the socket.
-
Hydropower should go to the ceiling, so that in case it breaks down later, it is easy to repair.
-
Arrange all water facilities in the toilet appropriately. The most common water supply facilities for toilets are showers, toilets, wash basins, and washing machines. The first step in restroom renovation is to accurately arrange all the water facilities in the restroom.
At this time, we need to accurately locate the size and the corresponding space size to meet our decoration needs.
Confirmation of water points. At this point, we can accurately determine the position of the water point above the corresponding position of the wall. For example, the water supply pipe in a restroom is usually about 350 mm from the finished surface of the floor.
The water used for the washing machine is generally about one meter away from the finished surface of the ground. Similarly, for washbasins and shower rooms, draw water points on the walls as required.
Snaps and slots. At this point, we should cut off the line from the original reserved water supply point. This line was the layout of our later water pipe flow.
Therefore, when snapping the line, snap the line from the original water storage point of the toilet bowl to each new storage point. The width of the elastic wire is determined by the diameter of the water supply pipe installed in the trench. In general, it can be increased by two centimetres depending on the pipe installed in the trench.
Installation and acceptance of pipelines. After we have fully opened the ditch, we can arrange the water pipes in the ditch. When laying out the pipes, it is recommended that you choose the most commonly used PPR pipes and install them with the method of hot melt connections.
It is then tied with copper wire and fixed in the groove. After all pipes and fittings are installed, the local points in the pipe trench should be fixed with cement mortar before the pressure test. After the pressure test is qualified, the ditch is restored and the waterway reconstruction is completed.
We should first divide all the circuits within the restroom into a master circuit, which should be laid out from the indoor distribution box. There is a special leakage protection switch in the distribution box, that is, the main switch of the bathroom. At this time, it is recommended that you choose the 20A leakage protection switch, and then choose the 4 square copper core flexible wire.
Three wires are connected from the distribution box to our bathroom.
Arrangement of conduits. We need to confirm the power consumption point of the bathroom. The main confirmation here is the location of the wall socket and the location of the light switch.
For example, the most common sockets in the bathroom include the socket for the washing machine, the socket for the electric water heater, and the socket next to the vanity mirror, which need to be checked in advance. In addition, a junction box for exhaust fans is reserved above the top plate. In addition, light switches and ventilator switches should remain in place and installed.
-
We first have to plan the design of each area of the bathroom, if it is a non-sinking toilet, the original sewer pipe developer in the bathroom has been done, without changing the layout, we can directly use the original sewer pipe, I need to change the layout, we need to use the original sewer pipe to transform again, and at the same time can install sockets next to the toilet and on the top of the sink, so that it is convenient to install an electric toilet in the future.
-
First of all, the water and electricity of the house should be renovated, the waterway and circuit can be reconstructed, and the wires should be repaired, and the wires should be replaced, and the wires with a larger square should be replaced, and then the water pipes should be dredged.
-
When renovating the bathroom, you should first install the electricity, and then carry out the waterproofing work.
-
Hydropower construction is very important, how should water and electricity be done when decorating the bathroom?
Most of the installation methods of hydropower project routes are to go to the ground, go to the wall, and go to the top of the line. No matter which way, the route of the toilet hydropower project needs to be horizontal and vertical, mainly to facilitate the regular inspection of the middle and late assembly of small pendants to prevent the water and electricity line casing, when the toilet is decorated, the drainage pipe road is the pipe of all the tap water in the toilet. Basic restrooms generally have potable water as well as raw water.
It is very simple to deal with raw water, and it is generally a raw water pipeline embedded in the side of the toilet.
The waterway includes drainage and drainage pipes and water seepage, the drainage pipe is simply to discharge the sewage in the house, such as showering, brushing dishes, and draining the water after cleaning, and the water seepage is simply the tap water pipe, and there are many water machines and equipment in the toilet, and the water hammer effect is large, and the damage to the pipeline is also great. The water pipeline line goes to the top, which is conducive to the water pipe itself to resist the water hammer according to the vibration. The water pipe and the trunking road are not very waterproof, and the moisture-proof is not easy to seep, and the water will seep out of the pipe in the case of water leakage.
Because the toilet has heavy water vapor and is wet and cold for a long time, it is more suitable to set the power circuit on the roof. Lighting fixtures and power switches should preferably be protected with safety protection, and connectors and plugs do not have to be exposed. It is best to build the switching power supply circuit outside the restroom.
Nowadays, the common tap water pipes are almost all PP-R pipes, and this kind of pipe fittings are divided into cool water pipes and heating pipes.
For the design and construction of water and electricity for the installation of toilets, because the design scheme is the owner of the community and the master of water and electricity installation, the construction of the project is the master of water and electricity installation, and most of them rely on the experience of the master to accurately locate and make the requirements possible. Moreover, it has the effect of safety protection for the internal structure of the toilet and the external power flow into the toilet, which is the most important reliable natural barrier for the power supply circuit of the toilet.
-
The bathroom does not need to install too many sockets, just enough, so as not to cause unnecessary electric shock, water and electricity treatment to suit their own needs, must be waterproof, this is the most important.
-
First of all, the slotted wiring should be made on the wall, and then the wiring slot should be closed, and a layer of waterproof should be made before tiling.
-
Hydropower construction is very important, if the hydropower change is not good, it will bring great hidden dangers in the later use, so you must ask a professional master when changing the hydropower.
-
Whether it's a washbasin or a toilet, it's best to install a mixing valve so that it can be easily accessed in the future. When assembling other toiletries, remember to bypass the plumbing and power circuits on the walls. If you are afraid of forgetting the parts, you can check the archived photos of the waterworks and household appliances in advance.
When installing exhaust fans, workers should check whether the ventilation ducts are assembled and sealed. This is because some employees immediately ignore this step for better convenience, and then until you move in, there is a smell in the house every day.
The most common running water fixtures in the toilet are the integrated shower room, toilet, washbasin and automatic washing machine. The first stage of toilet renovation is to accurately lay out all the tap water equipment in the toilet in a timely manner. At this time, it is stipulated that there is an exact positioning size and the corresponding specifications of the indoor space, so as to meet the requirements of everyone's interior decoration.
At this point, one can pinpoint the location from the tap water location on the corresponding part of the wall. For example, the drainage pipe of the toilet is generally 350mm away from the finished surface of the road surface.
The tap water of the washing machine is generally spaced between the road surface and the upper and lower surfaces. Similarly, for washbasins, there are also whole shower rooms, and the tap water positioning points are drawn on the wall according to the requirements. If there is a safety precaution, the connector and lock should not be exposed.
It is best to build the power supply outside the toilet to prevent power loss caused by wet and cold. If the assets are sufficient, why not use a separately wired power supply system in the bathroom, and it is not easy to harm the application of the toilet when there is a short circuit in other places.
The fixed power circuit should be taken with a medium card with an interval of 80 centimeters, which not only ensures that the route is firm, but also prevents the route from bending down for a long time during the decoration and construction. Electrical outlets in the bathroom can be installed around the sink, above the automatic washing machine, behind the toilet and behind the electric water heater. The drainage pipe is simply to drain the sewage in the house, such as showering, washing dishes, and draining the water after cleaning, and the seepage is simply the tap water pipe.
-
First of all, it is necessary to make it waterproof, but also to protect it from moisture, then to renovate the wires, then to install the tiles, then to install the floor.
-
You can pull the water pipes and wires to the ceiling, so that if there is a problem, it is easy to repair.
-
First of all, we should plan in advance when decorating, for example, the hair dryer in the bathroom and the skill toilet washing machine should be planned, and when we plan in advance, we can actually avoid a lot of problems.
-
The main problem of water and electricity decoration in the bathroom is waterproofing, whether it is water or electricity, it must be waterproofed, and the ground should also be waterproofed to avoid water leakage.
-
The water pipe is best to go from the top of the toilet to facilitate the detection and maintenance of water leakage in the later stage. Toilet circuits, bathroom joints and latches are not able to be exposed to air. Toilet switches should be designed outside the restroom to avoid water.
-
Buy your own materials Ensure the quality of the water pipes Don't believe the renovation company's so-called horizontal and vertical It is money-saving.
The water pipes are all on the ground, and you can rest assured that they will be pressed and tested for water leakage after they are done.
Yes, the bathroom should have a separate set of 4 square wires, because the water must be connected to a leakage protection switch.
-
If you want to renovate the water and electricity in the bathroom, the best way is to dredge this circuit, and then this pipe should be dredged in all directions to achieve good results.
-
1.The size of the bathroom is small. After installing washbasins, toilets, and shower rooms, there is not much exposed wall area left.
Therefore, the size of the socket in the bathroom must be planned well to avoid the embarrassing situation that the toilet or basin is on top of the socket, resulting in the socket being unusable. The bathroom is a space with a bathroom function, and the floor is damp. If the circuit pipe is running on the ground, there is a concern that the pipe will break, and the long-term residential pipe will be flooded.
In addition, the bathroom is generally used as a suspended ceiling, so it is highly recommended to use a suspended ceiling for the circuit of the bathroom.
3.If you turn on the water when you don't need it in summer, autumn, and spring, the water heater will start frequently. If it is not filled with gas, it will also affect the service life of the water heater, or even shorten it by double because the service life of the water heater will be more than doubled.
It's okay to boil hot water this winter, but it's a waste to not need to catch fire again and again in the summer. There are many waterway schemes in the bathroom, and it is necessary to decide in advance the installation of various devices, such as water heaters, basins, showers, etc. In addition to the installation site, it is also necessary to consider whether to use hot water, which is a very critical detail and key point.
4.Before installing water and electricity in the bathroom, you must think about this kind of problem in advance, so as to perfect the bathroom decoration and avoid a lot of trouble in the future. Try to install two floor drains in the bathroom, because there is a shower room, and the location of the floor drain should be installed as standard, such as the lowest point of the entire slope, so that the drainage will be smoother when used in the future, and it is not easy to cause water accumulation.
At the same time, hydropower is a series of standardized requirements and designs, such as horizontal, horizontal and vertical, which do not allow for horizontal troughs over long distances. Through such design and construction, the aesthetics of hydropower after completion are very good, and it will be more convenient to maintain in the future.
It is a new material, compared with some traditional Chinese building backfill materials on the market, it has good strength and durability, so it belongs to a low-carbon and environmentally friendly backfill material. The use of it can make the concrete produce some countless independent small air holes, and do not communicate with each other, and the adhesion to the wall is also particularly strong, and its overall strength of water repellency characteristics is also very good, which immediately eliminates the need for the second moisture-proof operation of the plastering layer. >>>More
The bathroom is the most frequently used space, but although the bathroom is small, if you are not careful, it will affect the convenience of life in the future. So, how to perfect the design of bathroom decoration waterways and circuits? Today, I have compiled a note from the decoration master, let's take a look! >>>More
The bathroom water and electricity renovation of the old house is very difficult to do, and the reason why I say so is mainly because of the following four points:1. The bathroom area of the old house is very small; 2. The bathroom wall of the old house is very fragile; 3. The water and electricity renovation of the bathroom of the old house is easy to "hurt the innocent"; 4. It is difficult to plan the water and electricity renovation of the bathroom of the old house >>>More
1. The material process must meet the requirements of the company's specifications: all wires are made of famous brands such as pigeon brand BV wires, lighting circuit sockets air conditioners 4mm2, kitchens, bathrooms 4mm2, and grounding wires, especially emphasizing that DAEX general light (16) pipes or DAEX (16) B pipes, round tees, direct, locks, and yellow wax pipes should be used in the threading, and bellows, elbows, and equal diameter tees are never allowed. 1 16 pipes can only be used for one circuit, 20 can only be used for 6mm21 circuits and the circuit between the toilet bomb and the switch. >>>More
important
kk: [dj: [ >>>More